i
Transsion
Filter interviews by
I was interviewed before Oct 2022.
Stress testing is a type of software testing that evaluates the system's behavior under extreme conditions.
Stress testing involves testing the system beyond its normal operational capacity to see how it handles high loads.
It helps identify the breaking point of the system and how it recovers from failures.
Examples of stress testing include simulating thousands of users accessing a website simultaneously or overwhelming
Top trending discussions
Basic core Java, manual testing concept
SDLC stands for Software Development Life Cycle, which is a process used by software development teams to design, develop, and test high-quality software.
SDLC consists of several steps including planning, analysis, design, implementation, testing, deployment, and maintenance.
Each step in the SDLC is crucial for the successful development and delivery of software products.
For example, in the testing phase, test engineer...
I applied via Recruitment Consulltant and was interviewed in May 2024. There were 3 interview rounds.
Types of mortar in 2 phase include dry pack mortar and wet pack mortar.
Dry pack mortar is a stiff mixture of sand, cement, and water used for filling gaps and cracks.
Wet pack mortar is a fluid mixture of sand, cement, and water used for laying bricks and stones.
Other types of mortar include lime mortar, cement mortar, and epoxy mortar.
Language English Hindi
I was interviewed before Sep 2023.
Different software modules are separate components of a software system that perform specific functions.
Software modules are designed to be independent and reusable.
Each module has a specific purpose and can be tested individually.
Examples include authentication module, database module, and user interface module.
SDLC is the process of developing software through stages like planning, designing, testing, and deployment. Bug Life Cycle is the stages a bug goes through from discovery to resolution.
SDLC stands for Software Development Life Cycle
SDLC includes stages like planning, designing, coding, testing, and deployment
Bug Life Cycle includes stages like New, Assigned, Open, Fixed, Retest, and Closed
Bug Life Cycle helps in track
I applied via Naukri.com and was interviewed in Jan 2024. There was 1 interview round.
My framework is a hybrid framework that combines data-driven and keyword-driven approaches for efficient testing.
Combines data-driven and keyword-driven testing
Uses reusable test scripts and data sets
Supports both manual and automated testing
Provides detailed test reports for analysis
Github/Bitbucket are essential for version control, collaboration, code review, and project management in software development.
Facilitates version control by tracking changes made to codebase
Enables collaboration among team members by providing a centralized platform for sharing code
Allows for code review process to ensure quality and consistency
Provides project management tools like issue tracking and project boards
In...
Reasoning questions and other questions are asked in attitude round one to join
I applied via Walk-in and was interviewed in Jun 2022. There were 4 interview rounds.
11KV line and structure question
Structure work and working experience whose company work
I applied via Campus Placement and was interviewed before Feb 2023. There was 1 interview round.
The testing life cycle involves planning, designing, executing, and evaluating tests to ensure software quality.
The testing life cycle starts with test planning, where test objectives, scope, and resources are defined.
Next, test design involves creating test cases and test data based on requirements and specifications.
Test execution involves running the tests and recording the results.
After execution, the test results ...
A test plan needs to be created by identifying objectives, defining scope, determining test strategies, and documenting test cases.
Identify the objectives of the test plan
Define the scope of the testing
Determine the test strategies to be employed
Document the test cases and their expected outcomes
Include details about test environment and resources
Specify the test schedule and milestones
Identify risks and mitigation str...
I was interviewed before Jun 2021.
based on 1 interview
Interview experience
Assistant Engineer
134
salaries
| ₹1.5 L/yr - ₹4 L/yr |
Assistant Manager
96
salaries
| ₹4.8 L/yr - ₹10.5 L/yr |
Area Sales Manager
87
salaries
| ₹4.1 L/yr - ₹14 L/yr |
Engineer
86
salaries
| ₹2.2 L/yr - ₹4.5 L/yr |
Production Engineer
73
salaries
| ₹2.2 L/yr - ₹4.8 L/yr |
Samsung
Xiaomi
Huawei Technologies
Apple