Upload Button Icon Add office photos

Suzlon Group

Compare button icon Compare button icon Compare

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

Suzlon Group Deputy Planning Manager Interview Questions and Answers

Updated 2 Aug 2023

Suzlon Group Deputy Planning Manager Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Aug 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(5 Questions)

  • Q1. What is L1 L2 L3 planning and which is the best part of the Planning
  • Ans. 

    L1 L2 L3 planning refers to different levels of project planning, with L1 being high-level strategic planning, L2 being more detailed planning, and L3 being the most detailed and granular planning.

    • L1 planning focuses on setting overall project goals and objectives

    • L2 planning involves breaking down the project into smaller tasks and timelines

    • L3 planning includes detailed scheduling, resource allocation, and risk managem...

  • Answered by AI
  • Q2. Describe yourself and why should we select you as a project planner.
  • Ans. Tell all about your professional achievements related to planning.
  • Answered Anonymously
  • Q3. How do you rate yourself on Microsoft Excel out of 10
  • Q4. Are you willing to relocate anywhere in India
  • Q5. Do you know advance Excel
  • Ans. 

    Yes, I am proficient in advance Excel including formulas, pivot tables, and data analysis.

    • Proficient in using formulas such as VLOOKUP, IF, SUMIF, etc.

    • Experienced in creating and manipulating pivot tables for data analysis.

    • Skilled in data visualization and creating charts/graphs for presentations.

    • Familiar with advanced functions like INDEX-MATCH, conditional formatting, and macros.

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. Discussion on salary
  • Q2. What is your notice period

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't nervous, answer confidently, carry all your supporting documents at least digital cv and salary slips 3 months, 4 photo to get considered.

Skills evaluated in this interview

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Apr 2023. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Basics of I&c in rotating equipment
  • Q2. How schedule in i&c for rotating equipment
  • Ans. 

    Scheduling in instrumentation and control for rotating equipment involves creating a detailed plan to ensure proper maintenance and operation.

    • Develop a detailed schedule outlining maintenance tasks for each piece of rotating equipment

    • Coordinate with operations and maintenance teams to ensure minimal downtime during maintenance activities

    • Utilize software tools such as CMMS to track maintenance activities and schedule fu...

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. Surge control in compressor
  • Ans. 

    Surge control in compressor is essential to prevent damage and maintain efficiency.

    • Surge control involves monitoring and adjusting the flow rate of the compressor to prevent surging.

    • Methods for surge control include using anti-surge valves, recycle valves, and variable speed drives.

    • Surge control systems often use sensors to detect changes in pressure and flow rate, triggering adjustments to prevent surging.

    • Proper surge...

  • Answered by AI
  • Q2. Synchronisation in generator explaining
  • Ans. 

    Synchronisation in generators is the process of matching the voltage, frequency, and phase angle of multiple generators before connecting them in parallel.

    • Synchronisation ensures that the generators are operating in sync to prevent damage or power loss.

    • Key factors for synchronisation include voltage, frequency, and phase angle matching.

    • Synchronisation is typically done using synchronising lamps, synchroscopes, or autom...

  • Answered by AI

Skills evaluated in this interview

I applied via Approached by Company and was interviewed before Dec 2021. There were 5 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Related to Job profile and project
Round 3 - Technical 

(1 Question)

  • Q1. Same as per 1st round but advance form
Round 4 - Aptitude Test 

Standard level including technical

Round 5 - HR 

(1 Question)

  • Q1. Personal appearance and behavioural

Interview Preparation Tips

Interview preparation tips for other job seekers - A good platform for civil engineers having experience of atleast 5 yrs and above.

Suzlon Group Interview FAQs

How many rounds are there in Suzlon Group Deputy Planning Manager interview?
Suzlon Group interview process usually has 3 rounds. The most common rounds in the Suzlon Group interview process are Resume Shortlist, One-on-one Round and HR.
What are the top questions asked in Suzlon Group Deputy Planning Manager interview?

Some of the top questions asked at the Suzlon Group Deputy Planning Manager interview -

  1. What is L1 L2 L3 planning and which is the best part of the Plann...read more
  2. Do you know advance Ex...read more

Tell us how to improve this page.

Suzlon Group Deputy Planning Manager Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Adani Group Interview Questions
3.9
 • 179 Interviews
Tata Power Interview Questions
3.9
 • 160 Interviews
NTPC Interview Questions
4.2
 • 159 Interviews
Torrent Power Interview Questions
3.7
 • 125 Interviews
Eaton Corporation Interview Questions
3.9
 • 116 Interviews
GE Vernova Interview Questions
4.2
 • 86 Interviews
Vestas Interview Questions
4.3
 • 82 Interviews
Hitachi Energy Interview Questions
4.1
 • 79 Interviews
Siemens Energy Interview Questions
4.2
 • 73 Interviews
View all

Suzlon Group Deputy Planning Manager Reviews and Ratings

based on 1 review

4.0/5

Rating in categories

4.0

Skill development

5.0

Work-life balance

2.0

Salary

5.0

Job security

3.0

Company culture

2.0

Promotions

5.0

Work satisfaction

Explore 1 Review and Rating
Electrical Engineer
581 salaries
unlock blur

₹1.4 L/yr - ₹6.7 L/yr

Engineer
536 salaries
unlock blur

₹2 L/yr - ₹5.3 L/yr

Junior Engineer
395 salaries
unlock blur

₹1.5 L/yr - ₹7.5 L/yr

Senior Engineer
273 salaries
unlock blur

₹2.8 L/yr - ₹10.4 L/yr

Assistant Manager
262 salaries
unlock blur

₹4.9 L/yr - ₹12 L/yr

Explore more salaries
Compare Suzlon Group with

Vestas

4.3
Compare

Inox Wind

3.7
Compare

GE Vernova

4.2
Compare

Siemens Gamesa Renewable Power Private Limited

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview