Filter interviews by
I applied via Approached by Company and was interviewed before Dec 2023. There were 2 interview rounds.
Basic questions in maths
I applied via Company Website and was interviewed in Mar 2021. There was 1 interview round.
I applied via Walk-in and was interviewed in Dec 2020. There were 3 interview rounds.
I applied via Referral and was interviewed before Jan 2021. There were 5 interview rounds.
Glass is a solid, transparent material made by heating a mixture of silica and other materials.
Glass is a non-crystalline, amorphous solid
It is made by heating a mixture of silica, soda ash, and lime
It can be molded into various shapes and sizes
It is used in windows, mirrors, lenses, and containers
Different types of glass include tempered, laminated, and stained glass
Graphene is a thin layer of pure carbon arranged in a hexagonal lattice.
It is the thinnest material known to man
It is a good conductor of electricity and heat
It is incredibly strong and flexible
It has potential applications in electronics, energy, and medicine
I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.
I appeared for an interview in Apr 2024.
I shifted to pursue new opportunities for growth and development in my career.
Seeking new challenges and responsibilities
Exploring different industries or technologies
Relocation for personal reasons or family commitments
posted on 23 Aug 2023
Response Surface Methodology (RSM) is a statistical technique used to model and analyze the relationship between a response variable and multiple input variables.
Design a set of experiments based on a factorial design
Collect data from the experiments
Fit a regression model to the data
Analyze the model to determine optimal input settings for the response variable
I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.
Minimum gap between two structures for seismic point of view is typically around 1.5 times the height of the taller structure.
Minimum gap is usually 1.5 times the height of the taller structure to reduce seismic interaction.
This gap helps prevent collision or structural damage during an earthquake.
Building codes and regulations may specify minimum gaps for seismic safety.
Example: If one building is 100 feet tall, the m...
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Senior Engineer
127
salaries
| ₹6.2 L/yr - ₹22 L/yr |
Process Engineer
125
salaries
| ₹3.8 L/yr - ₹14 L/yr |
Senior Principal Engineer
113
salaries
| ₹15 L/yr - ₹35 L/yr |
Piping Designer
105
salaries
| ₹3.7 L/yr - ₹12.8 L/yr |
Deputy Manager
95
salaries
| ₹7 L/yr - ₹23 L/yr |
L&T Construction
Shapoorji Pallonji Group
Saint-Gobain
AECOM