I applied via campus placement at Indian Institute of Technology (IIT), Chennai
I applied via Approached by Company and was interviewed in Jun 2024. There were 2 interview rounds.
posted on 21 Jun 2024
I applied via Walk-in and was interviewed in May 2024. There were 2 interview rounds.
Maths question, and reasoning
The first law of thermodynamics states that energy cannot be created or destroyed, only transferred or converted.
Energy is conserved in a closed system
Energy can be transferred between different forms (e.g. heat, work)
The total energy of a system remains constant
Mathematically expressed as: ΔU = Q - W, where ΔU is the change in internal energy, Q is heat added to the system, and W is work done by the system
The second law of thermodynamics states that the total entropy of an isolated system can never decrease over time.
Entropy tends to increase in a closed system
Heat energy naturally flows from hot to cold objects
Efficiency of energy conversion processes is limited by the second law
posted on 22 Jun 2024
posted on 24 Jan 2025
I was interviewed before Jan 2024.
I was interviewed in Jul 2023.
Fe-C diagram shows phases of iron-carbon system at different temperatures and compositions.
Fe-C diagram is a graphical representation of the phases of iron-carbon system.
It shows the phases present at different temperatures and compositions.
Examples of phases include austenite, ferrite, cementite, and pearlite.
posted on 2 May 2023
I applied via Naukri.com and was interviewed before May 2022. There were 3 interview rounds.
I applied via Approached by Company and was interviewed before Dec 2021. There were 2 interview rounds.
The erection sequence of a continuous casting plant involves several steps. There are two types of casters: vertical and horizontal.
The first step is to install the foundation and anchor bolts.
Next, the columns and beams are erected.
After that, the equipment such as tundish, mold, and rollers are installed.
Finally, the electrical and hydraulic systems are connected.
There are two types of casters: vertical and horizonta...
The casting shop requires utilities such as electricity, compressed air, natural gas, and water of specific quality and type.
Electricity is required for powering the equipment and lighting.
Compressed air is used for cleaning and operating pneumatic tools.
Natural gas is used for heating the furnaces.
Water of specific quality and type is required for cooling and cleaning purposes.
Water quality should be free from impurit...
Project management is the practice of planning, organizing, and executing projects to achieve specific goals within a defined timeframe.
Project management involves defining project objectives, creating a project plan, and allocating resources.
It includes coordinating and communicating with team members, stakeholders, and clients.
Project managers monitor progress, manage risks, and make adjustments to ensure successful ...
Clashing refers to conflicts or clashes between different elements or parties.
Clashing occurs when there is a disagreement or collision between two or more entities.
It can happen in various contexts such as project management, team dynamics, or resource allocation.
Examples of clashing include conflicting priorities, incompatible schedules, or disagreements on project scope.
Clashing can lead to delays, inefficiencies, o...
Recording delays involves documenting the cause, duration, and impact of the delay.
Identify the cause of the delay, such as equipment failure or resource unavailability.
Record the duration of the delay, including start and end times.
Document the impact of the delay on the project timeline, budget, and resources.
Use a standardized format or template to ensure consistency in recording delays.
Include any relevant supporti...
To claim, provide necessary documentation and evidence to support the claim.
Gather all relevant documentation and evidence to support the claim
Prepare a written claim statement explaining the basis of the claim
Submit the claim along with supporting documents to the appropriate authority
Follow up on the claim to ensure it is being processed
Provide any additional information or clarification if requested
The daily log contains a record of activities, progress, issues, and decisions made during a project.
Activities performed by the project team
Progress made on project tasks
Issues encountered and their resolutions
Decisions made during project meetings
Changes to project scope or requirements
Communication with stakeholders
Risks identified and mitigation strategies
Resource allocation and utilization
Budget updates
Milestones
Manager
1.6k
salaries
| ₹6 L/yr - ₹20.5 L/yr |
Assistant Manager
1.4k
salaries
| ₹5.2 L/yr - ₹15.5 L/yr |
Senior Manager
1.2k
salaries
| ₹9.4 L/yr - ₹35 L/yr |
Junior Engineer
900
salaries
| ₹2 L/yr - ₹10 L/yr |
Associate Engineer
874
salaries
| ₹2 L/yr - ₹7.8 L/yr |
JSW Steel
Steel Authority Of India
Vedanta Limited
ArcelorMittal Nippon Steel