Filter interviews by
I was interviewed in Dec 2024.
Calculating material quantities, slab types, reinforcement details, and quality testing in civil engineering.
Quantity of cement, sand, and aggregate for 1m³ of concrete is calculated by the mix design method.
One-way slabs are supported on two opposite sides, while two-way slabs are supported on all four sides.
Development length is calculated based on the diameter of the reinforcement bar and the grade of concrete.
Ancho...
Shuttering and deshuttering time, formwork types, reinforcement lap length, slump value, factors affecting shuttering removal time, honeycombing causes and control.
Shuttering and deshuttering time varies based on the type of structure and environmental conditions.
Types of formwork include timber formwork, steel formwork, plastic formwork, etc.
Minimum and maximum lap length for column reinforcement is typically 50 times...
1. Assess Communication Skills – How clearly and effectively you express your ideas.
2. Test Knowledge – How well you understand the given topic.
3. Evaluate Leadership Skills – Whether you can take initiative and lead the discussion.
4. Check Teamwork Ability – Whether you listen to others and engage respectfully.
5. Analyze Logical Thinking – How well you present arguments with reasoning and clarity.
Top trending discussions
I applied via Walk-in and was interviewed in Oct 2024. There was 1 interview round.
OHT stands for Overhead Tank. It is a water storage tank placed at a height to provide water pressure for distribution.
OHT is typically placed on the roof of a building or on a tower to ensure gravity-fed water supply.
The water is pumped into the OHT from a water source like a borewell or municipal supply.
The height of the OHT determines the water pressure available for distribution.
Pipes are connected from the OHT to ...
FHTC stands for First Horizontal Tangent Point, a key element in highway design.
FHTC marks the beginning of a horizontal curve on a highway.
It is typically located at the point where the road transitions from a straight section to a curved section.
Proper placement of FHTC is crucial for ensuring safe and efficient traffic flow.
Design considerations at FHTC include curve radius, superelevation, and sight distance.
FHTC i...
I applied via Recruitment Consulltant and was interviewed before Oct 2022. There were 2 interview rounds.
Construction and maintenance of GIS buildings involves planning, design, construction, and ongoing upkeep of the facility.
GIS building construction requires detailed planning and design to ensure the facility meets the specific needs of the project.
Regular maintenance is essential to keep the GIS building in optimal condition and prevent costly repairs in the future.
Maintenance tasks may include HVAC system checks, roo...
I applied via Naukri.com and was interviewed before Dec 2022. There were 2 interview rounds.
I applied via Walk-in and was interviewed in May 2022. There were 2 interview rounds.
M20 grade of concrete has a compressive strength of 20 N/mm² after 28 days.
M20 grade of concrete is a mix of 1:1.5:3 cement, sand, and aggregate respectively.
It is commonly used for residential and commercial construction.
The compressive strength of M20 grade concrete after 28 days is 20 N/mm².
This strength can be achieved by proper curing and water-cement ratio.
I applied via Recruitment Consulltant and was interviewed before Dec 2021. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Oct 2021. There were 3 interview rounds.
I applied via Company Website and was interviewed in Feb 2021. There were 3 interview rounds.
I applied via Indeed and was interviewed before Aug 2020. There was 1 interview round.
Piling is a construction procedure used to strengthen the foundation of a building. It involves various methods and the time taken depends on several factors.
Piling is done using methods like driven piles, bored piles, and auger cast piles.
Driven piles involve hammering precast concrete or steel piles into the ground.
Bored piles are created by drilling a hole into the ground and filling it with concrete.
Auger cast pile...
Interview experience
Accountant
9
salaries
| ₹3.5 L/yr - ₹5.4 L/yr |
Site Engineer
7
salaries
| ₹2.5 L/yr - ₹4.4 L/yr |
Project Engineer
6
salaries
| ₹4.2 L/yr - ₹6.8 L/yr |
Project Manager
4
salaries
| ₹5.6 L/yr - ₹15 L/yr |
Civil Site Engineer
4
salaries
| ₹3.2 L/yr - ₹4.8 L/yr |
Larsen & Toubro Limited
Tata Projects
GMR Group
Reliance Infrastructure