Filter interviews by
I applied via Naukri.com and was interviewed in Apr 2021. There were 3 interview rounds.
Top trending discussions
posted on 30 Jan 2025
I was interviewed in Dec 2024.
The duration was 50 minutes and included 55 questions focused on technical areas related to mechanical, electrical, and hydraulic systems, as well as some questions on safety and reasoning.
I applied via Naukri.com and was interviewed in Nov 2024. There were 2 interview rounds.
They asked me about my current project and asked me to design a system similar to that
Casting solidification time is the duration it takes for molten metal to solidify in a casting process.
Casting solidification time depends on factors like material type, mold temperature, and casting geometry.
Higher pouring temperatures generally result in shorter solidification times.
Thicker sections of the casting will take longer to solidify compared to thinner sections.
Aluminum alloys typically have shorter solidif
Casting design considerations include material selection, part geometry, draft angles, surface finish, and shrinkage.
Material selection is crucial for the desired properties and performance of the final part.
Part geometry should be designed to minimize stress concentrations and ensure proper flow of molten metal.
Draft angles are necessary for easy removal of the part from the mold.
Surface finish requirements should be ...
CAD test-Housing model
I have 5 years of experience working as a Design Engineer in the automotive industry.
Designed components for new vehicle models
Collaborated with cross-functional teams to ensure design feasibility
Utilized CAD software to create detailed drawings
Performed testing and analysis to validate designs
Implemented cost-effective solutions to improve product performance
I have handled various projects in my previous organisation including designing new products, improving existing designs, and collaborating with cross-functional teams.
Designed new products from concept to production stage
Improved existing designs to enhance performance and reduce costs
Collaborated with cross-functional teams including manufacturing, marketing, and quality control
Managed project timelines and budgets e...
I applied via Recruitment Consulltant and was interviewed in Apr 2024. There was 1 interview round.
A free body diagram of a beam shows all external forces acting on the beam.
Identify all external forces acting on the beam such as gravity, applied loads, and reactions at supports.
Draw a simple sketch of the beam with arrows representing the direction and magnitude of each force.
Label each force with appropriate symbols or letters for clarity.
Ensure that the forces are correctly positioned and oriented relative to the
I applied via LinkedIn and was interviewed in May 2024. There was 1 interview round.
Yes, I am able to operate machines independently with experience in troubleshooting and maintenance.
I have experience operating various machines independently
I am skilled in troubleshooting and maintenance of machines
I can follow technical manuals and instructions accurately
I am familiar with safety protocols and procedures for operating machines
I applied via Referral and was interviewed in Nov 2023. There were 3 interview rounds.
My highest qualification is a Master's degree in Electrical Engineering.
Master's degree in Electrical Engineering
Specialized in power systems
Thesis focused on renewable energy integration
Completed advanced courses in control systems
Published research papers in IEEE conferences
As a Senior Engineer, my role in project quality is to ensure that all deliverables meet the required standards and specifications.
Developing and implementing quality assurance processes and procedures
Conducting regular audits and inspections to identify any quality issues
Collaborating with cross-functional teams to address and resolve quality concerns
Creating and maintaining quality documentation, including test plans...
posted on 16 Apr 2024
I applied via Referral and was interviewed before Apr 2023. There was 1 interview round.
Pumps, fans, gearboxes, compressors, motors, and generators are essential components in various mechanical systems.
Pumps are used to move fluids, such as water or oil, through a system.
Fans are used to create airflow for cooling or ventilation purposes.
Gearboxes are used to transmit power from one component to another at different speeds or torques.
Compressors are used to increase the pressure of a gas, such as in air ...
Data collection process involves gathering, recording, and storing information for analysis and decision-making.
Identify the data needed for analysis
Determine the method of data collection (surveys, interviews, observations, etc.)
Collect data using appropriate tools and techniques
Ensure data accuracy and reliability
Store data securely for future reference
Analyze collected data to draw conclusions and make decisions
Condition monitoring of tools involves regularly checking and analyzing the performance and health of tools to prevent breakdowns.
Regularly inspect tools for signs of wear and tear
Use sensors to monitor tool performance in real-time
Analyze data collected to predict potential failures
Implement preventive maintenance based on monitoring results
Interview experience
based on 9 reviews
Rating in categories
Senior Engineer
183
salaries
| ₹7.1 L/yr - ₹25 L/yr |
Lead Analyst
121
salaries
| ₹4.2 L/yr - ₹10.3 L/yr |
Senior Executive
120
salaries
| ₹3.3 L/yr - ₹8.2 L/yr |
Piping Designer
112
salaries
| ₹3.5 L/yr - ₹14 L/yr |
L2 Engineer
108
salaries
| ₹7 L/yr - ₹16.5 L/yr |
McDermott International
Saipem
Subsea 7
Baker Hughes