  • Q1. Basic quantity calculation skills
  • Q2. BBS preparation of footing or slab
  • Ans. 

    BBS preparation is essential for ensuring the strength and stability of footings and slabs.

    • BBS stands for Bar Bending Schedule and involves preparing a detailed list of reinforcement bars required for the footing or slab.

    • The BBS takes into account the design drawings and specifications to ensure the correct size, spacing, and placement of reinforcement bars.

    • The BBS also helps to estimate the quantity of steel required ...

  • Answered by AI
  • Q3. Qty of Cement and sand in 1sqm plastering
  • Ans. 

    The quantity of cement and sand in 1sqm plastering depends on the thickness of the plaster.

    • The thickness of the plaster is a crucial factor in determining the quantity of cement and sand.

    • The ratio of cement to sand also affects the quantity.

    • For a 15mm thick plaster, the approximate quantity of cement is 16 kg and sand is 75 kg per square meter.

    • For a 20mm thick plaster, the approximate quantity of cement is 21 kg and sa

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic questions about quantity surveyor

Quantity Surveyor Jobs at Sobha

View all

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jun 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Structure related questions, Finishing work, Basic knowledge of Fire and Plumbing work, Quality codes, Glazing work, ETC..
Round 3 - HR 

(1 Question)

  • Q1. Pay rolls and offer letter

Interview Preparation Tips

Interview preparation tips for other job seekers - Need to be confidence with your answer and have Site work knowledge.
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I appeared for an interview in Feb 2023.

Round 1 - Aptitude Test 

Self introduction, previous experience of working.

Round 2 - One-on-one 

(2 Questions)

  • Q1. Shear force diagram and bending moment diagram.
  • Ans. 

    Shear force diagram shows the variation of shear force along the length of a beam, while bending moment diagram shows the variation of bending moment.

    • Shear force diagram is a graph of shear force plotted against the length of the beam.

    • Bending moment diagram is a graph of bending moment plotted against the length of the beam.

    • Shear force changes sign at point of applied load or reaction, while bending moment is zero at t...

  • Answered by AI
  • Q2. Consumption of material as per IS code.
  • Ans. 

    Consumption of material as per IS code refers to the quantity of material required for construction as per Indian Standards.

    • Consumption of material is calculated based on the specifications provided in the relevant IS code for construction.

    • It includes factors such as type of material, dimensions, quality standards, and wastage allowances.

    • For example, IS 456 for concrete specifies the mix proportions of cement, sand, an...

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. Why are you leaving from previous company?
  • Ans. 

    Seeking new challenges and opportunities for growth.

    • Looking for a new challenge to further develop my skills and knowledge.

    • Interested in exploring new opportunities for career advancement.

    • Seeking a company with a better cultural fit or work-life balance.

    • Want to work on more innovative projects or in a different industry.

    • Previous company downsized or restructured, leading to job loss.

  • Answered by AI
  • Q2. How you built our company as standard level.
  • Ans. 

    I built the company to a standard level by implementing best practices, fostering a culture of continuous improvement, and ensuring alignment with industry standards.

    • Implemented best practices in engineering processes and project management

    • Fostered a culture of continuous improvement through regular training and feedback sessions

    • Ensured alignment with industry standards and certifications such as ISO, ASME, or API

    • Regul...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jul 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Start to handover process in a Project

Interview Preparation Tips

Interview preparation tips for other job seekers - Just be well prepared in terms of all types of processes and sequences in construction. Situation based problem solving abilities and good communication skills.

I applied via Walk-in and was interviewed before Jun 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. What the sampling frequency for private density test in per square meter?
  • Ans. 

    The sampling frequency for private density test per square meter depends on the type of test being conducted.

    • The sampling frequency for a private density test per square meter varies depending on the type of test being conducted.

    • For example, a soil density test may require a sampling frequency of one sample per 100 square meters, while a concrete density test may require a sampling frequency of one sample per 10 square...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Alu-from

I applied via Campus Placement and was interviewed in Jun 2021. There were 5 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Tell me about concrete technology?
  • Ans. 

    Concrete technology is the study of the properties and behavior of concrete, including its composition, production, and application.

    • Concrete is a composite material made up of cement, water, aggregates, and often other additives.

    • It is widely used in construction for its strength, durability, and versatility.

    • Concrete technology involves understanding the chemical reactions and physical properties of concrete.

    • It includes...

  • Answered by AI
  • Q2. Tell me about yourself?
  • Q3. So I was very scared I somehow gave an introduction in English and then they ask me another question
  • Q4. Your favourite subject
  • Ans. 

    My favorite subject is computer science.

    • I enjoy studying algorithms and data structures.

    • I find programming languages fascinating and love exploring their features.

    • I am passionate about software development and enjoy solving complex problems.

    • I am interested in artificial intelligence and machine learning.

    • I enjoy learning about computer networks and cybersecurity.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Then I said a lot I got very positive about what I answer then they ask my family background I said my parents occupation is farmers and I am come from financially poor family and then they got very emotional because my situation was like being emotional they are finally told me that you you are very smart don't give up such preserver as honesty and effort never give up and six days after the interview I got a call from their HR and they ask for family information and immediately my result come on on college email in my class attend interview Six student and me and one girl passed in the interview my parents and I were very happy I got the directly position of senior Executive Engineer in Godrej company
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

Dressing and personality

Round 2 - Technical 

(1 Question)

  • Q1. Site questions and finishing work

Senior Engineer Interview Questions & Answers

DLF user image MRITUNJAY KUMAR

posted on 15 Mar 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Mar 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Structure work going on at site
  • Ans. 

    The structure work at the site involves the construction of a new building using steel beams and concrete columns.

    • Steel beams are being used for the framework of the building

    • Concrete columns are being installed to support the structure

    • The construction process includes pouring concrete, welding steel beams, and erecting walls

  • Answered by AI
  • Q2. Survey related questions
  • Q3. Planning related
  • Q4. About Relocation nearby site
  • Q5. Manage site works
  • Ans. 

    Managing site works involves overseeing construction activities, coordinating with contractors, ensuring safety regulations are followed, and meeting project deadlines.

    • Coordinate with contractors and subcontractors to ensure work is completed on time and within budget

    • Monitor progress of construction activities and address any issues that may arise

    • Ensure compliance with safety regulations and quality standards

    • Communicat...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be ready with your portfolio,and manage

Interview Questionnaire 

10 Questions

  • Q1. Tell about yourself
  • Ans. 

    I am a dedicated and experienced professional with a strong background in leadership and team management.

    • Over 5 years of experience in management roles

    • Proven track record of successfully leading teams to achieve goals

    • Strong communication and interpersonal skills

    • Ability to problem-solve and make strategic decisions

    • Bachelor's degree in Business Administration

  • Answered by AI
  • Q2. Your last projects
  • Ans. 

    I led a team in implementing a new customer relationship management system.

    • Managed a team of 10 employees throughout the project

    • Collaborated with IT department to customize CRM system to meet company's needs

    • Conducted training sessions for staff on how to use the new system

  • Answered by AI
  • Q3. Tell us something about Acoustic and eco system
  • Ans. 

    Acoustic refers to sound and its properties, while an ecosystem is a community of living organisms and their environment.

    • Acoustic refers to the study of sound waves and their behavior in different environments.

    • It involves understanding the properties of sound such as frequency, amplitude, and wavelength.

    • Acoustic engineering is used in designing concert halls, recording studios, and sound systems.

    • Ecosystem refers to a c...

  • Answered by AI
  • Q4. Why do you want to change job ?
  • Ans. 

    Seeking new challenges and growth opportunities in a larger organization.

    • Desire for career advancement

    • Seeking new challenges

    • Opportunity for professional growth

    • Interest in larger organization with more resources

    • Looking for a change in work environment

  • Answered by AI
  • Q5. Can you handle building finishing works ?
  • Ans. 

    Yes, I can handle building finishing works.

    • I have experience in managing building finishing works in my previous role as a Project Manager.

    • I am familiar with various aspects of building finishing works such as painting, flooring, and installation of fixtures.

    • I have successfully completed several building projects where I oversaw the finishing works.

    • I have a strong attention to detail and ensure that the finishing works...

  • Answered by AI
  • Q6. What is your salary expectation?
  • Ans. 

    My salary expectation is based on my experience, qualifications, and the responsibilities of the role.

    • Consider industry standards and average salaries for similar positions

    • Factor in cost of living in the area where the job is located

    • Take into account any additional benefits or perks offered by the company

  • Answered by AI
  • Q7. How do costumers check balcony slope ?
  • Ans. 

    Customers can check balcony slope by using a spirit level or a laser level.

    • Customers can use a spirit level to check the slope of their balcony. They place the level on the balcony floor and ensure the bubble is centered between the two lines.

    • Alternatively, customers can use a laser level to check the slope. They position the laser level at one end of the balcony and measure the height difference between the laser beam...

  • Answered by AI
  • Q8. What costumers check during possession?
  • Ans. 

    Customers typically check various aspects during possession of a product or service.

    • Quality and condition of the product or service

    • Accuracy of the order or specifications

    • Functionality and performance

    • Packaging and presentation

    • Documentation and instructions

    • Warranty or guarantee

    • Any additional features or accessories

    • Value for money

  • Answered by AI
  • Q9. What are check points for snagging ?
  • Ans. 

    Check points for snagging are specific areas or aspects that need to be inspected and rectified before finalizing a project.

    • Inspecting the quality of materials used

    • Checking for any defects or damages

    • Ensuring proper installation and functioning of equipment

    • Verifying compliance with safety regulations

    • Addressing any outstanding issues or discrepancies

    • Documenting and reporting findings

    • Conducting final walkthroughs to ensur

  • Answered by AI
  • Q10. What are the formalities to made with costumers?
  • Ans. 

    The formalities to be made with customers include greeting, understanding their needs, providing assistance, resolving issues, and maintaining good communication.

    • Greet customers with a warm and friendly attitude

    • Listen attentively to their needs and requirements

    • Offer assistance and provide relevant information

    • Resolve any issues or complaints promptly and effectively

    • Maintain good communication throughout the interaction

    • T...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Referral and was interviewed in May 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Technical round
  • Q2. Regarding position u applied
  • Q3. Technical round about civil
Round 3 - One-on-one 

(2 Questions)

  • Q1. CEO interview with technical
  • Q2. Technical along with experience
Round 4 - HR 

(2 Questions)

  • Q1. HR for salary negotiation
  • Q2. Previous experience and salary

Sobha Interview FAQs

How to prepare for Sobha Quantity Surveyor interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Sobha. The most common topics and skills that interviewers at Sobha expect are Quantity Surveying, Rate Analysis, Quantity Surveyor Activities, Client Billing and Quantity Estimation.
What are the top questions asked in Sobha Quantity Surveyor interview?

Some of the top questions asked at the Sobha Quantity Surveyor interview -

  1. Qty of Cement and sand in 1sqm plasteri...read more
  2. BBS preparation of footing or s...read more
  3. Basic quantity calculation ski...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

DLF Interview Questions
4.0
 • 77 Interviews
Brigade Group Interview Questions
4.1
 • 33 Interviews
Ashiana Housing Interview Questions
4.0
 • 29 Interviews
Puravankara Interview Questions
3.7
 • 20 Interviews
Gaurs Group Interview Questions
4.0
 • 19 Interviews
View all
Sobha Quantity Surveyor Salary
based on 51 salaries
₹3 L/yr - ₹5 L/yr
33% less than the average Quantity Surveyor Salary in India
View more details

Sobha Quantity Surveyor Reviews and Ratings

based on 13 reviews

4.2/5

Rating in categories

4.0

Skill development

3.6

Work-life balance

3.0

Salary

4.5

Job security

4.0

Company culture

3.8

Promotions

4.2

Work satisfaction

Explore 13 Reviews and Ratings
Quantity Surveyor/QAD

Gurgaon / Gurugram,

Bangalore / Bengaluru

2-5 Yrs

Not Disclosed

Explore more jobs
Senior Engineer
505 salaries
unlock blur

₹2.8 L/yr - ₹6.5 L/yr

Project Engineer
459 salaries
unlock blur

₹3.2 L/yr - ₹8 L/yr

Assistant Manager
327 salaries
unlock blur

₹4 L/yr - ₹10.5 L/yr

Deputy Manager
207 salaries
unlock blur

₹5 L/yr - ₹11 L/yr

Senior Executive
201 salaries
unlock blur

₹2.5 L/yr - ₹6.5 L/yr

Explore more salaries
Compare Sobha with

Godrej Properties

3.7
Compare

DLF

3.9
Compare

Surya Roshni

4.1
Compare

Emaar India Limited

3.6
Compare
Did you find this page helpful?
Yes No
write
Share an Interview