Upload Button Icon Add office photos

Filter interviews by

TRACKS AND TOWERS INFRATECH Signalling Design Engineer Interview Questions and Answers

Updated 4 Feb 2022

TRACKS AND TOWERS INFRATECH Signalling Design Engineer Interview Experiences

1 interview found

Round 1 - Technical 
Round 2 - HR 

(2 Questions)

  • Q1. Why are you looking for a change?
  • Q2. Share details of your previous job.

Interview Preparation Tips

Interview preparation tips for other job seekers - More int

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. What is orifice std and types of taps
  • Ans. 

    Orifice std refers to standard orifice sizes used in engineering. Types of taps include flange taps, corner taps, and D and D/2 taps.

    • Orifice std refers to standard sizes of orifices used in flow measurement

    • Types of taps include flange taps, corner taps, and D and D/2 taps

    • Flange taps are used for large pipes, corner taps for small pipes, and D and D/2 taps for general applications

  • Answered by AI
  • Q2. What is pressure gauge operating range
  • Ans. 

    Pressure gauge operating range refers to the minimum and maximum pressure values that the gauge can accurately measure.

    • Pressure gauge operating range is typically specified by the manufacturer.

    • It is important to ensure that the pressure being measured falls within the gauge's operating range to ensure accurate readings.

    • For example, a pressure gauge with an operating range of 0-100 psi should not be used to measure pres

  • Answered by AI
  • Q3. What is straight length requirements for orifice flow element
  • Ans. 

    Straight length requirements for orifice flow element ensure accurate measurement by allowing flow to stabilize before reaching the element.

    • Straight length requirements typically range from 10 to 44 pipe diameters upstream and 5 to 22 pipe diameters downstream of the orifice.

    • These requirements help prevent flow disturbances and ensure accurate measurement of flow rate.

    • For example, if the pipe diameter is 4 inches, the ...

  • Answered by AI
Round 3 - HR 

(3 Questions)

  • Q1. Salary expectations and current ctc
  • Q2. Describe about yourself and other information
  • Q3. Why we should hire you and other similar questions.

Interview Preparation Tips

Interview preparation tips for other job seekers - Whatever in CV that will ve asked. Technically it is not very tough.

TRACKS AND TOWERS INFRATECH Interview FAQs

How many rounds are there in TRACKS AND TOWERS INFRATECH Signalling Design Engineer interview?
TRACKS AND TOWERS INFRATECH interview process usually has 2 rounds. The most common rounds in the TRACKS AND TOWERS INFRATECH interview process are Technical and HR.

Tell us how to improve this page.

Interview Questions from Similar Companies

Indus Towers Interview Questions
3.8
 • 173 Interviews
Tractebel Interview Questions
4.1
 • 42 Interviews
View all
Civil Site Engineer
24 salaries
unlock blur

₹1.8 L/yr - ₹4.2 L/yr

Site Engineer
19 salaries
unlock blur

₹1.8 L/yr - ₹4 L/yr

HR Executive
15 salaries
unlock blur

₹2.6 L/yr - ₹4.5 L/yr

Store Incharge
13 salaries
unlock blur

₹3.7 L/yr - ₹6.5 L/yr

Civil Engineer
8 salaries
unlock blur

₹3 L/yr - ₹5 L/yr

Explore more salaries
Compare TRACKS AND TOWERS INFRATECH with

Sterlite Power

4.0
Compare

Power Grid Corporation of India

4.4
Compare

Bharti Infratel

4.4
Compare

Indus Towers

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview