i
Techinterio
Filter interviews by
L U N D test h koi bhi nikal lega
I applied via Company Website and was interviewed in Oct 2023. There were 4 interview rounds.
Surveying of auto level involves using an instrument to measure height differences and establish level points on a construction site.
Auto level is a surveying instrument used to measure height differences and establish level points.
It works on the principle of a compensator that automatically levels the instrument.
The instrument is set up on a tripod and a staff is used to measure height differences.
The staff is marked...
Types of load for building include dead load, live load, wind load, and seismic load.
Dead load refers to the weight of the building itself and any permanent fixtures.
Live load is the weight of people, furniture, and other temporary loads.
Wind load is the force exerted by wind on the building.
Seismic load is the force exerted by earthquakes on the building.
Other types of loads may include snow load, rain load, and soil
Normal aptitude test
I applied via Company Website and was interviewed in Oct 2022. There were 3 interview rounds.
Techinterio interview questions for popular designations
I applied via Approached by Company
Top trending discussions
posted on 28 Nov 2024
Public Relations, Industrial and Employee Relations
AOP, Budgeting, Competency, People Planning and Skill Set, Leadership & Business Complianc...
posted on 13 Jan 2025
posted on 26 Sep 2024
Measurement of job product is crucial for ensuring quality and accuracy in the bending shop.
Accurate measurement ensures precise bending of materials
Use of tools such as calipers, rulers, and protractors for measurement
Regular calibration of measurement tools to maintain accuracy
I applied via Recruitment Consulltant and was interviewed in Jun 2024. There was 1 interview round.
Safety is the state of being protected from harm, danger, or injury.
Safety involves identifying and minimizing risks in the workplace or environment.
It includes following safety protocols and procedures to prevent accidents.
Safety also involves providing proper training and equipment to ensure protection.
Examples: wearing personal protective equipment, following fire safety protocols, conducting safety inspections.
Risk assessment is the process of identifying, analyzing, and evaluating potential risks in order to determine the best course of action to minimize or eliminate them.
Identifying potential hazards and risks in the workplace or environment
Analyzing the likelihood and severity of each risk
Evaluating the level of risk and determining appropriate control measures
Implementing control measures to reduce or eliminate the iden...
Supply Chain Management (SCM) involves the coordination and management of all activities involved in sourcing, procurement, production, and logistics.
Involves planning, implementing, and controlling the flow of goods and services from point of origin to point of consumption
Includes activities such as sourcing raw materials, manufacturing products, and distributing finished goods
Focuses on optimizing processes to minimi...
A mock drill is a simulated emergency exercise conducted to test the preparedness and response of individuals and organizations.
Mock drills are conducted to practice emergency procedures without the actual risk or consequences.
They help identify strengths and weaknesses in emergency response plans.
Mock drills can involve scenarios like fire drills, earthquake drills, active shooter drills, etc.
Participants are expected...
An emergency plan is a set of procedures and guidelines to follow in case of a crisis or disaster.
Emergency plans outline specific actions to take during emergencies
They include evacuation procedures, communication protocols, and emergency contacts
Emergency plans are tailored to specific types of emergencies, such as fires, natural disasters, or medical emergencies
based on 51 reviews
Rating in categories
BIM Modeller
26
salaries
| ₹2.2 L/yr - ₹5 L/yr |
Junior Engineer
15
salaries
| ₹2.2 L/yr - ₹3.2 L/yr |
BIM Architect
13
salaries
| ₹2 L/yr - ₹8.5 L/yr |
Estimation Engineer
7
salaries
| ₹2 L/yr - ₹3 L/yr |
Junior BIM Engineer
6
salaries
| ₹2.4 L/yr - ₹3.5 L/yr |
Urban Ladder
Pepperfry
LivSpace
HomeLane