I applied via Approached by Company and was interviewed before Jan 2021. There was 1 interview round.
The number of tests of cement done according to IS code varies depending on the specific requirements.
The IS code for cement testing is IS 4031.
Some common tests for cement include fineness test, consistency test, setting time test, compressive strength test, and soundness test.
The number of tests conducted may also depend on the purpose of testing, such as quality control or research and development.
The specific requi...
IS 10262:2009 is the code for Concrete mix design in India.
IS 10262:2009 provides guidelines for proportioning concrete mixes.
It takes into account factors such as workability, compressive strength, and durability.
The code also includes tables and graphs to aid in mix design.
IS 10262:2009 is widely used in India for designing concrete mixes for various applications.
posted on 24 Dec 2024
I applied via Naukri.com and was interviewed in Mar 2023. There were 4 interview rounds.
QA QC related questions
I applied via Job Portal
I applied via Walk-in and was interviewed before Aug 2021. There were 2 interview rounds.
The instruments code in use in the lab refers to the unique identification numbers assigned to the equipment used for testing and analysis.
Instruments code helps in tracking and identifying specific equipment.
It ensures traceability and accountability in the lab.
Examples of instruments code include serial numbers, barcodes, or RFID tags.
posted on 9 Aug 2023
The pourstrip is a critical component for support in quality control. Its removal could lead to potential issues in product packaging and quality assurance.
Loss of structural integrity in packaging
Increased risk of contamination or tampering
Difficulty in handling and storage of products
Potential impact on product shelf life and quality
Need for alternative support measures or redesign of packaging
Concrete should be poured in pour strips after completing a certain section of formwork to prevent cracking and ensure proper curing.
Concrete should be poured in pour strips after completing a certain section of formwork to prevent cracking.
Pour strips are typically used in large concrete pours to control the placement and curing of the concrete.
The timing of pour strips will depend on the size and complexity of the pr...
Shuttering can be managed without removing supports under slab and pourstrip by using adjustable props and beams.
Use adjustable props to support the slab and pourstrip while removing the shuttering.
Install beams to transfer the load from the slab to the props, allowing the supports to be removed.
Ensure proper alignment and spacing of props and beams to distribute the load evenly.
Regularly check and adjust the props and...
Checks in concrete include slump test, air content test, temperature monitoring. At column and slab junction, check for proper reinforcement placement, formwork alignment, and concrete pouring.
Perform slump test to ensure proper consistency of concrete
Check air content to ensure proper durability and workability
Monitor temperature to prevent issues like thermal cracking
At column and slab junction, check reinforcement p...
posted on 6 Jan 2025
I applied via Company Website and was interviewed in Dec 2024. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Mar 2023. There were 4 interview rounds.
QA QC related questions
I applied via Job Portal
based on 1 review
Rating in categories
Civil Site Engineer
7
salaries
| ₹2.4 L/yr - ₹3 L/yr |
Engineer
4
salaries
| ₹2.5 L/yr - ₹3.7 L/yr |
Project Coordinator
4
salaries
| ₹8.5 L/yr - ₹9.7 L/yr |
Site Incharge
4
salaries
| ₹3.7 L/yr - ₹4.7 L/yr |
Planning Engineer
4
salaries
| ₹2.4 L/yr - ₹6 L/yr |
Lulu International Shopping Mall
Signature Global
HM Group
Sunteck Realty