Upload Button Icon Add office photos

Filter interviews by

Sobha Engineering Contracting Deputy General Manager Project Interview Questions and Answers

Updated 11 Sep 2023

Sobha Engineering Contracting Deputy General Manager Project Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Sep 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Initial & Final setting time of concrete ?
  • Ans. 

    Initial setting time is the time when the concrete starts to harden, while final setting time is when it is completely hardened.

    • Initial setting time typically ranges from 30 minutes to 1.5 hours.

    • Final setting time is usually around 6 to 10 hours.

    • Factors affecting setting time include temperature, cement type, water-cement ratio, and admixtures.

    • Example: A rapid-setting concrete may have an initial setting time of 5 minu

  • Answered by AI
  • Q2. Specific gravity of coarse aggregateusing for concrete ?
  • Ans. 

    Specific gravity of coarse aggregate is typically between 2.6 to 2.9.

    • Specific gravity is the ratio of the weight of a given volume of aggregate to the weight of an equal volume of water.

    • It is an important parameter in concrete mix design as it helps in determining the weight of aggregate required for a given volume of concrete.

    • The specific gravity of coarse aggregate used in concrete typically ranges from 2.6 to 2.9.

    • Hi...

  • Answered by AI
  • Q3. Consumption of bricks per cubic menter of masonry wall ?
  • Ans. 

    The consumption of bricks per cubic meter of masonry wall varies depending on the type of bricks and the thickness of the wall.

    • The consumption of bricks for a solid brick wall will be different from a cavity wall.

    • The size and type of bricks used will also impact the consumption rate.

    • Generally, for solid brick walls, the consumption can range from 500 to 700 bricks per cubic meter.

    • For cavity walls, the consumption can b...

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. What was the CTC expected ?

Interview Preparation Tips

Interview preparation tips for other job seekers - Just be technical and be confident in what you have learnt so far. Try to learn all micro level subject related to the work assigned with help of Sobha Technical manual and IS code of practise.

Interview questions from similar companies

I applied via Naukri.com and was interviewed in Jun 2021. There were 5 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. What is your achievement in past employer
  • Ans. 

    Successfully completed a major infrastructure project ahead of schedule and under budget.

    • Led a team of 50 engineers and technicians to complete a construction project worth $100 million.

    • Implemented efficient project management strategies resulting in a 20% reduction in project timeline.

    • Managed project budget effectively, saving $5 million through cost optimization.

    • Received recognition from the employer for outstanding ...

  • Answered by AI
  • Q2. Why you searching jobs after 18 years
  • Ans. 

    I am searching for new job opportunities after 18 years to further enhance my skills and contribute to a new organization.

    • Seeking new challenges and growth opportunities

    • Want to broaden my professional network

    • Looking for a fresh environment to apply my expertise

    • Desire to make a greater impact in a different organization

    • Exploring new industries or sectors

    • Seeking better work-life balance or location

    • Adapting to changes in

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was merely a technical one about my past achievements and interviewer want to check my knowledge
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(4 Questions)

  • Q1. Brief description of self
  • Q2. Why do you want to leave the present company
  • Q3. What motivates you to join our company
  • Ans. 

    I am motivated to join your company because of its strong reputation in the industry, opportunities for growth and development, and the chance to work on challenging projects.

    • Strong reputation in the industry

    • Opportunities for growth and development

    • Challenging projects

  • Answered by AI
  • Q4. What way you can contribute to our company
Round 2 - One-on-one 

(2 Questions)

  • Q1. Your previous company is a TATA Company, then why do you want to leave that and join L&T Construction?
  • Ans. 

    I am looking for new challenges and opportunities for growth in a different company like L&T Construction.

    • Seeking new challenges and opportunities for growth

    • Interested in the projects and work culture at L&T Construction

    • Want to broaden my skill set and experience by working in a different environment

  • Answered by AI
  • Q2. How to manage local problems like local administration, political interference, permissions in a project which is inside a municipal corporation area
  • Ans. 

    Local problems like administration, political interference, permissions in a project within a municipal corporation area can be managed through effective communication and collaboration.

    • Establish strong relationships with local administration officials and politicians to address any issues that may arise

    • Clearly communicate the project's goals and benefits to gain support from local stakeholders

    • Ensure all necessary perm...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Nov 2024. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. What is your current profile
  • Ans. 

    I am currently working as a Senior Operations Manager at a multinational company.

    • Responsible for overseeing daily operations and ensuring efficiency

    • Leading a team of managers and supervisors

    • Implementing strategies to improve productivity and reduce costs

    • Collaborating with other departments to achieve company goals

  • Answered by AI
  • Q2. What is your expectations
  • Ans. 

    I expect to lead a team to success by setting clear goals, providing support, and fostering a positive work environment.

    • Setting clear goals and expectations for the team

    • Providing support and resources to help team members succeed

    • Fostering a positive work environment through open communication and collaboration

    • Ensuring efficient operations and achieving business objectives

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Discuss about only profile
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Mar 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Technical and managerial
  • Q2. Management related question
Round 3 - HR 

(2 Questions)

  • Q1. Regarding team management
  • Q2. How to manage team
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Apr 2023. There was 1 interview round.

Round 1 - One-on-one 

(5 Questions)

  • Q1. Based on experience
  • Q2. How could you achieve your coal
  • Q3. How will you face your problem
  • Q4. In time completion of project
  • Q5. Economical and quality work

I applied via Recruitment Consultant and was interviewed in Nov 2021. There were 5 interview rounds.

Interview Questionnaire 

12 Questions

  • Q1. Role and responsibilities ?
  • Ans. 

    The General Manager is responsible for overseeing all aspects of a company's operations and ensuring its success.

    • Developing and implementing business strategies and plans

    • Managing and leading a team of employees

    • Monitoring and analyzing financial performance

    • Building and maintaining relationships with clients and stakeholders

    • Ensuring compliance with regulations and company policies

    • Making key decisions and solving problems

    • ...

  • Answered by AI
  • Q2. Tell me about yourself?
  • Ans. 

    Experienced General Manager with a proven track record in leading teams and driving business growth.

    • Over 10 years of experience in management roles

    • Successfully managed teams of up to 50 employees

    • Implemented strategies that resulted in a 20% increase in revenue

    • Strong leadership and communication skills

    • Proven ability to analyze data and make informed decisions

    • Passionate about driving customer satisfaction and delivering

  • Answered by AI
  • Q3. Why do you want leave previous company?
  • Ans. 

    I wanted to leave my previous company because I was seeking new challenges and opportunities for growth.

    • Seeking new challenges and opportunities for growth

    • Looking for a company with a better cultural fit

    • Desire for a change in industry or sector

    • Relocation or personal reasons

    • Lack of career advancement or development opportunities

    • Company downsizing or restructuring

  • Answered by AI
  • Q4. What is your strength ??
  • Ans. 

    My strength is my ability to effectively lead and motivate teams to achieve goals.

    • Strong leadership skills

    • Excellent communication and interpersonal skills

    • Ability to motivate and inspire team members

    • Strategic thinking and problem-solving abilities

    • Experience in successfully managing teams and achieving targets

    • Proven track record of driving growth and improving performance

    • Adaptability and flexibility in a dynamic work env

  • Answered by AI
  • Q5. What is your weak point ??
  • Ans. 

    My weak point is that I can sometimes be too detail-oriented, which can slow down decision-making processes.

    • I tend to focus on every small detail, which can sometimes cause delays in making decisions.

    • I am aware of this weakness and have been working on finding a balance between attention to detail and efficiency.

    • For example, in my previous role as a General Manager, I would often spend too much time analyzing data befo...

  • Answered by AI
  • Q6. Whome I report ?
  • Q7. How can you react if staff not getting proper target ??
  • Ans. 

    As a General Manager, I would react to staff not meeting targets by implementing a proactive approach to identify and address the underlying issues.

    • Analyze the reasons behind the staff not meeting targets

    • Identify any gaps in training or resources

    • Provide additional support and guidance to the staff

    • Set realistic and achievable targets

    • Implement performance improvement plans if necessary

    • Motivate and incentivize the staff t...

  • Answered by AI
  • Q8. How many staffs working uner me ??
  • Q9. Are you ready to relocate south ?
  • Ans. 

    Yes, I am ready to relocate south.

    • I am open to new opportunities and experiences in a different location.

    • I have researched and familiarized myself with the south and its culture.

    • I am willing to adapt and integrate into a new community.

    • I understand the potential challenges of relocating but I am prepared to overcome them.

    • I have discussed the relocation with my family and they are supportive.

  • Answered by AI
  • Q10. What is PERT & CPM??
  • Ans. 

    PERT (Program Evaluation and Review Technique) and CPM (Critical Path Method) are project management techniques used to plan, schedule, and control complex projects.

    • PERT is a probabilistic technique that uses three time estimates (optimistic, pessimistic, and most likely) to calculate the expected time for each activity.

    • CPM is a deterministic technique that uses a single time estimate for each activity to calculate the...

  • Answered by AI
  • Q11. What is your notice period ?
  • Ans. 

    My notice period is 3 months.

    • My notice period is 3 months.

    • I am required to give a 3-month notice before leaving my current position.

    • I have a contractual obligation to provide a 3-month notice period.

  • Answered by AI
  • Q12. What is your salary expectation?
  • Ans. 

    I would expect a salary commensurate with my experience, skills, and the responsibilities of the General Manager role.

    • Consider the industry standards and market rates for General Managers.

    • Highlight your relevant experience and achievements that justify a higher salary.

    • Discuss any additional responsibilities or challenges you are willing to take on.

    • Be open to negotiation and emphasize your value to the company.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Always be positive during interview and do not hesitate to answer .
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Mar 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(4 Questions)

  • Q1. Regarding work experience
  • Q2. How will you maintain procurement and stores inventory
  • Ans. 

    I will implement a system for regular inventory checks and establish relationships with reliable suppliers.

    • Regular inventory checks will be conducted to ensure accurate stock levels.

    • A system for tracking inventory movement will be implemented.

    • Relationships with reliable suppliers will be established to ensure timely and cost-effective procurement.

    • Obsolete or expired inventory will be disposed of properly.

    • Efficient comm...

  • Answered by AI
  • Q3. How will you manage manage manpower in inventory management
  • Ans. 

    I will ensure proper staffing levels, training, and scheduling to optimize productivity and minimize labor costs.

    • Analyze inventory management needs and determine appropriate staffing levels

    • Provide training and development opportunities to improve employee skills and knowledge

    • Create and maintain a schedule that ensures adequate coverage while minimizing overtime and labor costs

    • Monitor employee performance and provide fe...

  • Answered by AI
  • Q4. Procurement planing with maintenance team

Interview Preparation Tips

Topics to prepare for Dilip Buildcon Assistant General Manager interview:
  • Supply Chain Management
Interview preparation tips for other job seekers - You never get a second chance to make a first impression.

I applied via Referral and was interviewed in Aug 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Detailed technical related questions.
  • Q2. Indepth knowledge is required.

Interview Preparation Tips

Interview preparation tips for other job seekers - Have through knowledge about the subject and the jd.

I applied via Approached by company and was interviewed before Jan 2021. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Safety management, best practices
  • Q2. Achievements during wprking in previous organisation
Round 3 - Group Discussion 

Safety Digitization, Safety Leadrship

Round 4 - HR 

(1 Question)

  • Q1. Why are you looking for a change?

Interview Preparation Tips

Interview preparation tips for other job seekers - Be Honest, Confident, Polite and Humble

Sobha Engineering Contracting Interview FAQs

How many rounds are there in Sobha Engineering Contracting Deputy General Manager Project interview?
Sobha Engineering Contracting interview process usually has 3 rounds. The most common rounds in the Sobha Engineering Contracting interview process are Resume Shortlist, Technical and HR.
What are the top questions asked in Sobha Engineering Contracting Deputy General Manager Project interview?

Some of the top questions asked at the Sobha Engineering Contracting Deputy General Manager Project interview -

  1. Specific gravity of coarse aggregateusing for concret...read more
  2. Consumption of bricks per cubic menter of masonry wal...read more
  3. Initial & Final setting time of concret...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 686 Interviews
Tata Projects Interview Questions
4.3
 • 397 Interviews
KEC International Interview Questions
4.1
 • 286 Interviews
Tata Technologies Interview Questions
3.7
 • 246 Interviews
TCE Interview Questions
3.8
 • 237 Interviews
View all

Sobha Engineering Contracting Deputy General Manager Project Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

5.0

Skill development

4.0

Work-Life balance

5.0

Salary & Benefits

5.0

Job Security

5.0

Company culture

4.0

Promotions/Appraisal

5.0

Work Satisfaction

Explore 1 Review and Rating
Senior Engineer
10 salaries
unlock blur

₹3.6 L/yr - ₹4.5 L/yr

Assistant Manager
6 salaries
unlock blur

₹5.8 L/yr - ₹10.2 L/yr

Planning Engineer
5 salaries
unlock blur

₹4.1 L/yr - ₹30 L/yr

Quantity Surveyor
4 salaries
unlock blur

₹3.1 L/yr - ₹20 L/yr

Safety Officer
4 salaries
unlock blur

₹3.2 L/yr - ₹6.1 L/yr

Explore more salaries
Compare Sobha Engineering Contracting with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.3
Compare

Shapoorji Pallonji Group

4.2
Compare

Punj Lloyd

4.3
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview