Filter interviews by
I applied via Walk-in and was interviewed before Jun 2021. There were 3 interview rounds.
Suitability of your project work with civil quality norms
I applied via LinkedIn and was interviewed in Sep 2022. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in May 2020. There were 3 interview rounds.
SMPS BB stands for Switched-Mode Power Supply Broadband
SMPS BB is a type of power supply that converts electrical power efficiently
It is commonly used in electronic devices to provide stable and regulated power
SMPS BB operates at high frequencies, allowing for smaller and lighter power supplies
It is designed to handle a wide range of input voltages and provide a constant output voltage
Examples of devices that use SMPS ...
I applied via Approached by Company and was interviewed before Apr 2022. There were 3 interview rounds.
CAPEX control involves managing and monitoring capital expenditures to ensure they align with budget and project goals.
Create a detailed budget for capital expenditures
Establish a process for reviewing and approving capital expenditure requests
Regularly monitor and track actual spending against the budget
Implement controls to prevent unauthorized spending
Analyze and report on variances between budgeted and actual expen...
To determine if power loading requested by Telecom service provider is below actual energy consumption at site, conduct a power audit.
Conduct a power audit to measure the actual energy consumption at the site
Compare the power audit results with the power loading requested by the Telecom service provider
If the power loading requested is lower than the actual energy consumption, it indicates a discrepancy
Investigate the ...
Asset management involves tracking and optimizing the lifecycle of assets to maximize their value and minimize costs.
Create an inventory of all assets, including their details and current condition
Implement a system to track the location and movement of assets
Establish maintenance schedules and procedures to ensure assets are well-maintained
Monitor asset performance and usage to identify opportunities for optimization
I...
Asset management guidelines involve strategic planning, tracking, and maintenance of an organization's assets.
Develop a comprehensive asset management plan
Identify and categorize assets
Establish a system for tracking and monitoring assets
Implement regular maintenance and inspection procedures
Ensure proper documentation and record-keeping
Consider lifecycle management and replacement strategies
Utilize asset management so...
Example of wherein you maintain balance of Business exigency and compliance at the same time
I applied via Recruitment Consulltant and was interviewed in Sep 2024. There was 1 interview round.
Pump head loss calculation parameters include friction loss, elevation change, velocity head, and fittings.
Friction loss due to pipe roughness
Elevation change between inlet and outlet
Velocity head due to fluid velocity
Losses from fittings like elbows, tees, and valves
AHU components refer to the various parts of an Air Handling Unit that work together to regulate and circulate air in a building.
Filters - to remove dust and particles from the air
Coils - for heating or cooling the air
Fans - to circulate the air
Dampers - to control the flow of air
Humidifiers/dehumidifiers - to adjust the humidity levels
Centrifugal blowers are commonly used in AHUs for their efficiency and ability to handle high volumes of air.
Centrifugal blowers are preferred for AHUs due to their ability to handle high volumes of air efficiently.
They are more energy efficient compared to other types of blowers.
Examples of centrifugal blowers commonly used in AHUs include forward curved, backward inclined, and airfoil designs.
Primary pump is the main pump responsible for the majority of the pumping work, while secondary pump is a backup pump used in case the primary pump fails.
Primary pump is the main pump in a system, while secondary pump is a backup pump.
Primary pump is responsible for the majority of the pumping work, while secondary pump is used only when needed.
Examples: In a heating system, the primary pump circulates hot water throug...
AHU valve connection refers to the connection of valves in an air handling unit for controlling the flow of air.
AHU valve connection is essential for regulating the flow of air in an air handling unit.
Valves are typically connected to the AHU ductwork to control the amount of air entering or exiting the unit.
Properly connected valves ensure efficient operation of the AHU system.
Examples of AHU valves include damper val
Chilled water pipe size requirements depend on flow rate, pressure drop, material, insulation, and system design.
Flow rate: Determine the required flow rate of chilled water in the system.
Pressure drop: Calculate the pressure drop to ensure efficient operation.
Material: Select appropriate pipe material based on temperature and pressure requirements.
Insulation: Insulate the pipes to prevent heat gain or loss.
System desi...
The chiller connection refers to the method by which a chiller unit is connected to a building's HVAC system.
Chiller connection typically involves piping to transport chilled water from the chiller to the building's air handling units.
The connection may also include electrical wiring for power supply and control signals.
Proper chiller connection is crucial for efficient cooling and proper functioning of the HVAC system
I applied via Naukri.com and was interviewed in Oct 2023. There were 2 interview rounds.
There are multiple ways to test concrete for quality and strength.
Compression test: measures the compressive strength of concrete
Slump test: measures the workability of concrete
Rebound hammer test: assesses the surface hardness of concrete
Ultrasonic pulse velocity test: evaluates the quality of concrete through sound waves
Maturity test: monitors the strength gain of concrete over time
I applied via LinkedIn and was interviewed before Nov 2021. There were 4 interview rounds.
Written test based on mathematical..analytical
I applied via Naukri.com and was interviewed in Aug 2023. There were 2 interview rounds.
I applied via Referral and was interviewed in Jul 2023. There were 2 interview rounds.
based on 1 review
Rating in categories
Civil Site Engineer
24
salaries
| ₹0 L/yr - ₹0 L/yr |
Site Engineer
19
salaries
| ₹0 L/yr - ₹0 L/yr |
HR Executive
15
salaries
| ₹0 L/yr - ₹0 L/yr |
Store Incharge
14
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Engineer
8
salaries
| ₹0 L/yr - ₹0 L/yr |
Sterlite Power
Power Grid Corporation of India
Bharti Infratel
Indus Towers