Turbine erection alignment and commissioning procedure involves the process of aligning and commissioning a turbine for optimal performance.
Turbine erection alignment involves ensuring the turbine is properly aligned with the foundation and other components.
Commissioning procedure includes testing and verifying the functionality of the turbine.
Alignment is typically done using laser alignment tools to ensure precise po...
The turbine erection sequence refers to the specific order in which the components of a turbine are assembled and installed.
The foundation is prepared and the anchor bolts are installed.
The base frame is positioned and aligned with the anchor bolts.
The turbine tower sections are lifted and assembled on top of the base frame.
The nacelle, which houses the turbine's generator and other components, is installed on top of t...
posted on 14 Jul 2017
I appeared for an interview before Jul 2016.
I applied via Campus Placement and was interviewed before Feb 2021. There were 2 interview rounds.
3 tests are conducted
DCS is used for continuous processes while PLC is used for discrete processes.
DCS stands for Distributed Control System and is used for continuous processes like oil refining, power generation, etc.
PLC stands for Programmable Logic Controller and is used for discrete processes like assembly lines, packaging machines, etc.
DCS is designed to handle large amounts of data from multiple sources and control multiple processe...
Control valves regulate fluid flow by adjusting the size of the valve opening.
Control valves are used in various industries such as oil and gas, chemical, and power generation.
They work by adjusting the size of the valve opening to regulate the flow of fluid.
The valve opening is controlled by a signal from a controller, which can be manual or automated.
Control valves can be classified into different types such as globe...
A pressure switch is a device that monitors pressure levels and triggers an action when a certain pressure is reached.
Pressure switch consists of a sensing element, switch mechanism, and a pressure port.
When the pressure reaches a certain level, the sensing element triggers the switch mechanism to open or close an electrical circuit.
Pressure switches are used in various applications such as HVAC systems, water pumps, a
posted on 15 Nov 2020
I applied via Walk-in and was interviewed before Nov 2019. There were 3 interview rounds.
The duration and machinery requirement for dumping and compacting one lakh cum of soil.
The duration depends on the capacity of the machinery and the number of machines used.
The type of soil and the site conditions also affect the duration.
On average, it takes around 30-45 days to complete the task.
The machinery required includes excavators, bulldozers, dump trucks, and compactors.
Minor bridges are usually shorter and have a lower weight capacity than major bridges.
Major bridges are typically longer and have a higher weight capacity than minor bridges.
Minor bridges are often used for pedestrian or bike traffic, while major bridges are used for vehicles and heavy machinery.
Major bridges may require more maintenance and have a higher construction cost than minor bridges.
Examples of major bridges i...
posted on 12 Nov 2020
I applied via Company Website and was interviewed in May 2020. There were 3 interview rounds.
MPLS is a protocol used for efficient packet forwarding. It uses labels to identify paths instead of IP addresses.
MPLS stands for Multiprotocol Label Switching
Labels are assigned to packets at the ingress router
Labels are used to identify the path a packet should take through the network
Labels are swapped at each MPLS router along the path
The last MPLS router removes the label and forwards the packet based on the IP ad...
Route reflector is a BGP feature that allows a router to advertise routes to its clients without requiring full mesh connectivity.
Route reflector reduces the number of iBGP peerings required in a network.
It helps in scaling the network by reducing the number of updates and processing required.
Route reflector can be configured in a hierarchical manner to further reduce the number of iBGP peerings.
It is commonly used in ...
posted on 17 Feb 2021
I applied via Walk-in and was interviewed in Aug 2020. There was 1 interview round.
posted on 23 Oct 2020
I applied via Recruitment Consultant and was interviewed in Apr 2020. There were 3 interview rounds.
posted on 13 Mar 2024
My personal Profile, working knowledge,
My nature, behavior, honesty, simplicity, connecting people, positive attitude, relationship with other, communications, adjustment, negotiation, working Exposure,time management.
I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.
The neutral axis is the line where the stress is zero in a reinforced concrete structure.
The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.
The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.
The position of the neutral axis affects the amount of reinforcement required in the tension zone.
The n...
posted on 20 Dec 2020
I applied via Naukri.com and was interviewed in Nov 2020. There was 1 interview round.
The percentage of bitumen in DBM varies depending on the specific mix design and project requirements.
DBM stands for Dense Bituminous Macadam, which is a type of road construction material.
The percentage of bitumen in DBM typically ranges from 4% to 6% by weight.
The exact percentage of bitumen is determined based on factors such as traffic load, climate conditions, and desired durability.
Higher percentages of bitumen a...
based on 30 reviews
Rating in categories
Assistant Engineer
7
salaries
| ₹2.8 L/yr - ₹4.3 L/yr |
Assistant Manager
5
salaries
| ₹4.8 L/yr - ₹6.6 L/yr |
Contract Engineer
5
salaries
| ₹4 L/yr - ₹6 L/yr |
Graduate Engineer Trainee (Get)
4
salaries
| ₹2.8 L/yr - ₹4 L/yr |
Tunnel Engineer
4
salaries
| ₹4.8 L/yr - ₹7.8 L/yr |
GMR Group
Reliance Infrastructure
Adani Infra
Tata Projects