Suzlon Group
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
I applied via Company Website and was interviewed before Aug 2022. There were 3 interview rounds.
L1 L2 L3 planning refers to different levels of project planning, with L1 being high-level strategic planning, L2 being more detailed planning, and L3 being the most detailed and granular planning.
L1 planning focuses on setting overall project goals and objectives
L2 planning involves breaking down the project into smaller tasks and timelines
L3 planning includes detailed scheduling, resource allocation, and risk managem...
Yes, I am proficient in advance Excel including formulas, pivot tables, and data analysis.
Proficient in using formulas such as VLOOKUP, IF, SUMIF, etc.
Experienced in creating and manipulating pivot tables for data analysis.
Skilled in data visualization and creating charts/graphs for presentations.
Familiar with advanced functions like INDEX-MATCH, conditional formatting, and macros.
Top trending discussions
I applied via Company Website and was interviewed before Apr 2023. There were 2 interview rounds.
Scheduling in instrumentation and control for rotating equipment involves creating a detailed plan to ensure proper maintenance and operation.
Develop a detailed schedule outlining maintenance tasks for each piece of rotating equipment
Coordinate with operations and maintenance teams to ensure minimal downtime during maintenance activities
Utilize software tools such as CMMS to track maintenance activities and schedule fu...
Surge control in compressor is essential to prevent damage and maintain efficiency.
Surge control involves monitoring and adjusting the flow rate of the compressor to prevent surging.
Methods for surge control include using anti-surge valves, recycle valves, and variable speed drives.
Surge control systems often use sensors to detect changes in pressure and flow rate, triggering adjustments to prevent surging.
Proper surge...
Synchronisation in generators is the process of matching the voltage, frequency, and phase angle of multiple generators before connecting them in parallel.
Synchronisation ensures that the generators are operating in sync to prevent damage or power loss.
Key factors for synchronisation include voltage, frequency, and phase angle matching.
Synchronisation is typically done using synchronising lamps, synchroscopes, or autom...
I applied via Approached by Company and was interviewed before Dec 2021. There were 5 interview rounds.
Standard level including technical
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Electrical Engineer
581
salaries
| ₹1.4 L/yr - ₹6.7 L/yr |
Engineer
536
salaries
| ₹2 L/yr - ₹5.3 L/yr |
Junior Engineer
395
salaries
| ₹1.5 L/yr - ₹7.5 L/yr |
Senior Engineer
273
salaries
| ₹2.8 L/yr - ₹10.4 L/yr |
Assistant Manager
262
salaries
| ₹4.9 L/yr - ₹12 L/yr |
Vestas
Inox Wind
GE Vernova
Siemens Gamesa Renewable Power Private Limited