M29 is a G-code used to stop writing to an SD card or other storage device.
M29 is used to end a file when writing to an SD card or other storage device.
It ensures that all data is written and prevents corruption of the file.
It is commonly used in CNC machines for drilling and tapping programs.
It can also be used for hole dialing and other precision operations.
M29 is often used in conjunction with other G and M codes to
I applied via Recruitment Consultant and was interviewed before Dec 2018. There were 3 interview rounds.
PPAP submission is the final phase of APQP.
PPAP submission is the final step in the APQP process.
It involves submitting a Production Part Approval Process (PPAP) to the customer.
PPAP includes documentation and samples that demonstrate the product meets customer requirements.
PPAP submission is necessary before production can begin.
PPAP submission is a critical step in ensuring product quality and customer satisfaction.
APQP consists of five phases, with PPAP being submitted in the fourth phase.
APQP stands for Advanced Product Quality Planning.
The five phases of APQP are: Planning and Program Definition, Product Design and Development, Process Design and Development, Product and Process Validation, and Launch, Feedback, Assessment, and Corrective Action.
PPAP stands for Production Part Approval Process.
PPAP is submitted in the fourth p...
To make a PPT, use a software like PowerPoint or Google Slides and follow a structure with clear and concise content.
Choose a template or create your own design
Add relevant and visually appealing images
Use bullet points and short sentences
Practice your presentation before presenting
Include a conclusion and call to action
Process audit involves reviewing and evaluating a company's procedures and policies to ensure they are effective and efficient.
Identify the process to be audited
Define the audit objectives and scope
Select the audit team and assign roles
Gather and analyze data
Identify areas for improvement
Develop and implement corrective actions
Monitor and follow up on corrective actions
Document the audit findings and recommendations
When a customer complaint arises, I listen attentively, empathize with their concerns, investigate the issue, propose a solution, and follow up to ensure satisfaction.
Listen attentively to the customer's complaint
Empathize with their concerns and show understanding
Investigate the issue by gathering relevant information
Propose a solution or offer alternatives to address the complaint
Follow up with the customer to ensure
Can you please clarify the question?
I'm sorry, I don't understand what you're asking.
Could you please rephrase the question?
I need more information to answer that question.
Gauges and fixtures should be developed during the design phase of NPD to ensure quality and efficiency.
Identify critical dimensions and tolerances early on
Develop gauges and fixtures to measure and verify these dimensions
Test and refine gauges and fixtures throughout the design process
Ensure gauges and fixtures are compatible with manufacturing processes
Finalize gauges and fixtures before production begins
I applied via Referral and was interviewed in Jul 2021. There were 4 interview rounds.
I applied via Walk-in and was interviewed before Sep 2023. There were 2 interview rounds.
Math electrical related
posted on 25 Jun 2024
I applied via Referral and was interviewed in Dec 2023. There was 1 interview round.
I applied via Naukri.com and was interviewed in Dec 2023. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Aug 2023. There were 4 interview rounds.
Core tools of AIAG include FMEA, PPAP, MSA, SPC, and APQP.
FMEA (Failure Mode and Effects Analysis) is used to identify and prioritize potential failure modes in a process.
PPAP (Production Part Approval Process) is used to ensure that suppliers meet customer requirements.
MSA (Measurement Systems Analysis) is used to assess the quality of measurement systems.
SPC (Statistical Process Control) is used to monitor and contro...
I have experienced failures in project deadlines, communication, and technical solutions.
Missed project deadlines due to underestimating tasks
Miscommunication with team members leading to misunderstandings
Implemented technical solutions that did not meet requirements
Heat treatment process is a method used to alter the physical and sometimes chemical properties of a material through heating and cooling.
Involves heating the material to a specific temperature
Holding it at that temperature for a set amount of time
Then cooling it at a controlled rate
Can be used to increase hardness, improve machinability, or enhance other properties
Common techniques include annealing, quenching, temper
Tyre testing in market and branches
Junior Engineer
99
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
62
salaries
| ₹0 L/yr - ₹0 L/yr |
Quality Engineer
54
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Engineer
44
salaries
| ₹0 L/yr - ₹0 L/yr |
Maintenance Engineer
23
salaries
| ₹0 L/yr - ₹0 L/yr |
Jain Irrigation Systems
EPL Limited
Manjushree Technopack
Time Technoplast