TRACKS AND TOWERS INFRATECH Quality Manager Interview Questions and Answers

Updated 27 Jun 2022

TRACKS AND TOWERS INFRATECH Quality Manager Interview Experiences

1 interview found

Quality Manager Interview Questions & Answers

user image AMIT KUMAR

posted on 27 Jun 2022

I applied via Walk-in and was interviewed before Jun 2021. There were 3 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Quality control civil.
  • Q2. Quality control and Lab test . documents related, pugmil / concrete Batching plant realated
Round 2 - Technical 

(1 Question)

  • Q1. Concrete work related, formation work.etc
Round 3 - Aptitude Test 

Suitability of your project work with civil quality norms

Interview Preparation Tips

Topics to prepare for TRACKS AND TOWERS INFRATECH Quality Manager interview:
  • Quality Control
  • Civil Construction
Interview preparation tips for other job seekers - Please assist for join a company. I am always prepare for interview.

Interview questions from similar companies

Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Sep 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Technical asked jm ushn hehe yen’s unable
  • Q2. Concrete technology reinforcement

Interview Preparation Tips

Interview preparation tips for other job seekers - Nothing special everything was fine hand jabs JS an

I applied via Naukri.com and was interviewed in May 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. What is SMPS BB
  • Ans. 

    SMPS BB stands for Switched-Mode Power Supply Broadband

    • SMPS BB is a type of power supply that converts electrical power efficiently

    • It is commonly used in electronic devices to provide stable and regulated power

    • SMPS BB operates at high frequencies, allowing for smaller and lighter power supplies

    • It is designed to handle a wide range of input voltages and provide a constant output voltage

    • Examples of devices that use SMPS ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Required Technician knowledge about infra

Skills evaluated in this interview

Interview Questionnaire 

1 Question

  • Q1. Qualifications is Quality Engineer

Interview Preparation Tips

Interview preparation tips for other job seekers - Quality Engineer and Project Engineer
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Apr 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(6 Questions)

  • Q1. How do you drive teams for achieving targets ensuring Quality and compliances.
  • Ans. 1) Morning Project concall 2) Monthly Targets 3) Tracking and monitoring across all projects in all business units
  • Answered Anonymously
  • Q2. How would you adopt & execute culture of best practices across circles
  • Ans. Replicating the performing circles best practices. Documenting the process and implementing the same in other circles
  • Answered Anonymously
  • Q3. How would you do CAPEX control
  • Ans. 

    CAPEX control involves managing and monitoring capital expenditures to ensure they align with budget and project goals.

    • Create a detailed budget for capital expenditures

    • Establish a process for reviewing and approving capital expenditure requests

    • Regularly monitor and track actual spending against the budget

    • Implement controls to prevent unauthorized spending

    • Analyze and report on variances between budgeted and actual expen...

  • Answered by AI
  • Q4. How would you determine the power loading requested by Telecom service provider is below actual energy consumption at site.
  • Ans. 

    To determine if power loading requested by Telecom service provider is below actual energy consumption at site, conduct a power audit.

    • Conduct a power audit to measure the actual energy consumption at the site

    • Compare the power audit results with the power loading requested by the Telecom service provider

    • If the power loading requested is lower than the actual energy consumption, it indicates a discrepancy

    • Investigate the ...

  • Answered by AI
  • Q5. How would you do asset management
  • Ans. 

    Asset management involves tracking and optimizing the lifecycle of assets to maximize their value and minimize costs.

    • Create an inventory of all assets, including their details and current condition

    • Implement a system to track the location and movement of assets

    • Establish maintenance schedules and procedures to ensure assets are well-maintained

    • Monitor asset performance and usage to identify opportunities for optimization

    • I...

  • Answered by AI
  • Q6. Guidelines of asset management
  • Ans. 

    Asset management guidelines involve strategic planning, tracking, and maintenance of an organization's assets.

    • Develop a comprehensive asset management plan

    • Identify and categorize assets

    • Establish a system for tracking and monitoring assets

    • Implement regular maintenance and inspection procedures

    • Ensure proper documentation and record-keeping

    • Consider lifecycle management and replacement strategies

    • Utilize asset management so...

  • Answered by AI
Round 3 - Case Study 

Example of wherein you maintain balance of Business exigency and compliance at the same time

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company with processes and good culture
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
-
Result
Not Selected

I applied via Recruitment Consulltant and was interviewed in Sep 2024. There was 1 interview round.

Round 1 - Technical 

(7 Questions)

  • Q1. What are the Pump head loss calculation parameters
  • Ans. 

    Pump head loss calculation parameters include friction loss, elevation change, velocity head, and fittings.

    • Friction loss due to pipe roughness

    • Elevation change between inlet and outlet

    • Velocity head due to fluid velocity

    • Losses from fittings like elbows, tees, and valves

  • Answered by AI
  • Q2. What is the AHU components
  • Ans. 

    AHU components refer to the various parts of an Air Handling Unit that work together to regulate and circulate air in a building.

    • Filters - to remove dust and particles from the air

    • Coils - for heating or cooling the air

    • Fans - to circulate the air

    • Dampers - to control the flow of air

    • Humidifiers/dehumidifiers - to adjust the humidity levels

  • Answered by AI
  • Q3. Which type of blowers are use in AHU
  • Ans. 

    Centrifugal blowers are commonly used in AHUs for their efficiency and ability to handle high volumes of air.

    • Centrifugal blowers are preferred for AHUs due to their ability to handle high volumes of air efficiently.

    • They are more energy efficient compared to other types of blowers.

    • Examples of centrifugal blowers commonly used in AHUs include forward curved, backward inclined, and airfoil designs.

  • Answered by AI
  • Q4. What is the difference between primary pump or secondary pump
  • Ans. 

    Primary pump is the main pump responsible for the majority of the pumping work, while secondary pump is a backup pump used in case the primary pump fails.

    • Primary pump is the main pump in a system, while secondary pump is a backup pump.

    • Primary pump is responsible for the majority of the pumping work, while secondary pump is used only when needed.

    • Examples: In a heating system, the primary pump circulates hot water throug...

  • Answered by AI
  • Q5. What is the AHU valve conection
  • Ans. 

    AHU valve connection refers to the connection of valves in an air handling unit for controlling the flow of air.

    • AHU valve connection is essential for regulating the flow of air in an air handling unit.

    • Valves are typically connected to the AHU ductwork to control the amount of air entering or exiting the unit.

    • Properly connected valves ensure efficient operation of the AHU system.

    • Examples of AHU valves include damper val

  • Answered by AI
  • Q6. What things are required in chilled water pipe size
  • Ans. 

    Chilled water pipe size requirements depend on flow rate, pressure drop, material, insulation, and system design.

    • Flow rate: Determine the required flow rate of chilled water in the system.

    • Pressure drop: Calculate the pressure drop to ensure efficient operation.

    • Material: Select appropriate pipe material based on temperature and pressure requirements.

    • Insulation: Insulate the pipes to prevent heat gain or loss.

    • System desi...

  • Answered by AI
  • Q7. What is the chiller conection
  • Ans. 

    The chiller connection refers to the method by which a chiller unit is connected to a building's HVAC system.

    • Chiller connection typically involves piping to transport chilled water from the chiller to the building's air handling units.

    • The connection may also include electrical wiring for power supply and control signals.

    • Proper chiller connection is crucial for efficient cooling and proper functioning of the HVAC system

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Sterling & Wilson Project Manager interview:
  • prepare in HVAC chiller system
Interview preparation tips for other job seekers - I advice to the job seekers gained the practical knowledge in our field.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Oct 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. About concrete ratios
  • Q2. How many ways of Concrete tests
  • Ans. 

    There are multiple ways to test concrete for quality and strength.

    • Compression test: measures the compressive strength of concrete

    • Slump test: measures the workability of concrete

    • Rebound hammer test: assesses the surface hardness of concrete

    • Ultrasonic pulse velocity test: evaluates the quality of concrete through sound waves

    • Maturity test: monitors the strength gain of concrete over time

  • Answered by AI
  • Q3. About is codes and is standard

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and be genuine

I applied via LinkedIn and was interviewed before Nov 2021. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Written test based on mathematical..analytical

Round 3 - Technical 

(1 Question)

  • Q1. Technical based upon telecom
Round 4 - HR 

(1 Question)

  • Q1. Hr round based upon family and salary

Interview Preparation Tips

Interview preparation tips for other job seekers - Focus upon the question based upon telecom only. Fundamentals and basic need of telecomunication
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I applied via Naukri.com and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Totally based on past experience
  • Q2. Totally past experience based interview
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Jul 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Question 1. Earthing related Question 2. Battery Bank backup related Question 3. SPD, SMPS related Question 4. Previous job profile related Question 4. Pole erection related.
Round 2 - HR 

(1 Question)

  • Q1. Salary discussion

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident for own field work

TRACKS AND TOWERS INFRATECH Interview FAQs

How many rounds are there in TRACKS AND TOWERS INFRATECH Quality Manager interview?
TRACKS AND TOWERS INFRATECH interview process usually has 3 rounds. The most common rounds in the TRACKS AND TOWERS INFRATECH interview process are Technical and Aptitude Test.
What are the top questions asked in TRACKS AND TOWERS INFRATECH Quality Manager interview?

Some of the top questions asked at the TRACKS AND TOWERS INFRATECH Quality Manager interview -

  1. Quality control and Lab test . documents related, pugmil / concrete Batching pl...read more
  2. Concrete work related, formation work....read more
  3. Quality control civ...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Indus Towers Interview Questions
3.8
 • 175 Interviews
Tractebel Interview Questions
4.1
 • 42 Interviews
View all

TRACKS AND TOWERS INFRATECH Quality Manager Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

3.0

Skill development

4.0

Work-life balance

4.0

Salary

3.0

Job security

3.0

Company culture

2.0

Promotions

3.0

Work satisfaction

Explore 1 Review and Rating
Civil Site Engineer
24 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Site Engineer
19 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

HR Executive
15 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Store Incharge
14 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Engineer
8 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare TRACKS AND TOWERS INFRATECH with

Sterlite Power

4.0
Compare

Power Grid Corporation of India

4.4
Compare

Bharti Infratel

4.5
Compare

Indus Towers

3.8
Compare