Filter interviews by
Clear (1)
I applied via Recruitment Consulltant and was interviewed before Sep 2020. There were 3 interview rounds.
Physical and chemical quality of raw materials and sinter product is crucial for ensuring product quality and performance.
Raw materials should meet specified physical and chemical requirements to ensure desired sinter product properties.
Regular testing and analysis of raw materials and sinter product is necessary to maintain quality standards.
Factors such as particle size, composition, moisture content, and impurities ...
I applied via Referral and was interviewed before Jan 2019. There were 6 interview rounds.
Top trending discussions
I applied via Approached by Company and was interviewed before May 2021. There were 3 interview rounds.
I was interviewed before Jan 2021.
Diploma
I applied via Recruitment Consulltant and was interviewed in Nov 2023. There was 1 interview round.
I applied via Company Website and was interviewed before May 2023. There was 1 interview round.
I applied via Walk-in and was interviewed in Nov 2024. There was 1 interview round.
posted on 18 May 2020
I applied via Naukri.com and was interviewed in Nov 2019. There were 3 interview rounds.
Control valve calibration involves adjusting the valve to ensure it operates within specified parameters.
Determine the valve's operating range and desired set points
Use a calibration bench or in-line calibration equipment to adjust the valve's position and response time
Verify the valve's performance using a flow meter or pressure gauge
Document the calibration process and results for future reference
based on 38 reviews
Rating in categories
Assistant Manager
226
salaries
| ₹0 L/yr - ₹0 L/yr |
Associate Manager
134
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
132
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
81
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineer
60
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata Steel
JSW Steel
Steel Authority Of India
Jindal Steel and Power