i
Tata Projects
Filter interviews by
I applied via Naukri.com and was interviewed before Feb 2022. There were 3 interview rounds.
Yes, I am interested in working at Tata Projects.
Tata Projects is a reputable company known for its quality projects.
Working at Tata Projects would provide me with valuable experience in the field of quality engineering.
I am impressed by Tata Projects' commitment to excellence and their focus on delivering high-quality projects.
I believe that working at Tata Projects would offer me opportunities for professional growth...
I am interested in Tata Projects because of their reputation for quality and innovation in the engineering industry.
Tata Projects has a strong reputation for delivering high-quality projects.
They are known for their innovative approach to engineering and construction.
The company has a diverse portfolio of projects across various sectors.
Tata Projects offers excellent career growth opportunities and a supportive work en...
Physical & Chemical tests of Steel Reinforcement include tensile strength, elongation, chemical composition, and corrosion resistance.
Tensile strength test measures the maximum stress a material can withstand before breaking
Elongation test measures the ability of the material to stretch before breaking
Chemical composition test determines the percentage of elements present in the steel reinforcement
Corrosion resistance ...
Cement and concrete tests are used to ensure the quality and strength of the materials used in construction.
Tests for cement include fineness, setting time, compressive strength, and soundness.
Tests for concrete include slump, compressive strength, air content, and density.
These tests are important to ensure that the materials meet the required standards and specifications for construction projects.
Results from these t...
Pre & post pour checks are essential to ensure the quality of concrete.
Pre-pour checks include inspection of formwork, reinforcement, and concrete mix design.
Post-pour checks include slump test, air content test, and temperature monitoring.
Other checks include curing, finishing, and testing for compressive strength.
These checks help ensure that the concrete is of the desired quality and meets the project specifications
Aggregate test is a method to determine the strength of coarse aggregates. Results criteria depend on the type of aggregate.
Aggregate tests include crushing value test, impact value test, and abrasion value test.
The results criteria for each test vary depending on the type of aggregate being tested.
For example, the crushing value test result criteria for basalt aggregate is 25%, while for limestone aggregate it is 30%.
...
The passing criteria of concrete cubes is based on the compressive strength achieved by the cubes after a certain period of time.
The cubes are usually tested after 7 and 28 days of curing
The passing criteria varies depending on the grade of concrete used
For example, for M20 grade concrete, the passing criteria is 20 N/mm² after 28 days of curing
The cubes are tested using a compression testing machine
Concrete cover is the thickness of concrete between the surface of embedded reinforcement and the outer surface of the concrete.
It is required to protect the reinforcement from corrosion and fire damage.
The thickness of the concrete cover depends on the type of structure and the environmental conditions.
The minimum concrete cover is specified in the design codes and standards.
For example, in reinforced concrete columns...
NCR stands for Non-Conformance Report. It is a document used to record and track quality issues in a product or process.
NCR is used to document any deviation from the required specifications or standards.
It includes details such as the nature of the non-conformance, its location, and the corrective action taken.
The closing process involves verifying that the corrective action has been effective and the non-conformance ...
posted on 24 Jan 2025
Scaffolding codes are standards set by regulatory bodies to ensure safe construction practices.
Scaffolding codes vary by country and region, but generally include guidelines on materials, design, erection, use, and dismantling of scaffolds.
Common standards include OSHA regulations in the United States, BS EN 12811 in Europe, and AS/NZS 1576 in Australia.
Inspectors must ensure that scaffolding meets these codes to preve
Different types of scaffolding erection include supported scaffolding, suspended scaffolding, mobile scaffolding, and aerial lifts.
Supported scaffolding is the most common type and is supported by the ground.
Suspended scaffolding is hung from the top of a building or structure.
Mobile scaffolding is on wheels and can be easily moved around a worksite.
Aerial lifts are platforms that can be raised and lowered for access t
Safety purchase materials should be durable, high quality, and compliant with safety regulations.
Choose materials that are durable and can withstand heavy loads
Select high quality materials to ensure safety of workers
Ensure that the materials meet safety regulations and standards
Examples of safety purchase materials include high-strength steel, aluminum, and quality wood
Safe erection of scaffolding involves proper planning, training, supervision, and adherence to safety regulations.
Ensure all workers are properly trained in scaffolding erection and safety procedures.
Inspect all components of the scaffolding before erection to ensure they are in good condition.
Plan the erection process carefully, considering factors such as weight capacity, stability, and proximity to power lines.
Use p...
Identifying risks and hazards is crucial for ensuring safety in scaffolding work.
Inspecting scaffolding for stability and structural integrity
Identifying potential fall hazards such as unsecured planks or missing guardrails
Checking for electrical hazards near scaffolding
Assessing weather conditions that could impact scaffolding safety
Ensuring proper training and supervision of workers to prevent accidents
I was interviewed in Feb 2025.
Company Notice period
The size of a cube is determined by the length of its sides, measured in millimeters.
A cube has equal sides; if one side is 10mm, all sides are 10mm.
Volume can be calculated as side^3; for a 10mm cube, volume = 1000mm³.
Common sizes include 5mm, 10mm, 20mm, etc., depending on the application.
M20 concrete typically achieves about 70% of its strength in 7 days, approximately 15-17 kN/mm².
M20 grade concrete has a characteristic compressive strength of 20 MPa (20 N/mm²) at 28 days.
After 7 days, M20 concrete generally reaches about 65-70% of its 28-day strength.
This means the nominal strength after 7 days is approximately 13-14 N/mm², or 13-14 kN/mm².
Factors like curing conditions and temperature can affect the
NP2 and NP3 pipes differ in their pressure ratings and applications in construction and plumbing.
NP2 pipes have a lower pressure rating compared to NP3 pipes, making them suitable for less demanding applications.
NP3 pipes are designed for higher pressure applications, often used in water supply and drainage systems.
For example, NP2 pipes might be used for irrigation, while NP3 pipes are used in municipal water supply.
T...
To check anodized aluminum depth, use methods like thickness gauges or chemical tests for accurate measurement.
Use a micrometer or caliper to measure the thickness of the anodized layer directly.
Employ a portable anodizing thickness gauge, which uses eddy current or ultrasonic methods.
Conduct a chemical test using a specific anodizing depth measurement solution that reacts with the anodized layer.
Perform a scratch test...
A toilet bathroom pipeline should have a slope of 1/4 inch per foot for effective drainage.
A slope of 1/4 inch per foot is standard for toilet drain lines.
This slope ensures proper flow and prevents clogs.
For example, a 10-foot pipe should drop 2.5 inches from the toilet to the sewer line.
Too steep a slope can cause waste to flow too quickly, leading to blockages.
Tata Projects interview questions for popular designations
I was interviewed in Jan 2025.
Get interview-ready with Top Tata Projects Interview Questions
I was interviewed in Mar 2024.
I have 8 years of experience in the hospitality industry, including 4 years as a General Manager.
8 years of experience in the hospitality industry
4 years as a General Manager
Strong leadership and team management skills
Proven track record of increasing revenue and customer satisfaction
Experience in budgeting, forecasting, and strategic planning
I chose this company because of its strong reputation in the industry and its commitment to employee development.
Strong reputation in the industry
Commitment to employee development
Opportunities for growth and advancement
Positive company culture
I am looking for a competitive salary that reflects my experience and skills.
Research industry standards for Assistant General Manager salaries
Consider your level of experience and qualifications
Be prepared to negotiate based on the job responsibilities and benefits package
I was interviewed in Feb 2025.
I applied via Walk-in and was interviewed in Dec 2024. There were 2 interview rounds.
The load capacity of scaffolding varies depending on the type and materials used.
Load capacity is determined by factors such as the type of scaffolding (e.g. tube and coupler, frame, system), materials used (e.g. steel, aluminum), and design specifications.
It is important to consult the manufacturer's guidelines and engineering calculations to determine the specific load capacity of a particular scaffolding system.
For ...
Hanging scaffolding is erected by attaching the scaffold to a building or structure using suspension ropes or chains.
Inspect the building or structure to ensure it can support the weight of the scaffold
Attach suspension ropes or chains securely to the building or structure
Lower the scaffold platform into position using a hoist system
Secure the platform in place to prevent swinging or movement
Ensure all safety measures ...
Scaffolding material inspection.
Top trending discussions
The duration of Tata Projects interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 547 interviews
Interview experience
based on 5.3k reviews
Rating in categories
Deputy Manager
1.2k
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
719
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
407
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
387
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Manager
366
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Reliance Infrastructure
GMR Group
Hindustan Construction Company