Toyo Engineering Construction Site Engineer Interview Questions and Answers

Updated 30 Aug 2023

Toyo Engineering Construction Site Engineer Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Aug 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Group Discussion 

Job specific questions.

Round 3 - HR 

(3 Questions)

  • Q1. Regarding skill and why you're join this firm.
  • Q2. Why you'rejoin this firm.
  • Q3. Why you left previous company
Round 4 - Technical 

(3 Questions)

  • Q1. Only job related question as per your designation.
  • Q2. What we should do when any emergency come during job.
  • Q3. How many tons load taken a single weld tick .
  • Ans. 

    The load taken by a single weld tick depends on various factors such as the type of weld, material being welded, and welding technique.

    • The load taken by a single weld tick can vary depending on the type of weld being used (e.g. fillet weld, groove weld, plug weld).

    • The material being welded also plays a significant role in determining the load capacity of a single weld tick.

    • The welding technique and quality of the weld ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Always talk politely and clear pitch and experience more than 6 years.

Interview questions from similar companies

I applied via Referral and was interviewed before Apr 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Maintenance phylosophy
  • Ans. Depends on equipment running hour, criticality, availability and standby.
  • Answered Anonymously

Interview Preparation Tips

Topics to prepare for Thermax Limited Senior Engineer interview:
  • Boe
  • Energy manager
Interview preparation tips for other job seekers - Be confidential and technically strong.

Interview Questionnaire 

3 Questions

  • Q1. PSC girder
  • Q2. Minor bridge
  • Q3. Related

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

I applied via Referral and was interviewed in Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Technical questions relating to our job in deep. That's it

Interview Preparation Tips

Interview preparation tips for other job seekers - Whatever you know about say genuinely and be confident always. Don't hesitate at all.
Put your thoughts clearly.

I applied via Naukri.com and was interviewed before May 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Write the equation for dynamics and wave spectra equations. I do not remember questions as it is 3 years back.

Interview Preparation Tips

Interview preparation tips for other job seekers - This happened in Technip FMC Hyderabad, India. I hold 10 years experience. Interviewers don not know what to get from the candidates. The panel tried to prove within themselves that can ask difficult questions. The even entered to doctorate level questions which is not valid for performing job. Finally, I conclude that they performed some time-pass session.
Interview experience
2
Poor
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Referral and was interviewed in Sep 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. 1. Safety valve types and selection criteria 2. Thermowell Design concept 3. Diff. Pressure Type Flow meter concept and criteria 4. Cable construction details 5. Hook-Ups details
  • Q2. 1. Installation details 2. Flowmeter straigth lengths requirement

Interview Preparation Tips

Interview preparation tips for other job seekers - On which things you worked on , all basics and details things shall be clear.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Apr 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. PAST EXPERIENCE QUESTIONS

Interview Preparation Tips

Topics to prepare for L&T Energy Hydrocarbon Senior Engineer interview:
  • Piping
Interview preparation tips for other job seekers - GET DETAILS OF CODES AND STANDARDS YOU USED IN WORK

I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.

Interview Questionnaire 

6 Questions

  • Q1. Can you explain Man day
  • Q2. Can you explain manpower mobilization.
  • Ans. 

    Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.

    • Identifying the required personnel for a project

    • Recruiting and hiring personnel

    • Training and orienting personnel to the project

    • Assigning roles and responsibilities to personnel

    • Managing personnel performance and productivity

    • Ensuring compliance with labor laws and regulations

    • Examples include mobilizing a construc...

  • Answered by AI
  • Q3. How to cost control in project
  • Ans. 

    Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.

    • Create a detailed project budget and stick to it

    • Track expenses regularly and adjust budget as needed

    • Identify and eliminate unnecessary expenses

    • Negotiate with vendors for better pricing

    • Implement cost-saving measures without compromising quality

    • Use project management tools to monitor expenses and progress

    • Reg...

  • Answered by AI
  • Q4. Can you explain how to handle clinent
  • Ans. 

    Handling clients requires effective communication, understanding their needs, and providing timely solutions.

    • Listen actively to their concerns and requirements

    • Communicate clearly and professionally

    • Provide timely updates and solutions

    • Build a strong relationship based on trust and respect

    • Be proactive in identifying and addressing potential issues

    • Ensure customer satisfaction by going above and beyond expectations

  • Answered by AI
  • Q5. Flow chart for manpower mobilization
  • Ans. 

    Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.

    • Identify the need for manpower

    • Plan the recruitment process

    • Source and screen candidates

    • Conduct interviews and assessments

    • Select and hire candidates

    • Provide training and orientation

    • Deploy manpower to required locations

  • Answered by AI
  • Q6. Prepared organisation chat for project handling

Interview Preparation Tips

Interview preparation tips for other job seekers - Please see all questions

I applied via Naukri.com

Round 1 - One-on-one 

(1 Question)

  • Q1. Telephonic interview was conducted from Head office
Round 2 - Technical 

(1 Question)

  • Q1. On site interview was conducted.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be clear n confident. Knowledge of field instruments n process is must
Interview experience
2
Poor
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. Tell about urself

Toyo Engineering Interview FAQs

How many rounds are there in Toyo Engineering Construction Site Engineer interview?
Toyo Engineering interview process usually has 4 rounds. The most common rounds in the Toyo Engineering interview process are Resume Shortlist, Group Discussion and HR.

Tell us how to improve this page.

Toyo Engineering Construction Site Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 422 Interviews
Thermax Limited Interview Questions
4.1
 • 249 Interviews
AECOM Interview Questions
4.2
 • 114 Interviews
Apco Infratech Interview Questions
3.7
 • 112 Interviews
TechnipFMC Interview Questions
4.0
 • 70 Interviews
Bechtel Interview Questions
4.0
 • 69 Interviews
Samsung E&A Interview Questions
4.1
 • 60 Interviews
View all

Toyo Engineering Construction Site Engineer Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

5.0

Skill development

5.0

Work-life balance

5.0

Salary

5.0

Job security

5.0

Company culture

5.0

Promotions

5.0

Work satisfaction

Explore 1 Review and Rating
Senior Engineer
119 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Piping Engineer
112 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Assistant Engineer
97 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Project Engineer
79 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Engineer
75 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Toyo Engineering with

L&T Energy Hydrocarbon

3.8
Compare

Tata Projects

4.2
Compare

Thermax Limited

4.1
Compare

BGR Energy Systems

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview