Upload Button Icon Add office photos

Filter interviews by

Sudarshan Chemical Industries Executive Engineer Interview Questions, Process, and Tips

Updated 23 Dec 2021

Sudarshan Chemical Industries Executive Engineer Interview Experiences

1 interview found

I applied via Company Website and was interviewed in Jun 2021. There were 5 interview rounds.

Interview Questionnaire 

6 Questions

  • Q1. 1. GCV of coal. SFR, efficiency of boiler.
  • Ans. 

    The question is about the GCV of coal, SFR, and boiler efficiency.

    • GCV stands for Gross Calorific Value and is a measure of the heating value of coal.

    • SFR stands for Steam Fuel Ratio and is the ratio of steam generated to fuel consumption.

    • Boiler efficiency is the ratio of energy output to energy input.

    • Efficiency can be improved by reducing excess air, improving combustion, and using high-quality fuel.

    • The GCV of coal affe...

  • Answered by AI
  • Q2. 2. Sp consumption of air compressors, refrigeration plants.
  • Ans. 

    The SP consumption of air compressors and refrigeration plants refers to the specific power consumption of these machines.

    • SP consumption is the amount of power consumed per unit of output.

    • Air compressors and refrigeration plants are commonly used in industrial settings.

    • Efficient operation of these machines can lead to significant cost savings.

    • Factors that affect SP consumption include machine design, operating conditio

  • Answered by AI
  • Q3. 3. Cooling tower chemicals usage.
  • Ans. 

    Cooling tower chemicals are used to prevent scaling, corrosion, and biological growth in the tower.

    • Chemicals are added to the water in the tower to prevent mineral buildup and corrosion.

    • Biocides are used to prevent the growth of bacteria and other microorganisms.

    • Examples of chemicals used include chlorine, bromine, and algaecides.

    • Regular testing and maintenance of the tower's chemical levels is necessary to ensure prop...

  • Answered by AI
  • Q4. 4. Past exp in previous company.
  • Q5. 5. Equipments handled and troubleshooting.
  • Ans. 

    Handled various equipments and proficient in troubleshooting.

    • Handled electrical and mechanical equipments such as generators, pumps, motors, and compressors.

    • Troubleshot issues related to power supply, control systems, and mechanical failures.

    • Implemented preventive maintenance measures to ensure smooth functioning of equipments.

    • Trained junior engineers on equipment handling and troubleshooting techniques.

    • Collaborated wi...

  • Answered by AI
  • Q6. Mttr, mtbf, RCA, why why analysis

Interview Preparation Tips

Interview preparation tips for other job seekers - All interview was about utilities handled and troubleshooting

Interview questions from similar companies

Senior Engineer Interview Questions & Answers

SRF user image Veeravalli Lakshmiprasad

posted on 17 Oct 2019

I applied via Naukri.com and was interviewed in Sep 2019. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. R22 production
  • Q2. HCl scrubbing,Neutralisation column
  • Q3. Distillation columns,compressors and their trouble shooting

Interview Preparation Tips

Interview preparation tips for other job seekers - On Aug 17,2019..I attended an interview for the post of Senior Production Engineer in SRF,Dahej,Gujarat.I am fortunate enough that I have got very similar process experience that what SRF is manufacturing.Being a professional chemical engineer for 7 years in Hindustan Fluorocarbons Ltd,I answered almost all the questions for what the interview panel had asked me.Infact I prepared for more Monomer plant questions but they confined to R22 plant only.Then later asked about my family background and raised concerns about my relocation to gujarat for the reason being that my wife works in Infosys,Hyderabad.My wife has the facility to work from home hence I assured them of my relocation to Gujarat if given the opportunity.But HR Divya Chauhan has put it ON HOLD for the same reason.Thanks for their wonderful hospitality and flight charges reimbursement.Definitely one day I will join in SRF and explore myself to the better challenges.

I applied via Company Website and was interviewed in Oct 2022. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Does pump have compression test? Yes
  • Ans. 

    Yes, pump has compression test.

    • Compression test is performed on pumps to check the efficiency of the pump.

    • It measures the pressure generated by the pump against a closed valve.

    • It helps in identifying any leaks or blockages in the pump.

    • Compression test is commonly performed on centrifugal pumps.

    • It is an important part of pump maintenance and troubleshooting.

  • Answered by AI
  • Q2. What is the highest power does pump flow? Between 500_ 780 watts .hp less than 1hp.
  • Ans. 

    The highest power of pump flow is less than 1 horsepower, between 500-780 watts.

    • The pump flow power ranges between 500-780 watts

    • The power is less than 1 horsepower

    • Examples of pumps with this power range include submersible pumps and centrifugal pumps

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I prefer work for the job. It is marvels and great job.
Round 1 - HR 

(3 Questions)

  • Q1. Share details of your previous job.
  • Q2. What are your strengths and weaknesses?
  • Q3. Tell me about yourself.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be urself. show confidence and technical knowledge.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(4 Questions)

  • Q1. What Is GMAW ?
  • Ans. 

    GMAW stands for Gas Metal Arc Welding, a welding process that uses a continuous solid wire electrode and shielding gas to create a weld.

    • Uses a continuous solid wire electrode

    • Requires a shielding gas to protect the weld from atmospheric contamination

    • Commonly used in industries like automotive, construction, and manufacturing

  • Answered by AI
  • Q2. What are different between MIG & MAG ?
  • Ans. 

    MIG stands for Metal Inert Gas welding, while MAG stands for Metal Active Gas welding. The main difference lies in the type of shielding gas used.

    • MIG welding uses inert gases like argon or helium to shield the weld pool from atmospheric contamination, while MAG welding uses active gases like carbon dioxide or a mixture of gases.

    • MIG welding is typically used for non-ferrous metals like aluminum, while MAG welding is mor...

  • Answered by AI
  • Q3. What is WPS Procee ?
  • Ans. 

    WPS Procee is a welding procedure specification that outlines the details of a specific welding process.

    • WPS Procee includes information such as welding materials, welding parameters, preheat and post-weld heat treatment requirements.

    • It is essential for ensuring consistency and quality in welding operations.

    • WPS Procee is often required in industries such as construction, manufacturing, and oil & gas.

    • Example: A WPS Proce...

  • Answered by AI
  • Q4. What is PQR Process ?
  • Ans. 

    PQR Process is a procedure used in welding to qualify the welding procedure specification.

    • PQR stands for Procedure Qualification Record.

    • It involves testing and documenting the variables used during the welding process.

    • The purpose is to ensure that the welding procedure will produce the desired quality of welds.

    • PQR Process is essential for ensuring the integrity and strength of welded joints.

    • Examples of variables tested...

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. Tell about yourself.
  • Ans. 

    Experienced Senior Engineer with a strong background in software development and project management.

    • Over 10 years of experience in software engineering

    • Proficient in multiple programming languages such as Java, Python, and C++

    • Led successful projects from conception to completion, resulting in increased efficiency and cost savings

    • Strong problem-solving skills and ability to work well in a team environment

  • Answered by AI
  • Q2. Why you want to switch your job .
  • Ans. 

    Seeking new challenges and opportunities for growth.

    • Looking for a new environment to learn and develop new skills.

    • Interested in working on different projects to broaden my experience.

    • Seeking a company with better career advancement opportunities.

    • Want to explore new technologies and methodologies in the industry.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep attached with naukri.com .
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I appeared for an interview before Mar 2024, where I was asked the following questions.

  • Q1. Let me go through your carrier and your achievements
  • Ans. 

    I have a diverse engineering career with significant achievements in project management and innovative solutions.

    • Led a team of engineers in the successful completion of a $10 million infrastructure project ahead of schedule.

    • Implemented a new project management software that improved team collaboration and reduced project delivery time by 20%.

    • Received the 'Engineer of the Year' award for outstanding contributions to sus...

  • Answered by AI
  • Q2. Why you want to leave your current company
  • Ans. 

    I seek new challenges and opportunities for growth that align with my career aspirations and professional development goals.

    • Desire for professional growth: I want to take on more challenging projects that can enhance my skills.

    • Alignment with career goals: My current role doesn't fully align with my long-term career aspirations in engineering management.

    • Seeking a dynamic work environment: I am looking for a company that...

  • Answered by AI
  • Q3. What is your expectation with DCM
  • Ans. 

    I expect DCM to enhance project efficiency, foster innovation, and ensure sustainable engineering practices.

    • Collaboration: I expect DCM to promote teamwork across departments, leading to innovative solutions, like integrating new technologies in projects.

    • Efficiency: I anticipate DCM will streamline processes, reducing project timelines and costs, similar to implementing agile methodologies.

    • Sustainability: I hope DCM wi...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Oct 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Basics of instrumentation, control system, field instrumentation, job role
Round 3 - Technical 

(1 Question)

  • Q1. Overall plant proceess, job role, manpower handling and budget
Round 4 - HR 

(1 Question)

  • Q1. Family background and reason for chamge
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
-

I applied via Recruitment Consulltant and was interviewed in Jul 2024. There were 4 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Online examination with 60 Technical questions in 60 minutes
Round 2 - Aptitude Test 

Online examination of 30 questions in 30 minutes

Round 3 - Case Study 

Online examination of 30 questions in 30 minutes

Round 4 - HR 

(1 Question)

  • Q1. Personal details, background, work experience, Strengths & weakness

I applied via Walk-in and was interviewed before Jan 2020. There was 1 interview round.

Interview Questionnaire 

4 Questions

  • Q1. Any vacancy ur your company supervisor, technician??
  • Q2. Can u try my interview.?
  • Q3. Any vacancy in technician, supervisor ??
  • Q4. Please I work ur company can u try.?

Interview Preparation Tips

Interview preparation tips for other job seekers - I have 6,7 year experience with maintenance job.
I me working hear technician post..
I mean Diploma electrical engineering.
So I can try new company join..
So please can u try interview in your company.

I applied via Walk-in and was interviewed before Aug 2021. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. MSDS,WORK TO PERMIT, PREVIOUS COMPANY EXPERIENCE BASE TECHNICAL,
Round 2 - HR 

(1 Question)

  • Q1. Family background, education background, salary discussion

Interview Preparation Tips

Interview preparation tips for other job seekers - MSDS, permit system, technical knowledge about previous experience.

Sudarshan Chemical Industries Interview FAQs

What are the top questions asked in Sudarshan Chemical Industries Executive Engineer interview?

Some of the top questions asked at the Sudarshan Chemical Industries Executive Engineer interview -

  1. 1. GCV of coal. SFR, efficiency of boil...read more
  2. 2. Sp consumption of air compressors, refrigeration plan...read more
  3. 5. Equipments handled and troubleshooti...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Asian Paints Interview Questions
4.0
 • 656 Interviews
Berger Paints Interview Questions
3.7
 • 266 Interviews
SRF Interview Questions
4.1
 • 181 Interviews
DCM Shriram Interview Questions
4.2
 • 89 Interviews
Atul Interview Questions
3.9
 • 87 Interviews
AkzoNobel Interview Questions
4.1
 • 64 Interviews
Tata Chemicals Interview Questions
4.1
 • 62 Interviews
View all
Sudarshan Chemical Industries Executive Engineer Salary
based on 4 salaries
₹4.9 L/yr - ₹5 L/yr
16% less than the average Executive Engineer Salary in India
View more details

Sudarshan Chemical Industries Executive Engineer Reviews and Ratings

based on 2 reviews

4.7/5

Rating in categories

4.7

Skill development

4.7

Work-life balance

3.7

Salary

4.0

Job security

4.7

Company culture

4.4

Promotions

4.0

Work satisfaction

Explore 2 Reviews and Ratings
Field Officer
160 salaries
unlock blur

₹1.5 L/yr - ₹3.2 L/yr

Senior Executive
120 salaries
unlock blur

₹3.8 L/yr - ₹12.5 L/yr

Executive
115 salaries
unlock blur

₹3 L/yr - ₹9.5 L/yr

Junior Executive
106 salaries
unlock blur

₹2.2 L/yr - ₹5.8 L/yr

Assistant Manager
67 salaries
unlock blur

₹6 L/yr - ₹16.5 L/yr

Explore more salaries
Compare Sudarshan Chemical Industries with

Asian Paints

4.0
Compare

Pidilite Industries

4.3
Compare

Berger Paints

3.7
Compare

SRF

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview