Filter interviews by
I applied via Company Website and was interviewed before Mar 2022. There were 2 interview rounds.
I will implement a system for regular inventory checks and establish relationships with reliable suppliers.
Regular inventory checks will be conducted to ensure accurate stock levels.
A system for tracking inventory movement will be implemented.
Relationships with reliable suppliers will be established to ensure timely and cost-effective procurement.
Obsolete or expired inventory will be disposed of properly.
Efficient comm...
I will ensure proper staffing levels, training, and scheduling to optimize productivity and minimize labor costs.
Analyze inventory management needs and determine appropriate staffing levels
Provide training and development opportunities to improve employee skills and knowledge
Create and maintain a schedule that ensures adequate coverage while minimizing overtime and labor costs
Monitor employee performance and provide fe...
I applied via Recruitment Consulltant and was interviewed before Jun 2021. There was 1 interview round.
Schedules are time-based plans while articles are written pieces of information.
Schedules are time-based plans that outline when certain tasks or events will occur.
Articles are written pieces of information that provide details on a particular topic.
Schedules are often used in project management to ensure tasks are completed on time.
Articles are commonly found in newspapers, magazines, and online publications.
Schedules...
Top trending discussions
posted on 22 Apr 2022
I applied via Walk-in and was interviewed before Apr 2021. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Jan 2021. There were 4 interview rounds.
Yes, I have experience in handling RVNL projects.
I have previously managed a similar railway project
I am familiar with the processes and regulations involved
I have a strong team to support me
I am confident in my ability to deliver the project on time and within budget
posted on 16 May 2021
I applied via Naukri.com and was interviewed before May 2020. There were 3 interview rounds.
I can join within two weeks.
I am currently serving a two-week notice period at my current job.
I have already completed all necessary paperwork and background checks.
I am ready to start as soon as possible.
I can adjust my start date based on the company's requirements.
I left my last company to pursue new opportunities and challenges.
Seeking growth and advancement in my career
Looking for a company with a better cultural fit
Wanting to broaden my skill set
Desire for a higher level of responsibility
Company downsizing or restructuring
posted on 18 Jan 2020
I applied via Naukri.com and was interviewed in Jul 2019. There were 3 interview rounds.
Maintain elevation of underground piping by using level instruments and proper installation techniques.
Use a level instrument to check the elevation of the piping during installation.
Ensure that the piping is installed with a consistent slope to prevent low spots where water can accumulate.
Regularly inspect the piping to ensure that it has not shifted or settled, which can affect the elevation.
Consider using supports o...
In my previous role as Assistant Manager, I was responsible for overseeing daily operations, managing staff, and ensuring customer satisfaction.
Managed a team of employees and delegated tasks effectively
Handled customer complaints and resolved issues in a timely manner
Created and implemented strategies to improve efficiency and productivity
Collaborated with other departments to achieve company goals
Conducted performanc
Welding electrodes are chosen based on the material being welded. Different materials require different types of electrodes.
Electrodes for mild steel have a coating that produces a stable arc and minimal spatter.
Stainless steel electrodes have a coating that resists corrosion and produces a smooth, clean weld.
Cast iron electrodes have a high nickel content to prevent cracking.
Aluminum electrodes have a special coating ...
posted on 14 Feb 2021
posted on 18 Oct 2021
I applied via Referral and was interviewed before Oct 2020. There were 3 interview rounds.
posted on 2 May 2021
based on 1 interview
Interview experience
based on 7 reviews
Rating in categories
Assistant Manager
210
salaries
| ₹4 L/yr - ₹12.1 L/yr |
Senior Engineer
210
salaries
| ₹4 L/yr - ₹10.9 L/yr |
Asst Store
202
salaries
| ₹1.6 L/yr - ₹4 L/yr |
Store Executive
190
salaries
| ₹1.5 L/yr - ₹5 L/yr |
Structural Engineer
179
salaries
| ₹2 L/yr - ₹6.7 L/yr |
Larsen & Toubro Limited
L&T Construction
Tata Projects
Megha Engineering & Infrastructures