i
TDK India Private Limited
Filter interviews by
I applied via Walk-in and was interviewed in Sep 2024. There was 1 interview round.
LOB stands for Line of Business, referring to a specific product or service within a company.
LOB helps to categorize different business activities within an organization.
It can also refer to a specific department or division that focuses on a particular product or service.
For example, a company may have a separate LOB for their software products and another for their hardware products.
Capacity sheet is a document used to track and manage the capacity of resources in a production facility.
Identify all resources involved in the production process
Determine the capacity of each resource in terms of units or time
Create a spreadsheet with columns for each resource and rows for time periods
Input the capacity of each resource for each time period
Update the sheet regularly to reflect changes in capacity or p
I applied via Referral and was interviewed in Nov 2024. There was 1 interview round.
I applied via Approached by Company and was interviewed in Jul 2024. There were 2 interview rounds.
They asked about my work experience, technical expertise and problem solving abilities.
Implemented MES system for a manufacturing company, resulting in 20% increase in production efficiency.
Successfully led the implementation of MES system for a manufacturing company
Achieved a 20% increase in production efficiency through the implementation
Trained and supported end-users in utilizing the MES system effectively
TPM stands for Total Productive Maintenance, a type of maintenance strategy focused on maximizing the efficiency and effectiveness of equipment.
TPM involves proactive maintenance to prevent breakdowns and improve overall equipment effectiveness
It emphasizes employee involvement and ownership of equipment maintenance
TPM aims to eliminate the 6 big losses: breakdowns, setup and adjustment time, idling and minor stoppages...
TDK India Private Limited interview questions for popular designations
I applied via Recruitment Consulltant and was interviewed in Dec 2023. There were 3 interview rounds.
MCQ type exam to qualify for the technical interview.
A capacitor is an electronic component that stores and releases electrical energy.
A capacitor consists of two conductive plates separated by an insulating material called dielectric.
It stores electrical energy in an electric field between the plates.
Capacitors are commonly used in electronic circuits for energy storage, filtering, timing, and coupling.
They can be found in various devices such as power supplies, amplifi...
Power factor is a measure of how effectively electrical power is being used in a circuit.
Power factor is the ratio of real power (kW) to apparent power (kVA) in an AC circuit.
It indicates the efficiency of power usage and the presence of reactive power.
A power factor of 1 indicates all power is being used effectively, while a power factor less than 1 indicates inefficiency.
Inductive loads (e.g., motors) have lagging po...
The motor starter is a device that starts and stops the motor by controlling the flow of electrical power.
The motor starter consists of a contactor, overload relay, and control circuit.
When the start button is pressed, the control circuit energizes the coil of the contactor, closing its contacts and allowing current to flow to the motor.
The overload relay protects the motor from excessive current by sensing the current...
Capacitor start and run motors are types of motors commonly used in various applications.
Capacitor start motors use a capacitor to provide high starting torque and are commonly used in appliances like air conditioners and refrigerators.
Capacitor run motors use a capacitor to improve the motor's efficiency and power factor, and are often found in fans, pumps, and compressors.
Both types of motors have advantages and disa...
Capacitors are electronic components that store and release electrical energy. They come in various types and have different functions.
Electrolytic capacitors are commonly used in power supply circuits to smooth out voltage fluctuations.
Ceramic capacitors are used for high-frequency applications and noise suppression.
Film capacitors are suitable for applications requiring high voltage and high current handling.
Tantalum...
Dielectric is a material that does not conduct electricity but can store and transmit electric charge.
Dielectric materials have high electrical resistance.
They are used in capacitors to store and release electrical energy.
Examples of dielectric materials include glass, rubber, and plastic.
Dielectric strength is a measure of a material's ability to withstand electrical stress without breaking down.
Dielectric constant is...
Get interview-ready with Top TDK India Private Limited Interview Questions
I applied via Campus Placement and was interviewed in Dec 2023. There were 6 interview rounds.
Just bodmas questions of maths
And just hindi to english translation of some words
About my hobbies and what would I like to
They are detailed focus on my resume and the assignment test
They are asking about what I feel about job and a workplace my thoughts about a job
mAh stands for milliampere-hour, a unit of electrical charge commonly used to measure the capacity of a battery.
mAh is a unit of electrical charge used to measure the capacity of a battery
It is commonly used in specifications of portable electronic devices like smartphones, tablets, and power banks
Higher mAh rating indicates longer battery life
The electronic equipment and subject names in 2nd semester books are related to technology and engineering.
Electronic equipment: examples include oscilloscope, multimeter, soldering iron
Subject names: examples include digital electronics, circuit analysis, microprocessors
I applied via Naukri.com and was interviewed in Aug 2023. There were 4 interview rounds.
Kaizen is a Japanese term for continuous improvement, while suggestion refers to ideas or proposals for improvement.
Kaizen focuses on making small, incremental improvements in processes or systems
Suggestion involves offering ideas or proposals for improvement to enhance efficiency or quality
Kaizen and suggestion are key components of continuous improvement initiatives in organizations
Examples of kaizen include implemen...
OEE (Overall Equipment Effectiveness) is a measure of how well a manufacturing process is performing.
OEE is calculated by multiplying Availability, Performance, and Quality percentages.
Availability is the ratio of actual production time to planned production time.
Performance is the ratio of actual production speed to ideal production speed.
Quality is the ratio of good units produced to total units produced.
OEE provides...
PPLH improvement refers to the process of improving productivity, profitability, lead time, and quality in a manufacturing setting.
PPLH stands for Productivity, Profitability, Lead Time, and Quality in a manufacturing process.
Improving PPLH involves optimizing production processes, reducing waste, enhancing efficiency, and ensuring high product quality.
Examples of PPLH improvement strategies include implementing lean m...
5S is a methodology for organizing a workplace for efficiency and effectiveness. Shop floor refers to the area where production or manufacturing takes place.
5S stands for Sort, Set in Order, Shine, Standardize, and Sustain.
It involves organizing the workplace to eliminate waste, improve efficiency, and ensure safety.
Examples include labeling tools and equipment, creating designated storage areas, and implementing regul...
TPM stands for Total Productive Maintenance and TQM stands for Total Quality Management.
TPM focuses on maximizing the efficiency of equipment and machinery to prevent breakdowns and defects.
TQM focuses on improving the quality of products and processes through continuous improvement and customer satisfaction.
Both TPM and TQM aim to optimize production processes and reduce waste.
Examples of TPM activities include regula...
Rejection analysis involves identifying and addressing the root causes of rejected products or processes.
Identify the specific reasons for rejection, such as defects in materials, design flaws, or manufacturing errors
Collect data and analyze trends to determine common issues leading to rejection
Implement corrective actions to address the root causes and prevent future rejections
Monitor the effectiveness of the correcti...
I applied via Company Website and was interviewed in Nov 2023. There were 4 interview rounds.
I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.
I applied via LinkedIn and was interviewed in Jul 2023. There were 3 interview rounds.
Top trending discussions
Interview experience
based on 570 reviews
Rating in categories
Assistant Engineer
70
salaries
| ₹2.7 L/yr - ₹5.7 L/yr |
Engineer
63
salaries
| ₹2.3 L/yr - ₹7.5 L/yr |
Senior Engineer
55
salaries
| ₹4.8 L/yr - ₹13 L/yr |
Production Engineer
44
salaries
| ₹2 L/yr - ₹8.1 L/yr |
Deputy Manager
43
salaries
| ₹7 L/yr - ₹20 L/yr |
Samsung
Panasonic Avionics Corporation
Sony
LG Electronics