I applied via Recruitment Consultant and was interviewed in Apr 2020. There were 3 interview rounds.
Feed speed refers to the rate at which the cutting tool moves along the workpiece, while cutting speed refers to the speed at which the workpiece rotates or moves relative to the cutting tool.
Feed speed is measured in units of distance per time, such as inches per minute or millimeters per second.
Cutting speed is measured in units of surface speed, such as feet per minute or meters per second.
Feed speed determines how ...
Production planning is the process of organizing resources and activities to achieve production goals efficiently.
It involves determining the production schedule, allocating resources, and setting production targets.
It helps to ensure that production is carried out in a timely and cost-effective manner.
Factors such as demand, inventory levels, and capacity are taken into account during production planning.
Effective pro...
Types of engines include internal combustion engines, steam engines, and electric engines.
Internal combustion engines: Most common type, fueled by gasoline or diesel (e.g. car engines)
Steam engines: Use steam to generate power (e.g. steam locomotives)
Electric engines: Powered by electricity (e.g. electric vehicles)
The company uses a total of 5 engines for production purposes.
There are 3 engines used for manufacturing equipment
There is 1 engine used for transportation vehicles
There is 1 backup engine in case of emergencies
I applied via Naukri.com and was interviewed before May 2022. There were 2 interview rounds.
Yes, I have experience in both CNC and VMC programming.
I have worked with various CNC machines and have programmed them using G-code and M-code.
I am familiar with VMC programming and have experience in setting up tool paths and creating programs for 3-axis and 4-axis machines.
I have also worked with CAM software such as Mastercam and SolidWorks to create CNC programs.
I am comfortable with reading technical drawings and
Yes, I am familiar with machine setting.
I have experience in setting up machines for production runs.
I am knowledgeable in adjusting machine settings to optimize output and quality.
I am familiar with troubleshooting machine issues related to settings.
For example, I have set up CNC machines for precision cutting and adjusted injection molding machines for consistent product quality.
Sona Comstar interview questions for designations
I applied via Recruitment Consulltant and was interviewed before Aug 2022. There were 3 interview rounds.
Get interview-ready with Top Sona Comstar Interview Questions
I applied via Company Website and was interviewed in Apr 2021. There were 4 interview rounds.
Top trending discussions
I applied via Recruitment Consulltant and was interviewed in Nov 2024. There was 1 interview round.
The Process of ST department involves analyzing and improving production processes to increase efficiency and quality.
Analyze current production processes
Identify areas for improvement
Implement changes to increase efficiency and quality
Monitor and evaluate the impact of changes
Collaborate with other departments to optimize overall production
The temperature of a thermal oven can vary depending on the specific model and purpose.
The temperature of a thermal oven is typically adjustable and can range from around 50°C to over 300°C.
Different types of thermal ovens may have different temperature ranges based on their intended use.
For example, a drying oven may have a lower temperature range compared to a high-temperature furnace.
I applied via Recruitment Consulltant and was interviewed in Aug 2024. There were 2 interview rounds.
I want to join JTEKT because of their reputation for innovation and commitment to excellence in the production engineering field.
JTEKT has a strong reputation for innovation and cutting-edge technology in the production engineering industry.
I am impressed by JTEKT's commitment to excellence and continuous improvement in their products and processes.
I believe that working at JTEKT will provide me with valuable opportuni...
7 QC is a set of quality control tools used in manufacturing to identify and solve production problems.
7 QC stands for Seven Quality Control tools
These tools include Pareto analysis, cause-and-effect diagram, check sheet, control chart, histogram, scatter diagram, and flowchart
They are used to analyze data, identify root causes of problems, and make informed decisions for process improvement
PPL stands for Production Per Labour and PPLH stands for Production Per Labour Hour.
PPL is a measure of how much production is achieved per unit of labor input.
PPLH is a measure of how much production is achieved per labor hour.
Both metrics are used to evaluate the efficiency of production processes.
For example, if a factory produces 100 units with 10 workers, the PPL would be 10 units per worker.
If the same factory op...
The project involved designing and implementing a new production process to improve efficiency and reduce costs.
Identify areas for improvement in current production process
Research and analyze different production methods and technologies
Design and implement new production process
Test and optimize the new process for efficiency and cost-effectiveness
Overcoming is the act of successfully dealing with or overcoming a challenge, obstacle, or difficulty.
Identifying the challenge or obstacle
Developing a plan or strategy to address it
Taking action to implement the plan
Persisting through setbacks or failures
Learning from the experience to improve future outcomes
I applied via Naukri.com and was interviewed in Aug 2023. There were 2 interview rounds.
Five is a numerical value representing the quantity of five items.
Five is the third prime number.
There are five fingers on a human hand.
A pentagon has five sides.
A standard dice has five dots on one side.
Five S is a mnemonic used in the oil and gas industry to remember the key steps in drilling a well.
Safety - prioritize safety measures to prevent accidents
Survey - conduct a survey to determine the best location for drilling
Spud - begin drilling the well
Set casing - install casing to stabilize the wellbore
Squeeze - perform cement squeeze to seal off any leaks
based on 8 interviews
1 Interview rounds
based on 14 reviews
Rating in categories
Senior Engineer
159
salaries
| ₹4.4 L/yr - ₹14.5 L/yr |
Junior Engineer
148
salaries
| ₹1.5 L/yr - ₹5.3 L/yr |
Engineer
145
salaries
| ₹2.8 L/yr - ₹7.8 L/yr |
Assistant Manager
124
salaries
| ₹7.5 L/yr - ₹16.6 L/yr |
Quality Engineer
114
salaries
| ₹1.2 L/yr - ₹6 L/yr |
Bharat Forge
Samvardhana Motherson Group
Endurance Technologies
Ramkrishna Forgings