I applied via campus placement at Kongu Engineering College, Erode and was interviewed before Oct 2022. There were 5 interview rounds.
Embankment, sub base, and subgrade are essential components of road projects for stability and durability.
Embankment is the raised structure built along the sides of a road to support the roadbed.
Sub base is the layer of material placed on top of the subgrade to provide a stable foundation for the pavement.
Subgrade is the natural ground or prepared surface on which the road is built.
Proper compaction of each layer is c...
The question is likely asking about the specifications for a 500mm 2 layer soil sample.
The 500mm measurement likely refers to the thickness of the soil sample.
The 2 layer aspect may indicate that the soil sample is composed of two distinct layers, each with its own characteristics.
Additional information such as the composition of each layer or the purpose of the soil sample may be needed to provide a more detailed answ
Proctor Compaction Test is used to find MDD & OMC in soil mechanics.
Proctor Compaction Test is commonly used in geotechnical engineering to determine the maximum dry density (MDD) and optimum moisture content (OMC) of soil.
The test involves compacting a soil sample at various moisture contents and measuring the dry density achieved.
The moisture content at which the maximum dry density is obtained is the OMC.
The MDD is ...
Minimum grade of concrete used for RCC is M20.
Minimum grade of concrete for RCC is M20
Higher grades like M25, M30, M35, etc. can also be used based on structural requirements
RCC stands for Reinforced Cement Concrete
Every one take a lesson for your past
I applied via Walk-in and was interviewed before Apr 2023. There was 1 interview round.
To know about the individuals aptitude.
To know Individuals IQ level .
To know the knowledge and conference
How the mam assess the problem
SRC PROJETS interview questions for popular designations
I applied via Newspaper Ad and was interviewed before Jul 2021. There were 2 interview rounds.
Civil engineers face challenges such as managing complex projects, ensuring safety and sustainability, and adapting to technological advancements.
Managing complex projects with multiple stakeholders and tight deadlines
Ensuring safety and sustainability in design and construction
Adapting to technological advancements and incorporating them into engineering practices
Dealing with budget constraints and optimizing cost-eff...
Top trending discussions
posted on 10 Feb 2025
I was interviewed in Jan 2025.
Quantitative reasoning
posted on 22 Dec 2024
The output voltage of an AAAC Rabbit conductor is typically around 600 volts.
The output voltage of an AAAC Rabbit conductor is usually around 600 volts.
The exact output voltage may vary depending on the specific application and conditions.
It is important to consult the manufacturer's specifications for accurate information.
My execution work plan involves setting clear goals, creating a timeline, assigning tasks, monitoring progress, and adjusting as needed.
Set clear goals and objectives for the project
Create a detailed timeline with milestones and deadlines
Assign tasks to team members based on their strengths and expertise
Regularly monitor progress and make adjustments as needed
Communicate effectively with team members and stakeholders
Ut...
I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.
Bar bending schedule is a document that provides details of reinforcement steel bars used in construction projects.
It includes details such as bar mark, bar size, quantity, shape, and bending dimensions.
Helps in estimating the quantity of steel required for construction.
Ensures proper placement and bending of reinforcement bars as per design specifications.
Used by contractors, engineers, and construction workers for re...
28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing.
28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing
It is important for assessing the quality of concrete and its ability to support structural loads
The strength of concrete typically continues to increase beyond 28 days, but 28 days is the standard testing
Mivan is a modern construction technique using aluminum formwork, while conventional construction involves traditional methods like brick and mortar.
Mivan is faster and more efficient than conventional construction methods.
Mivan requires skilled labor for installation of aluminum formwork.
Conventional construction is more labor-intensive and time-consuming.
Mivan provides better quality finishes compared to conventional...
Self leveling concrete is a type of concrete that has a high flow consistency and is used to create smooth and level surfaces.
Self leveling concrete is designed to flow easily and settle into place without the need for troweling or leveling.
It is commonly used to level uneven floors before installing flooring materials such as tile or carpet.
Self leveling concrete can be applied in thicknesses ranging from a featheredg...
The 1st Aluform mockup concreting typically takes 1-2 days to complete.
1-2 days is the usual timeframe for 1st Aluform mockup concreting
Factors such as weather conditions, size of the mockup, and availability of resources can affect the duration
Proper planning and coordination can help expedite the process
posted on 2 Aug 2024
I applied via Company Website
The company is currently in a stable financial position with ongoing projects and a strong reputation in the industry.
Company has a strong financial position
Ongoing projects are in progress
Company has a good reputation in the industry
Employee growth refers to the development and advancement of an individual within their career.
Employee growth involves acquiring new skills and knowledge
It includes taking on more responsibilities and challenges
Career progression and promotions are indicators of employee growth
Action points at site level refer to specific tasks or activities that need to be completed on the construction site.
Action points are typically identified during site inspections or progress meetings.
They can include tasks such as resolving design issues, coordinating with subcontractors, or ensuring compliance with regulations.
Examples of action points could be revising drawings to address conflicts, obtaining necess...
based on 8 interviews
Interview experience
based on 60 reviews
Rating in categories
Site Engineer
13
salaries
| â‚ą1.8 L/yr - â‚ą4.5 L/yr |
Safety Officer
10
salaries
| â‚ą2 L/yr - â‚ą4.2 L/yr |
Senior Engineer
9
salaries
| â‚ą3.6 L/yr - â‚ą6.6 L/yr |
Assistant Manager
7
salaries
| â‚ą3.5 L/yr - â‚ą7.2 L/yr |
Construction Engineer
6
salaries
| â‚ą2.4 L/yr - â‚ą3 L/yr |
L&T Construction
Tata Projects
Hindustan Construction Company
Shapoorji Pallonji Group