Filter interviews by
Be the first one to contribute and help others!
I appeared for an interview in Sep 2024.
Amazing aptitute test with knowledge of all aspects of the industry
Great assessment of all the interview natures of the assignment for risk, protocol, and valuation.
I applied via Walk-in and was interviewed before May 2022. There were 2 interview rounds.
I have executed multiple projects in the last few years.
Developed a new website for a client using HTML, CSS, and JavaScript.
Created a mobile application for a startup using React Native.
Managed a team of developers to build a custom CRM system for a large corporation.
Implemented a data analytics solution for a healthcare organization using Python and SQL.
Designed and executed a social media marketing campaign for a no
I applied via Naukri.com and was interviewed in Nov 2024. There were 2 interview rounds.
Strike the workers to payment related
I applied via Naukri.com and was interviewed in Mar 2021. There were 5 interview rounds.
The percentage of steel in a pile varies depending on the type and design of the pile.
The percentage of steel in a pile can range from 0% to over 90%.
The type of pile (e.g. steel, concrete, timber) and its design (e.g. diameter, length, wall thickness) determine the percentage of steel.
Steel piles typically have a higher percentage of steel than other types of piles.
The percentage of steel in a pile can also affect its
Pile built-up above cut off level as per IS code
IS code specifies the maximum allowable pile length above cut off level
Pile length above cut off level should not exceed 3 times the pile diameter
Built-up pile above cut off level can cause structural instability and failure
Vertical tolerance for piles as per IS code
As per IS 2911-1:2010, the vertical tolerance for piles is +/- 25mm
This tolerance is applicable for both driven and cast-in-situ piles
The tolerance is measured at the top of the pile and at intervals of 3m along the length
If the deviation exceeds the tolerance limit, the pile may need to be rejected or remedial measures taken
Pile concrete consumption tolerance depends on various factors.
Pile diameter and length
Concrete mix design
Placement method
Quality control measures
Environmental conditions
Tolerance typically ranges from 5-10% of estimated consumption
Regular monitoring and adjustment of concrete consumption is necessary
Unit weight of steel is 7850 kg/m³
The unit weight of steel is the weight of a specific volume of steel
It is measured in kilograms per cubic meter (kg/m³)
The unit weight of steel is 7850 kg/m³
This value may vary slightly depending on the composition and manufacturing process of the steel
posted on 16 May 2021
I applied via Naukri.com and was interviewed before May 2020. There were 3 interview rounds.
I can join within two weeks.
I am currently serving a two-week notice period at my current job.
I have already completed all necessary paperwork and background checks.
I am ready to start as soon as possible.
I can adjust my start date based on the company's requirements.
I left my last company to pursue new opportunities and challenges.
Seeking growth and advancement in my career
Looking for a company with a better cultural fit
Wanting to broaden my skill set
Desire for a higher level of responsibility
Company downsizing or restructuring
It was just a aptitude test
Managed a team to implement a new customer relationship management system
Led a team of 5 employees to successfully implement a new CRM system
Coordinated with IT department to ensure smooth integration of the system
Provided training to staff on how to use the new system effectively
I want to join the firm because of its strong reputation, opportunities for growth, and alignment with my career goals.
Strong reputation in the industry
Opportunities for career growth and development
Alignment with my career goals and values
posted on 22 Apr 2022
I applied via Walk-in and was interviewed before Apr 2021. There were 3 interview rounds.
I applied via Approached by Company and was interviewed before Apr 2021. There was 1 interview round.
Assistant Manager
103
salaries
| ₹5.5 L/yr - ₹12.6 L/yr |
Senior Engineer
64
salaries
| ₹4.3 L/yr - ₹9.4 L/yr |
Assistant Engineer
54
salaries
| ₹2.8 L/yr - ₹5.2 L/yr |
Deputy Manager
53
salaries
| ₹6 L/yr - ₹18 L/yr |
Engineer
51
salaries
| ₹4 L/yr - ₹7.2 L/yr |
L&T Construction
Tata Projects
Shapoorji Pallonji Group
Kalpataru Projects International