Filter interviews by
I applied via Referral and was interviewed before Nov 2023.Β There were 2 interview rounds.
Led a team of engineers in designing and testing mechanical components for various projects.
Managed a team of engineers to ensure timely completion of projects
Designed mechanical components using CAD software
Conducted testing and analysis to ensure quality and performance
Collaborated with other departments to integrate mechanical systems
Provided technical support and guidance to junior engineers
I applied via Indeed and was interviewed in Apr 2022.Β There were 3 interview rounds.
Ssnr Projects.pvt.ltd interview questions for popular designations
I applied via Approached by Company and was interviewed before Oct 2021.Β There were 2 interview rounds.
Fire fighting system is a set of equipment and procedures designed to extinguish fires.
Components of HVAC include air handling units, ductwork, fans, filters, and controls.
Fire fighting system components include fire alarms, sprinkler systems, fire extinguishers, and fire hoses.
HVAC systems are designed to regulate temperature, humidity, and air quality in buildings.
Fire fighting systems are crucial for ensuring the sa...
I applied via Company Website and was interviewed in Mar 2021.Β There was 1 interview round.
Top trending discussions
posted on 10 Feb 2025
I was interviewed in Jan 2025.
Quantitative reasoning
posted on 22 Dec 2024
The output voltage of an AAAC Rabbit conductor is typically around 600 volts.
The output voltage of an AAAC Rabbit conductor is usually around 600 volts.
The exact output voltage may vary depending on the specific application and conditions.
It is important to consult the manufacturer's specifications for accurate information.
My execution work plan involves setting clear goals, creating a timeline, assigning tasks, monitoring progress, and adjusting as needed.
Set clear goals and objectives for the project
Create a detailed timeline with milestones and deadlines
Assign tasks to team members based on their strengths and expertise
Regularly monitor progress and make adjustments as needed
Communicate effectively with team members and stakeholders
Ut...
I applied via Walk-in and was interviewed in Jul 2024.Β There was 1 interview round.
Bar bending schedule is a document that provides details of reinforcement steel bars used in construction projects.
It includes details such as bar mark, bar size, quantity, shape, and bending dimensions.
Helps in estimating the quantity of steel required for construction.
Ensures proper placement and bending of reinforcement bars as per design specifications.
Used by contractors, engineers, and construction workers for re...
28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing.
28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing
It is important for assessing the quality of concrete and its ability to support structural loads
The strength of concrete typically continues to increase beyond 28 days, but 28 days is the standard testing
Mivan is a modern construction technique using aluminum formwork, while conventional construction involves traditional methods like brick and mortar.
Mivan is faster and more efficient than conventional construction methods.
Mivan requires skilled labor for installation of aluminum formwork.
Conventional construction is more labor-intensive and time-consuming.
Mivan provides better quality finishes compared to conventional...
Self leveling concrete is a type of concrete that has a high flow consistency and is used to create smooth and level surfaces.
Self leveling concrete is designed to flow easily and settle into place without the need for troweling or leveling.
It is commonly used to level uneven floors before installing flooring materials such as tile or carpet.
Self leveling concrete can be applied in thicknesses ranging from a featheredg...
The 1st Aluform mockup concreting typically takes 1-2 days to complete.
1-2 days is the usual timeframe for 1st Aluform mockup concreting
Factors such as weather conditions, size of the mockup, and availability of resources can affect the duration
Proper planning and coordination can help expedite the process
based on 1 interview
Interview experience
based on 82 reviews
Rating in categories
Civil Site Engineer
20
salaries
| βΉ2.2 L/yr - βΉ4.8 L/yr |
Senior Engineer
12
salaries
| βΉ3.6 L/yr - βΉ6 L/yr |
Civil Engineer
11
salaries
| βΉ2.4 L/yr - βΉ5.6 L/yr |
Assistant Manager
8
salaries
| βΉ6 L/yr - βΉ9 L/yr |
Mechanical Engineer
8
salaries
| βΉ1.8 L/yr - βΉ3.6 L/yr |
Larsen & Toubro Limited
TCS
Hindustan Construction Company
GMR Group