Upload Button Icon Add office photos

Filter interviews by

Sun Vacuum Formers Interview Questions, Process, and Tips

Updated 15 Nov 2024

Top Sun Vacuum Formers Interview Questions and Answers

View all 30 questions

Sun Vacuum Formers Interview Experiences

Popular Designations

16 interviews found

I applied via Referral and was interviewed in Jan 2021. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. How to calculate oee ppm 7qc tool spc injection molding defects TUBROLSUTTING red bin analysis
  • Ans. 

    Calculating OEE, PPM, 7QC tool SPC, Injection Molding Defects, Tubrolsutting, and Red Bin Analysis in Production Engineering

    • OEE can be calculated by multiplying Availability, Performance, and Quality

    • PPM (Parts Per Million) is a measure of defects per million parts produced

    • 7QC (Seven Quality Control) tools include Pareto charts, cause-and-effect diagrams, and control charts

    • SPC (Statistical Process Control) involves moni...

  • Answered by AI
  • Q2. Clamping force thikness man power handling etc

Interview Preparation Tips

Interview preparation tips for other job seekers - ??

Production Engineer Interview Questions asked at other Companies

Q1. How to solve the problem in robot means how to detect fault?
View answer (9)

Engineer Interview Questions & Answers

user image Lalit Upadhyay

posted on 5 Oct 2022

I applied via campus placement at Bharati Vidyapeeth College of Engineering, Pune and was interviewed before Oct 2021. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Technical aptitude related to engineering

Round 3 - HR 

(1 Question)

  • Q1. Basic HR related non technical questions
Round 4 - One-on-one 

(1 Question)

  • Q1. Basic technical questions from engineering

Interview Preparation Tips

Interview preparation tips for other job seekers - Should have basic understanding of manufacturing, engineering subjects knowledge.

Engineer Interview Questions asked at other Companies

Q1. ❖ If a team member is unable to carry out his work, he is doing it repetitively, how would you handle it?, would you like to work only on lifing of components, or would you be ready to shift to other departments?
View answer (5)

Interview Questionnaire 

3 Questions

  • Q1. What you guning in your duty time
  • Q2. How long you will stay in single position
  • Q3. What's your goal

QA QC Inspector, QA QC Engineer Interview Questions asked at other Companies

Q1. Why quality is mostly important for a product and why company is always dependant for quality?
View answer (1)

Interview Questionnaire 

1 Question

  • Q1. What is injection molding
  • Ans. 

    Injection molding is a manufacturing process used to produce parts by injecting molten material into a mold.

    • Molten material is injected into a mold cavity

    • The material cools and solidifies, taking the shape of the mold

    • Commonly used for producing plastic parts

    • Used in various industries such as automotive, medical, and consumer goods

  • Answered by AI

Diploma Apprentice Trainee Interview Questions asked at other Companies

Q1. What do you know about G - code or M - code???
View answer (2)

Sun Vacuum Formers interview questions for popular designations

 Engineer

 (2)

 Maintenance Engineer

 (2)

 Production Engineer

 (2)

 Diploma Apprentice Trainee

 (1)

 Electrical GET

 (1)

 Electrician

 (1)

 Junior Mechanical Engineer

 (1)

 PPC Engineer

 (1)

I applied via Naukri.com and was interviewed before Oct 2019. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. About hot runner molds, Sequential gate , slider lifter difference, raw material composition, steel selection for new molds, SOR for new tools , documents as per customer guidelines.
  • Q2. Heat treatment process, plastic material shrinkage value, density.

Interview Preparation Tips

Interview preparation tips for other job seekers - Always positive response or reply no negative reply and don't try to divert the question.

Tool Room Engineer Interview Questions asked at other Companies

Q1. Which different type of arc welding rod using die steel?
View answer (4)

I was interviewed in Dec 2016.

Interview Questionnaire 

8 Questions

  • Q1. 1) Tell me about yourself. 2)why do u wanna join our company? 3)At which level u can take this company? 4)At which level u saw yourself after 5 years in this company?
  • Q2. What is an injection molding machine?
  • Ans. 

    An injection molding machine is a manufacturing tool used to produce plastic parts by injecting molten material into a mold.

    • It consists of a hopper, an injection unit, a clamping unit, and a control unit.

    • The hopper is used to store the plastic material that will be melted and injected into the mold.

    • The injection unit melts the plastic and injects it into the mold.

    • The clamping unit holds the mold in place during the inj...

  • Answered by AI
  • Q3. Draw the electrical circuit to control barrel heater through SSR/contactor?
  • Ans. 

    Draw the electrical circuit to control barrel heater through SSR/contactor.

    • Start by identifying the power source and the barrel heater.

    • Connect the power source to the input terminals of the SSR/contactor.

    • Connect the output terminals of the SSR/contactor to the barrel heater.

    • Include appropriate fuses and circuit breakers for safety.

    • Consider using a control signal (e.g., from a temperature controller) to trigger the SSR/

  • Answered by AI
  • Q4. What is back pressure?
  • Ans. 

    Back pressure is the resistance or force exerted against the flow of a fluid or gas in a system.

    • Back pressure occurs when there is a restriction or blockage in a system that hinders the flow of a fluid or gas.

    • It can be caused by factors such as narrow pipes, clogged filters, or closed valves.

    • Back pressure can lead to decreased efficiency, increased energy consumption, and potential damage to the system.

    • In an engine, ba...

  • Answered by AI
  • Q5. Draw a complete injection molding cycle.
  • Ans. 

    The injection molding cycle involves several steps to produce a molded part.

    • Clamping: The mold is closed and clamped tightly.

    • Injection: Molten plastic is injected into the mold cavity.

    • Cooling: The plastic solidifies and cools inside the mold.

    • Ejection: The mold opens and the molded part is ejected.

    • Cycling: The mold closes again for the next cycle.

  • Answered by AI
  • Q6. Tell me the whole process and working of a three axis robots.
  • Ans. 

    A three-axis robot is a robotic system that operates in three dimensions, allowing it to move and manipulate objects in a wide range of directions.

    • A three-axis robot typically consists of three linear axes, each capable of independent movement along a specific axis (X, Y, and Z).

    • The X-axis controls horizontal movement, the Y-axis controls vertical movement, and the Z-axis controls depth or forward/backward movement.

    • By ...

  • Answered by AI
  • Q7. How can we convert a DC supply into AC supply?
  • Ans. 

    DC supply can be converted into AC supply using an inverter.

    • Inverter is an electronic device that converts DC to AC.

    • It uses a switching circuit to alternate the polarity of DC voltage.

    • The output waveform can be modified using filters and transformers.

    • Examples of inverters include square wave, modified sine wave, and pure sine wave inverters.

  • Answered by AI
  • Q8. Tell me the types of pumps!
  • Ans. 

    There are various types of pumps used in engineering, including centrifugal pumps, reciprocating pumps, and rotary pumps.

    • Centrifugal pumps are commonly used for transferring fluids by converting rotational energy into kinetic energy.

    • Reciprocating pumps use a piston or plunger to create pressure and move fluid.

    • Rotary pumps operate by trapping fluid between rotating components and the pump casing.

    • Other types of pumps inc...

  • Answered by AI

Interview Preparation Tips

Round: HR Interview
Experience: We can call this a PI round in which they ask about urself about ur previous experiences and about your future plannings for ur career.
Tips: Be confident,dont hesitate.They just want to test your confidence level and ur decision making skills.

Round: Technical Interview
Experience: As name says its a technical round, so they asked me the questions of top level.They want to know whether the candidate have only theoretical knowledge or he have practical knowledge also.So, answer only to the point,dont make your answer lengthy or round round.
Tips: If u knows the answer then answer it,if dont,then say directly a no dont tell them wrong or round round.

Top Sun Vacuum Formers Maintenance Engineer Interview Questions and Answers

Q1. Tell me the whole process and working of a three axis robots.
View answer (1)

Maintenance Engineer Interview Questions asked at other Companies

Q1. 1)which refrigeration cycle used in chilling plant?
View answer (9)

Sun Vacuum Formers Interview FAQs

How many rounds are there in Sun Vacuum Formers interview?
Sun Vacuum Formers interview process usually has 2-3 rounds. The most common rounds in the Sun Vacuum Formers interview process are Technical, HR and Resume Shortlist.
What are the top questions asked in Sun Vacuum Formers interview?

Some of the top questions asked at the Sun Vacuum Formers interview -

  1. Tell me the whole process and working of a three axis robo...read more
  2. Wastage control, how to increase productivity and manpower handli...read more
  3. How can we convert a DC supply into AC supp...read more

Tell us how to improve this page.

Sun Vacuum Formers Interview Process

based on 4 interviews in last 1 year

Interview experience

2.8
  
Poor

People are getting interviews through

based on 11 Sun Vacuum Formers interviews
Campus Placement
Referral
Company Website
Job Portal
Recruitment Consultant
36%
18%
9%
9%
9%
19% candidates got the interview through other sources.
High Confidence
?
High Confidence means the data is based on a large number of responses received from the candidates.

Interview Questions from Similar Companies

Uflex Interview Questions
3.7
 • 103 Interviews
Global Autotech Interview Questions
4.1
 • 45 Interviews
Ag Industries Interview Questions
4.0
 • 38 Interviews
Cosmo Films Interview Questions
3.7
 • 33 Interviews
EPL Limited Interview Questions
4.0
 • 21 Interviews
View all

Sun Vacuum Formers Reviews and Ratings

based on 176 reviews

4.0/5

Rating in categories

3.9

Skill development

3.7

Work-Life balance

3.2

Salary & Benefits

3.9

Job Security

3.6

Company culture

3.0

Promotions/Appraisal

3.6

Work Satisfaction

Explore 176 Reviews and Ratings
Junior Engineer
79 salaries
unlock blur

₹1.8 L/yr - ₹3.6 L/yr

Engineer
61 salaries
unlock blur

₹2.1 L/yr - ₹4.6 L/yr

Quality Engineer
54 salaries
unlock blur

₹2 L/yr - ₹3.6 L/yr

Production Engineer
44 salaries
unlock blur

₹2 L/yr - ₹4.5 L/yr

Maintenance Engineer
22 salaries
unlock blur

₹2.5 L/yr - ₹4.5 L/yr

Explore more salaries
Compare Sun Vacuum Formers with

Jain Irrigation Systems

4.0
Compare

EPL Limited

4.0
Compare

Manjushree Technopack

3.7
Compare

Time Technoplast

3.8
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview