Filter interviews by
I applied via Approached by Company and was interviewed before Jul 2021. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Aug 2020. There were 5 interview rounds.
Material storage method depends on the type of material and its characteristics.
Different materials require different storage methods
Some materials may require temperature-controlled storage
Materials should be stored in a way that allows for easy access and retrieval
Proper labeling and organization is important for efficient storage
Examples of storage methods include pallet racking, shelving, and bin storage
Top trending discussions
posted on 4 Nov 2021
I applied via Recruitment Consulltant and was interviewed in Oct 2022. There were 2 interview rounds.
ABC Company is a leading manufacturer of electronic components.
ABC Company specializes in producing high-quality electronic components for various industries.
The company has been in operation for over 20 years and has a strong reputation for reliability and innovation.
ABC Company's products are used in a wide range of applications, from consumer electronics to industrial machinery.
The company has a state-of-the-art pro...
I am seeking new challenges and opportunities for growth in my career.
Seeking new challenges to expand my skills and knowledge
Opportunity for career growth and advancement
Excited about the potential to make a positive impact in a new role
I have over 10 years of experience in production management, overseeing manufacturing processes and ensuring efficiency.
Managed production schedules to meet deadlines and quotas
Implemented lean manufacturing principles to improve efficiency
Trained and supervised production staff to maintain quality standards
Collaborated with cross-functional teams to optimize production processes
I have worked in the industry for 10 years.
I have 10 years of experience in production management.
I have worked in various roles within the industry, gaining valuable skills and knowledge.
I have successfully managed production processes and teams for a decade.
I have a proven track record of improving efficiency and productivity in production operations.
posted on 16 Mar 2021
I was interviewed before Mar 2020.
I applied via Naukri.com and was interviewed in Feb 2022. There was 1 interview round.
I applied via Referral
posted on 23 Dec 2021
I applied via Company Website and was interviewed in Jun 2021. There were 5 interview rounds.
The question is about the GCV of coal, SFR, and boiler efficiency.
GCV stands for Gross Calorific Value and is a measure of the heating value of coal.
SFR stands for Steam Fuel Ratio and is the ratio of steam generated to fuel consumption.
Boiler efficiency is the ratio of energy output to energy input.
Efficiency can be improved by reducing excess air, improving combustion, and using high-quality fuel.
The GCV of coal affe...
The SP consumption of air compressors and refrigeration plants refers to the specific power consumption of these machines.
SP consumption is the amount of power consumed per unit of output.
Air compressors and refrigeration plants are commonly used in industrial settings.
Efficient operation of these machines can lead to significant cost savings.
Factors that affect SP consumption include machine design, operating conditio
Cooling tower chemicals are used to prevent scaling, corrosion, and biological growth in the tower.
Chemicals are added to the water in the tower to prevent mineral buildup and corrosion.
Biocides are used to prevent the growth of bacteria and other microorganisms.
Examples of chemicals used include chlorine, bromine, and algaecides.
Regular testing and maintenance of the tower's chemical levels is necessary to ensure prop...
Handled various equipments and proficient in troubleshooting.
Handled electrical and mechanical equipments such as generators, pumps, motors, and compressors.
Troubleshot issues related to power supply, control systems, and mechanical failures.
Implemented preventive maintenance measures to ensure smooth functioning of equipments.
Trained junior engineers on equipment handling and troubleshooting techniques.
Collaborated wi...
I applied via Walk-in and was interviewed in Jul 2021. There were 5 interview rounds.
Increasing plant efficiency can be achieved through various methods.
Regular maintenance and upkeep of equipment
Optimizing production processes
Implementing energy-efficient technologies
Training and development of employees
Monitoring and analyzing data to identify areas for improvement
Man power planning is crucial for timely project completion. Here are some pointers:
Identify the tasks and their duration
Estimate the required man hours for each task
Determine the availability of existing staff
Consider hiring additional staff or outsourcing
Create a detailed project schedule with resource allocation
Regularly monitor and adjust the plan as needed
based on 4 interviews
Interview experience
based on 62 reviews
Rating in categories
Area Sales Manager
18
salaries
| ₹4.8 L/yr - ₹10 L/yr |
Area Manager
15
salaries
| ₹5.4 L/yr - ₹14.5 L/yr |
MIS Executive
7
salaries
| ₹2.8 L/yr - ₹4 L/yr |
Senior Sales Engineer
7
salaries
| ₹3.1 L/yr - ₹7.2 L/yr |
Assistant Manager
7
salaries
| ₹6.1 L/yr - ₹10 L/yr |
Ador Welding
ESAB
Lincoln Electric
Voestalpine Bohler Welding India