Upload Button Icon Add office photos

Filter interviews by

Su Square Projects And Infrastructure Civil Engineer Interview Questions and Answers

Updated 19 Apr 2022

Su Square Projects And Infrastructure Civil Engineer Interview Experiences

1 interview found

I applied via Walk-in and was interviewed in Mar 2022. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. M20 mix ratio, what is m20 mix means,what is IS code recommendation for concrete work
  • Ans. 

    M20 mix ratio is a type of concrete mix used in construction. IS code recommends the ratio of cement, sand, and aggregate for M20 mix.

    • M20 mix has a compressive strength of 20 MPa after 28 days of curing

    • The recommended mix ratio for M20 is 1:1.5:3, which means 1 part cement, 1.5 parts sand, and 3 parts aggregate

    • IS code 456-2000 recommends the mix ratio and other specifications for concrete work

  • Answered by AI
  • Q2. Cube size used in compressive strength determining test
  • Ans. 

    The cube size used in compressive strength determining test is typically 150mm x 150mm x 150mm.

    • The cube size is standardized by ASTM and IS codes.

    • The cubes are cast in three layers and compacted using a standard vibration table.

    • The cubes are cured in water for 28 days before testing.

    • The compressive strength of the cubes is determined using a compression testing machine.

    • The cube size may vary depending on the project sp

  • Answered by AI
  • Q3. Water cement ratio determining test and it's result
  • Ans. 

    Water cement ratio test determines the amount of water needed to produce a certain consistency of cement.

    • Water cement ratio test is done to determine the amount of water needed to produce a certain consistency of cement.

    • The test involves mixing a certain amount of cement with water and measuring the consistency of the resulting mixture.

    • The result of the test is expressed as a ratio of the weight of water to the weight ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Confident, prepare for the interview

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Naukri.com and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - Technical 

(11 Questions)

  • Q1. What is the Least Count of dumpy level Staff Reading ?
  • Ans. 

    The least count of a dumpy level staff reading is typically 0.01 ft or 1 mm.

    • The least count is the smallest measurement that can be read on the scale of the dumpy level staff.

    • For most dumpy levels, the least count is 0.01 ft or 1 mm.

    • This means that the dumpy level can measure differences in elevation as small as 0.01 ft or 1 mm.

  • Answered by AI
  • Q2. Why Concrete Cover is provided for reinforcement ?
  • Ans. 

    Concrete cover is provided for reinforcement to protect it from corrosion, fire, and other environmental factors.

    • Concrete cover protects reinforcement from corrosion by preventing exposure to moisture and aggressive chemicals.

    • It provides fire resistance by acting as a barrier between the reinforcement and the fire.

    • Concrete cover helps in maintaining the bond between reinforcement and concrete, ensuring structural integ...

  • Answered by AI
  • Q3. What is tha volume of 50 kg bag of cement ?
  • Ans. 

    The volume of a 50 kg bag of cement varies depending on the density of the cement.

    • The volume of cement can be calculated using the formula: Volume = Mass / Density

    • The density of cement typically ranges from 1.1 to 1.6 g/cm^3

    • For example, if the density of the cement is 1.4 g/cm^3, the volume of a 50 kg bag would be approximately 35.71 liters

  • Answered by AI
  • Q4. What is Dessity of steel ?
  • Ans. 

    Ductility of steel refers to its ability to deform without breaking under stress.

    • Ductility is a crucial property in structural engineering as it allows steel to be shaped and formed into various structures.

    • Steel with high ductility can undergo significant deformation before failure.

    • Ductility is often measured by the percentage of elongation or reduction in area during a tensile test.

    • Examples of ductile materials includ

  • Answered by AI
  • Q5. What is tha size of concrete Cube ?
  • Ans. 

    The size of a concrete cube is typically 150mm x 150mm x 150mm.

    • Standard size of a concrete cube is 150mm x 150mm x 150mm

    • Used for testing the compressive strength of concrete

    • Other sizes like 100mm x 100mm x 100mm or 200mm x 200mm x 200mm may also be used

  • Answered by AI
  • Q6. What is tha Role of a Civil Engineer at Site ?
  • Ans. 

    Civil engineers at site are responsible for overseeing construction projects, ensuring they are completed safely, on time, and within budget.

    • Supervising construction activities to ensure compliance with design specifications and safety standards

    • Managing resources and materials efficiently to meet project deadlines

    • Collaborating with architects, contractors, and other stakeholders to resolve any issues that may arise

    • Cond...

  • Answered by AI
  • Q7. What is tha minimum concrete grade for RCC work ?
  • Ans. 

    Minimum concrete grade for RCC work is M20.

    • Minimum concrete grade for RCC work is M20 as per IS 456:2000.

    • Higher grades like M25, M30, M35, etc. can also be used depending on structural requirements.

    • Concrete grades indicate the compressive strength of concrete after 28 days of curing.

    • Higher grades are used for structures requiring higher strength like bridges, high-rise buildings, etc.

  • Answered by AI
  • Q8. What is rha dsssity of Unit wait of cement ?
  • Ans. 

    The density of unit weight of cement is typically around 1440 kg/m^3.

    • The density of unit weight of cement is commonly around 1440 kg/m^3.

    • This value can vary slightly depending on the type and brand of cement.

    • Density is a measure of mass per unit volume, in this case, kilograms per cubic meter.

  • Answered by AI
  • Q9. What is tha Grade of Cement ?
  • Ans. 

    Grade of cement refers to the strength of the cement as per the compressive strength test.

    • Grade of cement is determined by the compressive strength of cement mortar cubes at 28 days of curing.

    • Common grades of cement include 33, 43, and 53 where the number represents the compressive strength in MPa.

    • Higher grade cement is used for structures requiring higher strength like bridges and high-rise buildings.

  • Answered by AI
  • Q10. What is the Slump value of concrete for Normal RCC work
  • Ans. 

    The slump value of concrete for Normal RCC work is typically between 25-75 mm.

    • The slump value of concrete for Normal RCC work is usually around 50 mm.

    • The slump value can vary based on the specific requirements of the project and the mix design.

    • A higher slump value indicates a more workable concrete mix, while a lower slump value may be used for specialized applications.

    • It is important to test the slump value of concret...

  • Answered by AI
  • Q11. How many cube filled for 1 cubic meter concrete ?
  • Ans. 

    Generally, 7-8 bags of cement are required to fill 1 cubic meter of concrete.

    • On average, 7-8 bags of cement are needed to fill 1 cubic meter of concrete.

    • The exact number of bags may vary based on the mix design and proportions used.

    • For example, if each bag of cement is 50 kg, then 7 bags would be 350 kg and 8 bags would be 400 kg.

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Rohan Builders Civil Engineer interview:
  • Building Structure
  • Building Construction
  • Site work
  • Billing
Interview preparation tips for other job seekers - This is a good company bit don't trust any one , one day this company will remove you like me
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Feb 2024. There were 3 interview rounds.

Round 1 - Aptitude Test 

Building and roads related

Round 2 - HR 

(1 Question)

  • Q1. Salary and other details
Round 3 - Technical 

(2 Questions)

  • Q1. Building and roads project related
  • Q2. Like part of building
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
-

I was interviewed in Jul 2023.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Steel estimation in a beam
  • Ans. 

    Steel estimation in a beam involves calculating the quantity of steel required for reinforcement.

    • Calculate the total length of steel bars required based on the dimensions of the beam and the spacing of the bars.

    • Determine the diameter of the steel bars to be used for reinforcement.

    • Consider the grade of steel and the design requirements to calculate the total weight of steel needed.

    • Account for wastage and additional rein...

  • Answered by AI
  • Q2. What was your role in the last job
Round 3 - One-on-one 

(2 Questions)

  • Q1. Tell me about yourself
  • Q2. Tell me about the projects you have been involved in.
Round 4 - HR 

(1 Question)

  • Q1. What is your expectation
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Mar 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(5 Questions)

  • Q1. What is most important thing in your life, is that will give you success?
  • Q2. What's your perfect field in this job?
  • Q3. How do you handle any new problems?
  • Q4. Do you have any extra qualities?
  • Q5. Why should we hire you?

Interview Preparation Tips

Topics to prepare for Aparna Constructions and Estates Civil Engineer interview:
  • Watch related YouTube content
  • Practice your knowledge
Interview preparation tips for other job seekers - 1. Don't be panic.
2. Always say anything with confidence
3. reply politely
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Referral and was interviewed in Dec 2023. There were 2 interview rounds.

Round 1 - Group Discussion 

Quality control and waste management

Round 2 - Aptitude Test 

Maths reasoning and core subjects

Interview Preparation Tips

Topics to prepare for Godrej Properties Civil Engineer interview:
  • RCC
Interview preparation tips for other job seekers - Many questions related to ambition box
Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Apr 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Any technical questions ask me
  • Q2. Difrance between OPC cement and PPC cement
  • Ans. 

    OPC cement is made from limestone and clay, while PPC cement is made from fly ash and clay.

    • OPC cement has higher strength and is used for construction of high-rise buildings and bridges.

    • PPC cement has better workability and is used for plastering and finishing works.

    • PPC cement is more eco-friendly as it uses industrial waste as a raw material.

    • OPC cement is costlier than PPC cement.

    • OPC cement is commonly used in areas w...

  • Answered by AI
  • Q3. What is two way slab
  • Ans. 

    A two way slab is a type of reinforced concrete slab that is supported by beams on all four sides.

    • Two way slab is used in buildings with large column spacing

    • It is designed to resist both positive and negative bending moments

    • It is commonly used in parking garages, commercial buildings, and residential buildings

    • Two way slab is more economical than one way slab for larger spans

  • Answered by AI
Round 3 - Assignment 

Dgijvcctuhgcvh hjjcc ghjj

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Mar 2023. There was 1 interview round.

Round 1 - One-on-one 

(3 Questions)

  • Q1. Process of water treatment plant
  • Ans. 

    Water treatment plant process involves several steps to remove impurities and make water safe for consumption.

    • Coagulation: Chemicals are added to water to make impurities clump together.

    • Sedimentation: The clumped impurities settle at the bottom of the tank.

    • Filtration: Water passes through layers of sand, gravel, and charcoal to remove remaining impurities.

    • Disinfection: Chlorine or other chemicals are added to kill bact...

  • Answered by AI
  • Q2. Bar bending schedule
  • Q3. Concrete mix design

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident

Interview Questionnaire 

1 Question

  • Q1. Minivan related questions
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via campus placement at KJ's Educational Institute Trinity Institute of Management and Research, Pune and was interviewed in Mar 2022. There were 3 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Concrete Proportion, density
Round 2 - Group Discussion 

Pre and post pendamic

Round 3 - HR 

(1 Question)

  • Q1. Ready to locate ?
  • Ans. 

    Yes, I am ready to locate and work on various civil engineering projects.

    • I am experienced in using GPS technology for site surveys and mapping.

    • I am familiar with reading and interpreting blueprints and construction plans.

    • I have knowledge of local building codes and regulations.

    • I am prepared to travel to different project sites as needed.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't take tension during interview, be confident always

Su Square Projects And Infrastructure Interview FAQs

How many rounds are there in Su Square Projects And Infrastructure Civil Engineer interview?
Su Square Projects And Infrastructure interview process usually has 1 rounds. The most common rounds in the Su Square Projects And Infrastructure interview process are Technical.
How to prepare for Su Square Projects And Infrastructure Civil Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Su Square Projects And Infrastructure. The most common topics and skills that interviewers at Su Square Projects And Infrastructure expect are Civil.
What are the top questions asked in Su Square Projects And Infrastructure Civil Engineer interview?

Some of the top questions asked at the Su Square Projects And Infrastructure Civil Engineer interview -

  1. M20 mix ratio, what is m20 mix means,what is IS code recommendation for concret...read more
  2. Water cement ratio determining test and it's res...read more
  3. Cube size used in compressive strength determining t...read more

Tell us how to improve this page.

Su Square Projects And Infrastructure Civil Engineer Reviews and Ratings

based on 2 reviews

5.0/5

Rating in categories

2.0

Skill development

4.0

Work-life balance

2.0

Salary

5.0

Job security

2.0

Company culture

2.0

Promotions

2.0

Work satisfaction

Explore 2 Reviews and Ratings
Electrical Engineer
4 salaries
unlock blur

₹1.8 L/yr - ₹2 L/yr

Civil Site Engineer
4 salaries
unlock blur

₹1.8 L/yr - ₹2.2 L/yr

Project Engineer
3 salaries
unlock blur

₹2.1 L/yr - ₹4 L/yr

Site Engineer
3 salaries
unlock blur

₹2 L/yr - ₹4.8 L/yr

Electrician
3 salaries
unlock blur

₹1.2 L/yr - ₹3.6 L/yr

Explore more salaries
Compare Su Square Projects And Infrastructure with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.2
Compare

GMR Group

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview