M20 mix ratio is a type of concrete mix used in construction. IS code recommends the ratio of cement, sand, and aggregate for M20 mix.
M20 mix has a compressive strength of 20 MPa after 28 days of curing
The recommended mix ratio for M20 is 1:1.5:3, which means 1 part cement, 1.5 parts sand, and 3 parts aggregate
IS code 456-2000 recommends the mix ratio and other specifications for concrete work
The cube size used in compressive strength determining test is typically 150mm x 150mm x 150mm.
The cube size is standardized by ASTM and IS codes.
The cubes are cast in three layers and compacted using a standard vibration table.
The cubes are cured in water for 28 days before testing.
The compressive strength of the cubes is determined using a compression testing machine.
The cube size may vary depending on the project sp
Water cement ratio test determines the amount of water needed to produce a certain consistency of cement.
Water cement ratio test is done to determine the amount of water needed to produce a certain consistency of cement.
The test involves mixing a certain amount of cement with water and measuring the consistency of the resulting mixture.
The result of the test is expressed as a ratio of the weight of water to the weight ...
Top trending discussions
I applied via Naukri.com and was interviewed in Dec 2023. There was 1 interview round.
The least count of a dumpy level staff reading is typically 0.01 ft or 1 mm.
The least count is the smallest measurement that can be read on the scale of the dumpy level staff.
For most dumpy levels, the least count is 0.01 ft or 1 mm.
This means that the dumpy level can measure differences in elevation as small as 0.01 ft or 1 mm.
Concrete cover is provided for reinforcement to protect it from corrosion, fire, and other environmental factors.
Concrete cover protects reinforcement from corrosion by preventing exposure to moisture and aggressive chemicals.
It provides fire resistance by acting as a barrier between the reinforcement and the fire.
Concrete cover helps in maintaining the bond between reinforcement and concrete, ensuring structural integ...
The volume of a 50 kg bag of cement varies depending on the density of the cement.
The volume of cement can be calculated using the formula: Volume = Mass / Density
The density of cement typically ranges from 1.1 to 1.6 g/cm^3
For example, if the density of the cement is 1.4 g/cm^3, the volume of a 50 kg bag would be approximately 35.71 liters
Ductility of steel refers to its ability to deform without breaking under stress.
Ductility is a crucial property in structural engineering as it allows steel to be shaped and formed into various structures.
Steel with high ductility can undergo significant deformation before failure.
Ductility is often measured by the percentage of elongation or reduction in area during a tensile test.
Examples of ductile materials includ
The size of a concrete cube is typically 150mm x 150mm x 150mm.
Standard size of a concrete cube is 150mm x 150mm x 150mm
Used for testing the compressive strength of concrete
Other sizes like 100mm x 100mm x 100mm or 200mm x 200mm x 200mm may also be used
Civil engineers at site are responsible for overseeing construction projects, ensuring they are completed safely, on time, and within budget.
Supervising construction activities to ensure compliance with design specifications and safety standards
Managing resources and materials efficiently to meet project deadlines
Collaborating with architects, contractors, and other stakeholders to resolve any issues that may arise
Cond...
Minimum concrete grade for RCC work is M20.
Minimum concrete grade for RCC work is M20 as per IS 456:2000.
Higher grades like M25, M30, M35, etc. can also be used depending on structural requirements.
Concrete grades indicate the compressive strength of concrete after 28 days of curing.
Higher grades are used for structures requiring higher strength like bridges, high-rise buildings, etc.
The density of unit weight of cement is typically around 1440 kg/m^3.
The density of unit weight of cement is commonly around 1440 kg/m^3.
This value can vary slightly depending on the type and brand of cement.
Density is a measure of mass per unit volume, in this case, kilograms per cubic meter.
Grade of cement refers to the strength of the cement as per the compressive strength test.
Grade of cement is determined by the compressive strength of cement mortar cubes at 28 days of curing.
Common grades of cement include 33, 43, and 53 where the number represents the compressive strength in MPa.
Higher grade cement is used for structures requiring higher strength like bridges and high-rise buildings.
The slump value of concrete for Normal RCC work is typically between 25-75 mm.
The slump value of concrete for Normal RCC work is usually around 50 mm.
The slump value can vary based on the specific requirements of the project and the mix design.
A higher slump value indicates a more workable concrete mix, while a lower slump value may be used for specialized applications.
It is important to test the slump value of concret...
Generally, 7-8 bags of cement are required to fill 1 cubic meter of concrete.
On average, 7-8 bags of cement are needed to fill 1 cubic meter of concrete.
The exact number of bags may vary based on the mix design and proportions used.
For example, if each bag of cement is 50 kg, then 7 bags would be 350 kg and 8 bags would be 400 kg.
I applied via Walk-in and was interviewed in Feb 2024. There were 3 interview rounds.
Building and roads related
I was interviewed in Jul 2023.
Steel estimation in a beam involves calculating the quantity of steel required for reinforcement.
Calculate the total length of steel bars required based on the dimensions of the beam and the spacing of the bars.
Determine the diameter of the steel bars to be used for reinforcement.
Consider the grade of steel and the design requirements to calculate the total weight of steel needed.
Account for wastage and additional rein...
posted on 13 Apr 2023
I applied via Walk-in and was interviewed in Mar 2023. There were 2 interview rounds.
I applied via Referral and was interviewed in Dec 2023. There were 2 interview rounds.
Quality control and waste management
Maths reasoning and core subjects
I applied via Company Website and was interviewed in Apr 2023. There were 3 interview rounds.
OPC cement is made from limestone and clay, while PPC cement is made from fly ash and clay.
OPC cement has higher strength and is used for construction of high-rise buildings and bridges.
PPC cement has better workability and is used for plastering and finishing works.
PPC cement is more eco-friendly as it uses industrial waste as a raw material.
OPC cement is costlier than PPC cement.
OPC cement is commonly used in areas w...
A two way slab is a type of reinforced concrete slab that is supported by beams on all four sides.
Two way slab is used in buildings with large column spacing
It is designed to resist both positive and negative bending moments
It is commonly used in parking garages, commercial buildings, and residential buildings
Two way slab is more economical than one way slab for larger spans
Dgijvcctuhgcvh hjjcc ghjj
I applied via Walk-in and was interviewed before Mar 2023. There was 1 interview round.
Water treatment plant process involves several steps to remove impurities and make water safe for consumption.
Coagulation: Chemicals are added to water to make impurities clump together.
Sedimentation: The clumped impurities settle at the bottom of the tank.
Filtration: Water passes through layers of sand, gravel, and charcoal to remove remaining impurities.
Disinfection: Chlorine or other chemicals are added to kill bact...
I applied via campus placement at KJ's Educational Institute Trinity Institute of Management and Research, Pune and was interviewed in Mar 2022. There were 3 interview rounds.
Pre and post pendamic
Yes, I am ready to locate and work on various civil engineering projects.
I am experienced in using GPS technology for site surveys and mapping.
I am familiar with reading and interpreting blueprints and construction plans.
I have knowledge of local building codes and regulations.
I am prepared to travel to different project sites as needed.
based on 2 reviews
Rating in categories
Electrical Engineer
4
salaries
| ₹1.8 L/yr - ₹2 L/yr |
Civil Site Engineer
4
salaries
| ₹1.8 L/yr - ₹2.2 L/yr |
Project Engineer
3
salaries
| ₹2.1 L/yr - ₹4 L/yr |
Site Engineer
3
salaries
| ₹2 L/yr - ₹4.8 L/yr |
Electrician
3
salaries
| ₹1.2 L/yr - ₹3.6 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
GMR Group