Filter interviews by
I applied via Walk-in and was interviewed before Mar 2021. There were 2 interview rounds.
I applied via Walk-in and was interviewed before Mar 2021. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Jan 2023. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Jul 2024. There was 1 interview round.
HVAC stands for Heating, Ventilation, and Air Conditioning. It refers to the system used to control the temperature, humidity, and air quality in a building.
HVAC systems are responsible for heating and cooling buildings to maintain a comfortable environment for occupants.
Ventilation systems help circulate and filter air to improve indoor air quality.
Air conditioning systems control the temperature and humidity levels w...
STP stands for Sewage Treatment Plant, which is a facility used to treat wastewater from residential, commercial, and industrial sources.
STP receives wastewater from various sources
Primary treatment involves physical processes to remove solids
Secondary treatment uses biological processes to further treat the wastewater
Tertiary treatment may be used to remove remaining contaminants
Treated water is discharged or reused
Ex...
To work a DG Set, ensure proper maintenance, fuel supply, and monitoring of performance.
Ensure regular maintenance checks to keep the DG Set in good working condition
Monitor fuel supply to ensure uninterrupted power generation
Keep track of performance indicators like load capacity and efficiency
Train staff on operating procedures and emergency protocols
Have a backup plan in case of power failure
The safety of a transformer is crucial for preventing accidents and ensuring reliable power distribution.
Regular maintenance and inspections are essential to ensure the safe operation of transformers.
Proper grounding and insulation are key factors in maintaining the safety of transformers.
Implementing safety protocols and training for personnel working with transformers is important to prevent accidents.
Using protectiv...
MPU stands for Main Power Unit. It is responsible for providing power to critical systems in a facility.
MPU is a key component in ensuring uninterrupted power supply to critical systems such as data centers, hospitals, and emergency response centers.
It often includes backup power sources such as generators or battery systems to ensure continuous operation in case of power outages.
Regular maintenance and testing of MPU ...
I applied via Naukri.com and was interviewed in Nov 2023. There were 3 interview rounds.
I applied via Job Fair and was interviewed in Jan 2022. There was 1 interview round.
I appeared for an interview before Sep 2016.
Seeking new challenges and growth opportunities in a dynamic environment.
Looking for new challenges and opportunities for growth
Interested in working in a more dynamic environment
Seeking a change to further develop my skills and experience
I applied via Naukri.com and was interviewed in Dec 2017. There were 4 interview rounds.
posted on 2 Apr 2021
I applied via Naukri.com and was interviewed in Dec 2020. There were 3 interview rounds.
I applied via Referral and was interviewed before Feb 2021. There was 1 interview round.
based on 1 interview
Interview experience
based on 10 reviews
Rating in categories
Facility Manager
228
salaries
| ₹4.2 L/yr - ₹13 L/yr |
Facility Executive
222
salaries
| ₹2 L/yr - ₹5.4 L/yr |
Assistant Manager
213
salaries
| ₹2.8 L/yr - ₹10.6 L/yr |
Shift Engineer
190
salaries
| ₹1.8 L/yr - ₹6 L/yr |
Assistant Facility Manager
169
salaries
| ₹3.3 L/yr - ₹8.8 L/yr |
Compass Group Support Services
Aramark
CBRE
Cushman & Wakefield