Synergy Systems & Solutions Project Engineer Interview Questions and Answers

Updated 30 Apr 2024

Synergy Systems & Solutions Project Engineer Interview Experiences

1 interview found

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-

I applied via Campus Placement

Round 1 - Technical 

(1 Question)

  • Q1. Automation protocols used commonly ?
  • Ans. 

    Commonly used automation protocols include Modbus, Profibus, Ethernet/IP, and DeviceNet.

    • Modbus is a serial communication protocol commonly used in industrial automation.

    • Profibus is a fieldbus communication protocol used in process automation.

    • Ethernet/IP is a protocol used for industrial automation networking.

    • DeviceNet is a communication protocol used in factory automation for connecting industrial devices.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Automation protocols, SCADA basics, programming in any language

Skills evaluated in this interview

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Difference between open loop and closed loop?
  • Ans. 

    Open loop does not have feedback mechanism, while closed loop does.

    • Open loop system does not have a feedback mechanism to adjust the output based on the input.

    • Closed loop system uses feedback from the output to control the input and maintain desired output.

    • Open loop systems are simpler and less accurate, while closed loop systems are more complex but more accurate.

    • Example: A toaster is an open loop system as it does no...

  • Answered by AI
  • Q2. What is equation of PID controller
  • Ans. 

    The equation of a PID controller is a control loop feedback mechanism used in industrial control systems.

    • The equation for a PID controller is: u(t) = Kp*e(t) + Ki*∫e(t)dt + Kd*de(t)/dt

    • Kp, Ki, and Kd are the proportional, integral, and derivative gains respectively

    • The proportional term Kp reacts to the current error value

    • The integral term Ki reacts to the accumulation of past errors

    • The derivative term Kd reacts to the r

  • Answered by AI
  • Q3. Name any two pressure sensors
  • Ans. 

    Two common pressure sensors are piezoresistive sensors and capacitive sensors.

    • Piezoresistive sensors: measure pressure by changes in electrical resistance

    • Capacitive sensors: measure pressure by changes in capacitance

  • Answered by AI
  • Q4. Difference between open loop and closed loop
  • Ans. 

    Open loop does not have feedback mechanism, while closed loop does.

    • Open loop system does not have a feedback mechanism to adjust the output based on the input.

    • Closed loop system uses feedback from the output to adjust the input and maintain desired output.

    • Examples of open loop systems include a toaster or a washing machine with a timer setting.

    • Examples of closed loop systems include a thermostat controlling room temper

  • Answered by AI
Round 1 - HR 

(2 Questions)

  • Q1. Nil..................
  • Q2. Nil.................
Round 2 - Technical 

(1 Question)

  • Q1. Nil...................
Round 3 - Behavioral 

(2 Questions)

  • Q1. Nil...................
  • Q2. Nil.........?..........

Interview Preparation Tips

Interview preparation tips for other job seekers - Hello connections,
Kindly consider Toshniwal the last option in your short list criteria as such it has a lots of frustrating environment
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(4 Questions)

  • Q1. Previous And Current Salary Related Question
  • Q2. Current Designation in the company
  • Q3. Notice period for the company
  • Q4. Work and Documentation related question
Round 3 - Technical 

(6 Questions)

  • Q1. Job Resposibilities related question
  • Q2. Projects done related questions
  • Q3. Technical backgroud related question
  • Ans. Plc, scada, hmi, vfd, sensors, wiring related topics
  • Answered Anonymously
  • Q4. Whatever I have done in my current company related questions
  • Q5. Some Technical questions related to automation and maintenance.
  • Q6. How much salary I am expecting for current position

Interview Preparation Tips

Interview preparation tips for other job seekers - Work Experience Related Questions and Questions asked from your Education Background.

I applied via Company Website and was interviewed in Jun 2022. There were 2 interview rounds.

Round 1 - Aptitude Test 

Written exam and maths and including basic english quetion

Round 2 - Technical 

(3 Questions)

  • Q1. My subject related ......technical part completed
  • Q2. What about yourself ? Why shoud i hire you ? What your strengh and weekness ?
  • Q3. What your sallary exaptantion Why join you this company?

Interview Preparation Tips

Topics to prepare for Toshniwal Industries Project Manager interview:
  • Electrical Power System
  • Electical machine
Interview preparation tips for other job seekers - My advice for this company...I want to say for selected tha employe ..don't campare with marks ..tha selection for her capability.

I applied via Referral and was interviewed in Nov 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. What is PID and all about previous experience
  • Ans. 

    PID stands for Proportional-Integral-Derivative. It is a control algorithm used in engineering to regulate processes.

    • PID is a feedback control algorithm that continuously calculates an error value and adjusts the control effort to minimize the error.

    • It consists of three terms: Proportional, Integral, and Derivative, which are combined to calculate the control output.

    • The Proportional term responds to the current error, ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Explain what to you do in your past experience
Round 1 - HR 

(2 Questions)

  • Q1. Nil..................
  • Q2. Nil.................
Round 2 - Technical 

(1 Question)

  • Q1. Nil...................
Round 3 - Behavioral 

(2 Questions)

  • Q1. Nil...................
  • Q2. Nil.........?..........

Interview Preparation Tips

Interview preparation tips for other job seekers - Hello connections,
Kindly consider Toshniwal the last option in your short list criteria as such it has a lots of frustrating environment

I applied via Walk-in and was interviewed in Aug 2019. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. In my interview question asked on experience
  • Q2. PLC, SCADA, DCS ,HMI,Control Panel,Relay Logic, Plc logic

Interview Preparation Tips

Interview preparation tips for other job seekers - The Go with automation knowledge i will mention question above
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Difference between open loop and closed loop?
  • Ans. 

    Open loop does not have feedback mechanism, while closed loop does.

    • Open loop system does not have a feedback mechanism to adjust the output based on the input.

    • Closed loop system uses feedback from the output to control the input and maintain desired output.

    • Open loop systems are simpler and less accurate, while closed loop systems are more complex but more accurate.

    • Example: A toaster is an open loop system as it does no...

  • Answered by AI
  • Q2. What is equation of PID controller
  • Ans. 

    The equation of a PID controller is a control loop feedback mechanism used in industrial control systems.

    • The equation for a PID controller is: u(t) = Kp*e(t) + Ki*∫e(t)dt + Kd*de(t)/dt

    • Kp, Ki, and Kd are the proportional, integral, and derivative gains respectively

    • The proportional term Kp reacts to the current error value

    • The integral term Ki reacts to the accumulation of past errors

    • The derivative term Kd reacts to the r

  • Answered by AI
  • Q3. Name any two pressure sensors
  • Ans. 

    Two common pressure sensors are piezoresistive sensors and capacitive sensors.

    • Piezoresistive sensors: measure pressure by changes in electrical resistance

    • Capacitive sensors: measure pressure by changes in capacitance

  • Answered by AI
  • Q4. Difference between open loop and closed loop
  • Ans. 

    Open loop does not have feedback mechanism, while closed loop does.

    • Open loop system does not have a feedback mechanism to adjust the output based on the input.

    • Closed loop system uses feedback from the output to adjust the input and maintain desired output.

    • Examples of open loop systems include a toaster or a washing machine with a timer setting.

    • Examples of closed loop systems include a thermostat controlling room temper

  • Answered by AI
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - HR 

(4 Questions)

  • Q1. Previous And Current Salary Related Question
  • Q2. Current Designation in the company
  • Q3. Notice period for the company
  • Q4. Work and Documentation related question
Round 3 - Technical 

(6 Questions)

  • Q1. Job Resposibilities related question
  • Q2. Projects done related questions
  • Q3. Technical backgroud related question
  • Ans. Plc, scada, hmi, vfd, sensors, wiring related topics
  • Answered Anonymously
  • Q4. Whatever I have done in my current company related questions
  • Q5. Some Technical questions related to automation and maintenance.
  • Q6. How much salary I am expecting for current position

Interview Preparation Tips

Interview preparation tips for other job seekers - Work Experience Related Questions and Questions asked from your Education Background.

Synergy Systems & Solutions Interview FAQs

How many rounds are there in Synergy Systems & Solutions Project Engineer interview?
Synergy Systems & Solutions interview process usually has 1 rounds. The most common rounds in the Synergy Systems & Solutions interview process are Technical.

Tell us how to improve this page.

Synergy Systems & Solutions Project Engineer Interview Process

based on 1 interview

Interview experience

3
  
Average
View more
Synergy Systems & Solutions Project Engineer Salary
based on 92 salaries
₹1.9 L/yr - ₹6 L/yr
27% less than the average Project Engineer Salary in India
View more details

Synergy Systems & Solutions Project Engineer Reviews and Ratings

based on 26 reviews

4.0/5

Rating in categories

3.6

Skill development

3.4

Work-life balance

3.9

Salary

4.2

Job security

3.8

Company culture

4.2

Promotions

3.8

Work satisfaction

Explore 26 Reviews and Ratings
Project Engineer
92 salaries
unlock blur

₹1.9 L/yr - ₹6 L/yr

Senior Project Engineer
65 salaries
unlock blur

₹4 L/yr - ₹11.5 L/yr

AMC Engineer
53 salaries
unlock blur

₹1.8 L/yr - ₹4.3 L/yr

Automation Engineer
16 salaries
unlock blur

₹2.2 L/yr - ₹5 L/yr

Scada Engineer
12 salaries
unlock blur

₹2 L/yr - ₹6 L/yr

Explore more salaries
Compare Synergy Systems & Solutions with

TCS

3.7
Compare

Infosys

3.6
Compare

Wipro

3.7
Compare

HCLTech

3.5
Compare
Did you find this page helpful?
Yes No
write
Share an Interview