Filter interviews by
I applied via Referral and was interviewed before Aug 2020. There were 3 interview rounds.
BBS preparation is essential for ensuring the strength and stability of footings and slabs.
BBS stands for Bar Bending Schedule and involves preparing a detailed list of reinforcement bars required for the footing or slab.
The BBS takes into account the design drawings and specifications to ensure the correct size, spacing, and placement of reinforcement bars.
The BBS also helps to estimate the quantity of steel required ...
The quantity of cement and sand in 1sqm plastering depends on the thickness of the plaster.
The thickness of the plaster is a crucial factor in determining the quantity of cement and sand.
The ratio of cement to sand also affects the quantity.
For a 15mm thick plaster, the approximate quantity of cement is 16 kg and sand is 75 kg per square meter.
For a 20mm thick plaster, the approximate quantity of cement is 21 kg and sa
I applied via Naukri.com and was interviewed before Jun 2022. There were 3 interview rounds.
I appeared for an interview in Feb 2023.
Self introduction, previous experience of working.
Shear force diagram shows the variation of shear force along the length of a beam, while bending moment diagram shows the variation of bending moment.
Shear force diagram is a graph of shear force plotted against the length of the beam.
Bending moment diagram is a graph of bending moment plotted against the length of the beam.
Shear force changes sign at point of applied load or reaction, while bending moment is zero at t...
Consumption of material as per IS code refers to the quantity of material required for construction as per Indian Standards.
Consumption of material is calculated based on the specifications provided in the relevant IS code for construction.
It includes factors such as type of material, dimensions, quality standards, and wastage allowances.
For example, IS 456 for concrete specifies the mix proportions of cement, sand, an...
Seeking new challenges and opportunities for growth.
Looking for a new challenge to further develop my skills and knowledge.
Interested in exploring new opportunities for career advancement.
Seeking a company with a better cultural fit or work-life balance.
Want to work on more innovative projects or in a different industry.
Previous company downsized or restructured, leading to job loss.
I built the company to a standard level by implementing best practices, fostering a culture of continuous improvement, and ensuring alignment with industry standards.
Implemented best practices in engineering processes and project management
Fostered a culture of continuous improvement through regular training and feedback sessions
Ensured alignment with industry standards and certifications such as ISO, ASME, or API
Regul...
I applied via Naukri.com and was interviewed before Jul 2023. There was 1 interview round.
posted on 12 Jun 2021
I applied via Walk-in and was interviewed before Jun 2020. There was 1 interview round.
The sampling frequency for private density test per square meter depends on the type of test being conducted.
The sampling frequency for a private density test per square meter varies depending on the type of test being conducted.
For example, a soil density test may require a sampling frequency of one sample per 100 square meters, while a concrete density test may require a sampling frequency of one sample per 10 square...
I applied via Campus Placement and was interviewed in Jun 2021. There were 5 interview rounds.
Concrete technology is the study of the properties and behavior of concrete, including its composition, production, and application.
Concrete is a composite material made up of cement, water, aggregates, and often other additives.
It is widely used in construction for its strength, durability, and versatility.
Concrete technology involves understanding the chemical reactions and physical properties of concrete.
It includes...
My favorite subject is computer science.
I enjoy studying algorithms and data structures.
I find programming languages fascinating and love exploring their features.
I am passionate about software development and enjoy solving complex problems.
I am interested in artificial intelligence and machine learning.
I enjoy learning about computer networks and cybersecurity.
Dressing and personality
I applied via Campus Placement and was interviewed before Mar 2023. There was 1 interview round.
The structure work at the site involves the construction of a new building using steel beams and concrete columns.
Steel beams are being used for the framework of the building
Concrete columns are being installed to support the structure
The construction process includes pouring concrete, welding steel beams, and erecting walls
Managing site works involves overseeing construction activities, coordinating with contractors, ensuring safety regulations are followed, and meeting project deadlines.
Coordinate with contractors and subcontractors to ensure work is completed on time and within budget
Monitor progress of construction activities and address any issues that may arise
Ensure compliance with safety regulations and quality standards
Communicat...
I am a dedicated and experienced professional with a strong background in leadership and team management.
Over 5 years of experience in management roles
Proven track record of successfully leading teams to achieve goals
Strong communication and interpersonal skills
Ability to problem-solve and make strategic decisions
Bachelor's degree in Business Administration
I led a team in implementing a new customer relationship management system.
Managed a team of 10 employees throughout the project
Collaborated with IT department to customize CRM system to meet company's needs
Conducted training sessions for staff on how to use the new system
Acoustic refers to sound and its properties, while an ecosystem is a community of living organisms and their environment.
Acoustic refers to the study of sound waves and their behavior in different environments.
It involves understanding the properties of sound such as frequency, amplitude, and wavelength.
Acoustic engineering is used in designing concert halls, recording studios, and sound systems.
Ecosystem refers to a c...
Seeking new challenges and growth opportunities in a larger organization.
Desire for career advancement
Seeking new challenges
Opportunity for professional growth
Interest in larger organization with more resources
Looking for a change in work environment
Yes, I can handle building finishing works.
I have experience in managing building finishing works in my previous role as a Project Manager.
I am familiar with various aspects of building finishing works such as painting, flooring, and installation of fixtures.
I have successfully completed several building projects where I oversaw the finishing works.
I have a strong attention to detail and ensure that the finishing works...
My salary expectation is based on my experience, qualifications, and the responsibilities of the role.
Consider industry standards and average salaries for similar positions
Factor in cost of living in the area where the job is located
Take into account any additional benefits or perks offered by the company
Customers can check balcony slope by using a spirit level or a laser level.
Customers can use a spirit level to check the slope of their balcony. They place the level on the balcony floor and ensure the bubble is centered between the two lines.
Alternatively, customers can use a laser level to check the slope. They position the laser level at one end of the balcony and measure the height difference between the laser beam...
Customers typically check various aspects during possession of a product or service.
Quality and condition of the product or service
Accuracy of the order or specifications
Functionality and performance
Packaging and presentation
Documentation and instructions
Warranty or guarantee
Any additional features or accessories
Value for money
Check points for snagging are specific areas or aspects that need to be inspected and rectified before finalizing a project.
Inspecting the quality of materials used
Checking for any defects or damages
Ensuring proper installation and functioning of equipment
Verifying compliance with safety regulations
Addressing any outstanding issues or discrepancies
Documenting and reporting findings
Conducting final walkthroughs to ensur
The formalities to be made with customers include greeting, understanding their needs, providing assistance, resolving issues, and maintaining good communication.
Greet customers with a warm and friendly attitude
Listen attentively to their needs and requirements
Offer assistance and provide relevant information
Resolve any issues or complaints promptly and effectively
Maintain good communication throughout the interaction
T...
I applied via Referral and was interviewed in May 2023. There were 4 interview rounds.
based on 13 reviews
Rating in categories
Senior Engineer
505
salaries
| ₹2.8 L/yr - ₹6.5 L/yr |
Project Engineer
459
salaries
| ₹3.2 L/yr - ₹8 L/yr |
Assistant Manager
327
salaries
| ₹4 L/yr - ₹10.5 L/yr |
Deputy Manager
207
salaries
| ₹5 L/yr - ₹11 L/yr |
Senior Executive
201
salaries
| ₹2.5 L/yr - ₹6.5 L/yr |
Godrej Properties
DLF
Surya Roshni
Emaar India Limited