Filter interviews by
I applied via Naukri.com and was interviewed in Nov 2023. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Dec 2023. There were 2 interview rounds.
Drafting of 3D model involves creating detailed technical drawings from a 3D digital model.
Start by creating a 3D digital model using software like AutoCAD or SolidWorks.
Generate orthographic views (top, front, side) and isometric views of the model.
Include dimensions, annotations, and other technical details in the drawings.
Ensure accuracy and clarity in the drafting to communicate design intent effectively.
Review and...
Tata Hitachi Construction Machinery interview questions for popular designations
Get interview-ready with Top Tata Hitachi Construction Machinery Interview Questions
I applied via Recruitment Consulltant and was interviewed in Feb 2023. There were 4 interview rounds.
Maintenance is the process of ensuring that equipment, machinery, or facilities are in good working condition.
Regular inspection and repair of equipment
Preventive maintenance to avoid breakdowns
Corrective maintenance to fix issues
Predictive maintenance to anticipate problems
Maintenance scheduling and record-keeping
Training and development of maintenance staff
Continuous improvement of maintenance processes
Examples: oil ...
Maintenance has several benefits including increased equipment lifespan, improved safety, reduced downtime, and cost savings.
Increased equipment lifespan: Regular maintenance helps identify and address issues before they become major problems, extending the lifespan of equipment.
Improved safety: Maintenance ensures that equipment is functioning properly, reducing the risk of accidents and injuries.
Reduced downtime: Reg...
An aptitude test is an exam used to determine an individual's skill or propensity to succeed in a given activity.
Benefits of maintenance of electrical instrument
Current can be measured using an ammeter, which measures the flow of electric charge in a circuit.
Use an ammeter to measure current
Connect the ammeter in series with the circuit
Ensure the ammeter is set to the appropriate range for the expected current
Read the current value displayed on the ammeter
Example: To measure the current flowing through a light bulb, connect the ammeter in series with the bulb and read the disp
When encountering technical issues, it is important to follow a systematic approach to identify, troubleshoot, and resolve the problem.
Start by gathering information about the issue, such as error messages, symptoms, and any recent changes or events that may have triggered the problem.
Analyze the available data to narrow down the possible causes of the issue.
Use diagnostic tools and techniques to further investigate an...
MCB stands for Miniature Circuit Breaker. It is an electrical switch designed to protect an electrical circuit from damage caused by overload or short circuit.
MCB is a type of circuit breaker that automatically switches off the electrical circuit when it detects an overload or short circuit.
It is commonly used in residential and commercial buildings to protect electrical appliances and wiring from damage.
MCBs are more ...
The step-by-step procedure if boom life is not working
Check the power supply to the boom lift
Inspect the control panel for any error codes or indicators
Ensure all safety switches are engaged properly
Inspect the hydraulic system for any leaks or malfunctions
Check the boom lift's batteries and charging system
Verify if the emergency stop button is engaged or if any other safety features are activated
Consult the boom lift'...
To check boom hoist, inspect the wire rope, drum, brake, and hydraulic system.
Inspect the wire rope for any signs of wear or damage.
Check the drum for any cracks or deformities.
Test the brake to ensure it is functioning properly.
Inspect the hydraulic system for any leaks or malfunctions.
Perform load testing to ensure the boom hoist can handle the required weight.
Check the boom hoist control system for any faults or err
There are several types of cranes used in various industries for lifting and moving heavy objects.
Mobile cranes: These are versatile cranes mounted on wheels or tracks and can be easily transported to different locations.
Tower cranes: These are tall cranes often used in construction sites to lift heavy materials to great heights.
Overhead cranes: These cranes are typically used in factories or warehouses to move heavy l...
I applied via Referral and was interviewed in Apr 2023. There were 2 interview rounds.
I worked as a software engineer in my previous company.
Developed and maintained software applications
Collaborated with cross-functional teams to ensure project success
Participated in code reviews and testing
Implemented new features and enhancements
Resolved technical issues and bugs
I am a highly motivated individual with a passion for learning and a strong work ethic.
I have a Bachelor's degree in Computer Science and have completed several online courses in web development.
I have experience working as a freelance web developer and have completed projects for clients in various industries.
I am proficient in HTML, CSS, JavaScript, and have experience with frameworks such as React and Angular.
I am a...
I applied via Naukri.com and was interviewed in Oct 2023. There was 1 interview round.
Process and mechanical engineering drawing, safety, tpm, 5s, 6sigma, 7qc tools, manpower handling, shop floor all activities, audits, SAP, planning
Top trending discussions
The duration of Tata Hitachi Construction Machinery interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 58 interviews
Interview experience
based on 669 reviews
Rating in categories
Service Engineer
139
salaries
| ₹1 L/yr - ₹6.9 L/yr |
Assistant Manager
120
salaries
| ₹6 L/yr - ₹14.5 L/yr |
Manager
104
salaries
| ₹7 L/yr - ₹16.5 L/yr |
Senior Manager
104
salaries
| ₹10 L/yr - ₹23.1 L/yr |
Assistant Divisional Manager
82
salaries
| ₹14.5 L/yr - ₹25.5 L/yr |
JCB
Komatsu
Caterpillar Inc
Volvo Construction Equipment