Filter interviews by
I applied via Campus Placement and was interviewed in Mar 2024. There was 1 interview round.
A transformer is a device that transfers electrical energy between two or more circuits through electromagnetic induction.
Transformers work on the principle of electromagnetic induction
They consist of primary and secondary coils wound around a core
The primary coil is connected to a power source, creating a magnetic field
This magnetic field induces a voltage in the secondary coil, transferring energy
Transformers are use...
I applied via Referral and was interviewed in Sep 2023. There were 4 interview rounds.
I applied via Campus Placement and was interviewed in Jul 2023. There were 3 interview rounds.
Sun Vacuum Formers interview questions for popular designations
I applied via Recruitment Consulltant and was interviewed before Oct 2023. There was 1 interview round.
OEE stands for Overall Equipment Effectiveness. It is a measure of how well a manufacturing process is performing.
OEE is calculated by multiplying Availability, Performance, and Quality.
Availability = (Operating Time / Planned Production Time) * 100%
Performance = (Ideal Cycle Time * Total Count) / Operating Time * 100%
Quality = Good Count / Total Count * 100%
OEE = Availability * Performance * Quality
For example, if a m...
Plan vs actual is comparing planned production output with actual production output. Production efficiency is calculated by dividing actual output by planned output.
Plan vs actual is a comparison between the planned production output and the actual production output.
Production efficiency is calculated by dividing the actual production output by the planned production output and multiplying by 100 to get a percentage.
Fo...
SMED stands for Single-Minute Exchange of Die. It is required in molding machines to reduce setup time and increase efficiency.
SMED is a lean manufacturing technique used to reduce setup time in manufacturing processes.
It involves analyzing and streamlining the setup process to minimize downtime between production runs.
By implementing SMED, companies can increase machine utilization and overall productivity.
For molding...
PPAP, PDCA, PPE, APQP, DI, SOP, PPVT are all acronyms commonly used in engineering and manufacturing processes.
PPAP - Production Part Approval Process: Ensures suppliers meet customer requirements for new or modified parts.
PDCA - Plan-Do-Check-Act: Four-step management method used for continuous improvement.
PPE - Personal Protective Equipment: Equipment worn to minimize exposure to hazards.
APQP - Advanced Product Quali...
Quality is meeting or exceeding customer expectations consistently.
Quality is about meeting customer requirements and expectations.
It involves consistency in delivering products or services.
Quality also includes continuous improvement and striving for excellence.
Examples: Producing defect-free products, providing excellent customer service.
7 QC tools are a set of basic statistical tools used for quality control and process improvement.
Check sheet: Used to collect and organize data in a structured format.
Histogram: Represents data distribution visually to identify patterns.
Pareto chart: Helps prioritize issues by showing the most significant factors.
Cause-and-effect diagram (Fishbone diagram): Identifies root causes of a problem.
Scatter diagram: Shows the...
MSA stands for Measurement System Analysis and SPC stands for Statistical Process Control. These tools are used in Quality to ensure accuracy and consistency in measurements and processes.
MSA is used to assess the capability of a measurement system to provide accurate and reliable data.
SPC is used to monitor and control processes to ensure they are stable and in control.
MSA helps in identifying sources of variation in ...
Problem solving tools are techniques or methods used to identify, analyze, and solve complex issues or challenges.
Root cause analysis
Brainstorming
SWOT analysis
Fishbone diagram
5 Whys technique
Engineering materials are substances used to create products and structures, with specific properties like density and temperature requirements.
Engineering materials are substances used in the design and construction of products and structures.
Density refers to the mass per unit volume of a material.
Temperature requirements indicate the range within which a material can perform effectively.
Examples include steel (densi...
PPM stands for parts per million, a measurement used to quantify the concentration of a substance in a solution. Rejection control involves identifying and addressing the root causes of rejected products to reduce ppm levels.
PPM is a unit of measurement used to express very low concentrations of a substance in a solution.
To control rejection, identify and address the root causes of rejected products such as quality iss...
To reduce part cycle time, optimize processes, improve equipment efficiency, and streamline workflows.
Optimize processes to eliminate any unnecessary steps or delays
Improve equipment efficiency by regular maintenance and upgrades
Streamline workflows by implementing lean manufacturing principles
Utilize automation and robotics to speed up production
Train employees to work more efficiently and effectively
Reduce flash by optimizing code, minimizing unnecessary animations, and using efficient image formats.
Optimize code to reduce unnecessary animations and transitions
Minimize the use of large image files and use efficient image formats like WebP or JPEG 2000
Consider lazy loading images to reduce initial load time
Use CSS sprites to combine multiple images into a single file to reduce HTTP requests
Core settings can be set by accessing the system's BIOS or UEFI interface.
Access the system's BIOS or UEFI interface by pressing a specific key during startup (e.g. F2, Del, F10).
Navigate to the 'Advanced' or 'Settings' menu to find options for setting core settings.
Make changes carefully as incorrect settings can cause system instability or failure.
I have experience handling various types of moulding machines including injection moulding, blow moulding, and compression moulding machines.
Injection moulding machines
Blow moulding machines
Compression moulding machines
Led a team to successfully implement a new software system, resulting in a 20% increase in efficiency.
Led team to implement new software system
Achieved 20% increase in efficiency
Received recognition for project success
Case studies involve analyzing real-life situations to draw conclusions and make recommendations.
Identify the key issues or problems in the case study
Gather relevant information and data to analyze the situation
Apply relevant theories or frameworks to analyze the case
Draw conclusions and make recommendations based on the analysis
Consider alternative solutions and their potential outcomes
A product is a tangible or intangible item that is created through a process and offered for sale to satisfy a need or want.
Products can be physical goods like electronics, clothing, or food
Products can also be services like consulting, education, or healthcare
Products can be digital goods like software, music, or e-books
Material grade refers to the quality or composition of a material, typically indicated by a specific code or designation.
Material grade indicates the quality, composition, and properties of a material.
It is often denoted by specific codes or designations, such as ASTM A36 for structural steel.
Higher material grades generally indicate better quality or performance.
Material grade is important in determining the suitabili
Various types of materials have been used depending on the project requirements, including steel, concrete, wood, and composite materials.
Steel is commonly used for structural components due to its strength and durability
Concrete is often used for foundations and building structures
Wood is used for interior finishes and decorative elements
Composite materials are used in aerospace and automotive industries for their lig
Seeking new challenges and growth opportunities.
Desire for new challenges and opportunities for growth
Looking for a change in work environment
Seeking better work-life balance
Interested in exploring different industries or technologies
My expectation is to work in a challenging environment where I can utilize my skills and knowledge to contribute to the success of the team and company.
Opportunity to work on complex projects
Collaborative team environment
Continuous learning and growth opportunities
Recognition for achievements
Competitive compensation and benefits
I applied via Recruitment Consulltant and was interviewed before Mar 2023. There were 2 interview rounds.
I applied via Company Website and was interviewed in Jan 2022. There was 1 interview round.
To control wastage and increase productivity, proper planning, training, and monitoring are necessary.
Implement lean manufacturing techniques
Train employees on efficient use of resources
Monitor production processes to identify areas of improvement
Implement quality control measures to reduce defects
Optimize production schedules to reduce downtime
Invest in automation to reduce manual labor
Encourage employee feedback and
HRTC, MTC, Chiller, Sequencer and Robot are all equipment used in production engineering.
HRTC (High Rate Thermo Chiller) is used for cooling high power lasers in manufacturing.
MTC (Multi-Temperature Chiller) is used for cooling multiple machines at different temperatures.
Chiller is used for cooling various equipment in production.
Sequencer is used to control the sequence of operations in a manufacturing process.
Robot i...
I applied via campus placement at Board of Technical Education (BTE) and was interviewed in Sep 2021. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed before Oct 2020. There were 7 interview rounds.
Top trending discussions
Interview experience
based on 176 reviews
Rating in categories
Junior Engineer
79
salaries
| ₹1.8 L/yr - ₹3.6 L/yr |
Engineer
61
salaries
| ₹2.1 L/yr - ₹4.6 L/yr |
Quality Engineer
54
salaries
| ₹1.7 L/yr - ₹3.6 L/yr |
Production Engineer
44
salaries
| ₹2 L/yr - ₹4.5 L/yr |
Maintenance Engineer
24
salaries
| ₹2.5 L/yr - ₹4.5 L/yr |
Jain Irrigation Systems
EPL Limited
Manjushree Technopack
Time Technoplast