i
Sona Comstar
Filter interviews by
The company uses a total of 5 engines for production purposes.
There are 3 engines used for manufacturing equipment
There is 1 engine used for transportation vehicles
There is 1 backup engine in case of emergencies
Yes, I am familiar with machine setting.
I have experience in setting up machines for production runs.
I am knowledgeable in adjusting machine settings to optimize output and quality.
I am familiar with troubleshooting machine issues related to settings.
For example, I have set up CNC machines for precision cutting and adjusted injection molding machines for consistent product quality.
Yes, I have experience in both CNC and VMC programming.
I have worked with various CNC machines and have programmed them using G-code and M-code.
I am familiar with VMC programming and have experience in setting up tool paths and creating programs for 3-axis and 4-axis machines.
I have also worked with CAM software such as Mastercam and SolidWorks to create CNC programs.
I am comfortable with reading technical drawing...
Production planning is the process of organizing resources and activities to achieve production goals efficiently.
It involves determining the production schedule, allocating resources, and setting production targets.
It helps to ensure that production is carried out in a timely and cost-effective manner.
Factors such as demand, inventory levels, and capacity are taken into account during production planning.
Effectiv...
Feed speed refers to the rate at which the cutting tool moves along the workpiece, while cutting speed refers to the speed at which the workpiece rotates or moves relative to the cutting tool.
Feed speed is measured in units of distance per time, such as inches per minute or millimeters per second.
Cutting speed is measured in units of surface speed, such as feet per minute or meters per second.
Feed speed determines...
Types of engines include internal combustion engines, steam engines, and electric engines.
Internal combustion engines: Most common type, fueled by gasoline or diesel (e.g. car engines)
Steam engines: Use steam to generate power (e.g. steam locomotives)
Electric engines: Powered by electricity (e.g. electric vehicles)
Types of engines include internal combustion engines, steam engines, and electric engines.
Internal combustion engines: Most common type, fueled by gasoline or diesel (e.g. car engines)
Steam engines: Use steam to generate power (e.g. steam locomotives)
Electric engines: Powered by electricity (e.g. electric vehicles)
The company uses a total of 5 engines for production purposes.
There are 3 engines used for manufacturing equipment
There is 1 engine used for transportation vehicles
There is 1 backup engine in case of emergencies
I applied via Naukri.com and was interviewed before May 2022. There were 2 interview rounds.
Yes, I have experience in both CNC and VMC programming.
I have worked with various CNC machines and have programmed them using G-code and M-code.
I am familiar with VMC programming and have experience in setting up tool paths and creating programs for 3-axis and 4-axis machines.
I have also worked with CAM software such as Mastercam and SolidWorks to create CNC programs.
I am comfortable with reading technical drawings and...
Yes, I am familiar with machine setting.
I have experience in setting up machines for production runs.
I am knowledgeable in adjusting machine settings to optimize output and quality.
I am familiar with troubleshooting machine issues related to settings.
For example, I have set up CNC machines for precision cutting and adjusted injection molding machines for consistent product quality.
I applied via Recruitment Consulltant and was interviewed before Aug 2022. There were 3 interview rounds.
I applied via Company Website and was interviewed in Apr 2021. There were 4 interview rounds.
I applied via Recruitment Consultant and was interviewed in Apr 2020. There were 3 interview rounds.
Feed speed refers to the rate at which the cutting tool moves along the workpiece, while cutting speed refers to the speed at which the workpiece rotates or moves relative to the cutting tool.
Feed speed is measured in units of distance per time, such as inches per minute or millimeters per second.
Cutting speed is measured in units of surface speed, such as feet per minute or meters per second.
Feed speed determines how ...
Production planning is the process of organizing resources and activities to achieve production goals efficiently.
It involves determining the production schedule, allocating resources, and setting production targets.
It helps to ensure that production is carried out in a timely and cost-effective manner.
Factors such as demand, inventory levels, and capacity are taken into account during production planning.
Effective pro...
Top trending discussions
I appeared for an interview in Jul 2017.
I applied via Walk-in and was interviewed before Sep 2020. There was 1 interview round.
I am a production engineer with experience in optimizing manufacturing processes and ensuring efficient production.
Experienced production engineer
Skilled in optimizing manufacturing processes
Ensuring efficient production
Strong knowledge of production equipment and technologies
Proficient in analyzing data and implementing improvements
Collaborative team player
I was a Senior Production Engineer in my previous company.
I held the position of Senior Production Engineer.
I was responsible for overseeing production processes and ensuring efficiency.
I worked closely with the production team to identify and resolve any issues.
I implemented improvements to optimize production output and reduce costs.
I collaborated with other departments to coordinate production schedules and meet dea...
As a Production Engineer, my role is to oversee the manufacturing process, optimize production efficiency, and ensure quality control.
Overseeing the manufacturing process
Optimizing production efficiency
Ensuring quality control
Identifying and resolving production issues
Implementing process improvements
Collaborating with cross-functional teams
Monitoring production metrics and analyzing data
Creating and maintaining produc...
Dry film thickness refers to the thickness of a coating after it has dried and cured.
It is measured using a coating thickness gauge.
It is important to ensure that the dry film thickness meets the specifications for the coating.
The dry film thickness can affect the performance and durability of the coating.
Examples of coatings that require specific dry film thickness include paint, powder coating, and plating.
Dry film t...
Excess DFT can lead to increased cost and longer production time.
Excess DFT can lead to increased material usage and waste.
It can also lead to longer production time and increased cost.
The excess DFT may also affect the performance and durability of the product.
It is important to ensure that the DFT is within the specified range to avoid these issues.
I applied via Campus Placement and was interviewed in Oct 2021. There was 1 interview round.
based on 8 interview experiences
Difficulty level
Duration
based on 14 reviews
Rating in categories
Engineer
161
salaries
| ₹2.5 L/yr - ₹7.1 L/yr |
Senior Engineer
160
salaries
| ₹5.9 L/yr - ₹12 L/yr |
Junior Engineer
152
salaries
| ₹1.5 L/yr - ₹5.8 L/yr |
Assistant Manager
131
salaries
| ₹7.5 L/yr - ₹17 L/yr |
Quality Engineer
119
salaries
| ₹1.5 L/yr - ₹4.4 L/yr |
JBM Group
Bosch
Subros
Samvardhana Motherson Group