i
Tata AutoComp Systems
Filter interviews by
Top trending discussions
I applied via Naukri.com and was interviewed in Mar 2022. There were 2 interview rounds.
I applied via Walk-in and was interviewed before Jan 2022. There were 2 interview rounds.
Improving productivity can be achieved through efficient time management, clear communication, and continuous learning.
Set clear goals and prioritize tasks
Eliminate distractions and delegate tasks when possible
Use technology and automation to streamline processes
Encourage open communication and collaboration within the team
Invest in employee training and development
Regularly evaluate and adjust strategies for improveme
SMED stands for Single Minute Exchange of Die. It is a lean manufacturing technique used to reduce setup time.
SMED helps in reducing the time taken to changeover from one production process to another
It involves breaking down the setup process into smaller steps and converting internal setup to external setup
Benefits of SMED include increased productivity, reduced inventory, improved quality, and increased flexibility
E...
I applied via Naukri.com and was interviewed in Jun 2022. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before Sep 2020. There were 3 interview rounds.
Line balance refers to the equal distribution of work among different stations in a production line.
Line balance ensures that each station in a production line has a similar workload.
It helps in optimizing the efficiency and productivity of the production process.
Line balancing techniques involve analyzing the tasks, cycle times, and capacities of each station to achieve optimal balance.
An example of line balance is wh...
Lead time is the time it takes to complete a process from start to finish.
Lead time includes all the steps involved in a process, from planning to delivery.
It is an important metric for businesses to measure and improve efficiency.
Lead time can vary depending on the complexity of the process and the resources available.
For example, the lead time for manufacturing a car can be several months, while the lead time for del
Torque is decided based on the required force and the distance from the axis of rotation.
Determine the required force for the task
Calculate the distance from the axis of rotation
Use the formula T = F x d to calculate torque
Consider any external factors that may affect torque requirements
Choose a motor or engine with sufficient torque output
Working with unions requires clear communication, respect, and a willingness to negotiate.
Establish open lines of communication with union representatives
Respect the collective bargaining agreement and union rules
Negotiate in good faith to find mutually beneficial solutions
Be prepared to compromise and find creative solutions
Stay informed about labor laws and regulations
Address any grievances or disputes promptly and f
Improving shopfloor requires optimizing processes, training employees, and utilizing technology.
Analyze current processes and identify areas for improvement
Invest in employee training and development
Implement technology such as automation and data analytics
Regularly review and adjust processes to ensure efficiency
Encourage employee feedback and suggestions
Maintain a clean and organized workspace
5S is a workplace organization method that uses a set of principles to create and maintain an organized, clean, and efficient work environment.
Sort - separate necessary items from unnecessary ones
Set in order - arrange necessary items in a logical manner
Shine - clean the work area and equipment
Standardize - establish procedures for maintaining the first three S's
Sustain - ensure that the first four S's are followed con...
I applied via LinkedIn and was interviewed in Sep 2021. There were 3 interview rounds.
I have 5 years of experience working as a mechanical engineer in the automotive industry.
Designed and implemented new components for vehicle engines
Performed stress analysis and simulations to ensure product durability
Collaborated with cross-functional teams to troubleshoot and resolve technical issues
Managed projects from concept to production, meeting strict deadlines
I have worked on various projects including designing a new software system for a manufacturing company and implementing a renewable energy solution for a residential building.
Designed a new software system for a manufacturing company to streamline production processes
Implemented a renewable energy solution for a residential building to reduce energy costs and environmental impact
Collaborated with a team of engineers t...
I applied via Job Portal and was interviewed in Aug 2021. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Nov 2021. There were 3 interview rounds.
based on 1 interview
Interview experience
based on 7 reviews
Rating in categories
Assistant Manager
400
salaries
| ₹4.3 L/yr - ₹13.9 L/yr |
Senior Engineer
192
salaries
| ₹3.5 L/yr - ₹10.5 L/yr |
Senior Design Engineer
179
salaries
| ₹3.7 L/yr - ₹13.5 L/yr |
Deputy Manager
153
salaries
| ₹6 L/yr - ₹20.2 L/yr |
Design Engineer
139
salaries
| ₹2 L/yr - ₹8 L/yr |
Ceat Tyres
UNO Minda
Apollo Tyres
Exide Industries