Upload Button Icon Add office photos

Filter interviews by

Smith Structures Interview Questions, Process, and Tips

Updated 7 Jan 2025

Top Smith Structures Interview Questions and Answers

View all 14 questions

Smith Structures Interview Experiences

Popular Designations

7 interviews found

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jul 2024. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. How to prepare a schedule for building completions.
  • Q2. What is erection procedur?
Round 2 - Technical 

(2 Questions)

  • Q1. Where to start erection?
  • Q2. How to prepare a schedule?
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Diesel engine stock
  • Q2. 1 MW = KVA

Maintenance Manager Interview Questions asked at other Companies

Q1. Suddenly how to take design when there is no one senior are present in his/her office that time, what you to do?
View answer (16)

Project Engineer Interview Questions & Answers

user image Raghwesh Yadav

posted on 22 Jun 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Jun 2023. There was 1 interview round.

Round 1 - Technical 

(9 Questions)

  • Q1. Tell me about yourself
  • Q2. What do you know about anchor bolt and how is it casted?
  • Ans. 

    Anchor bolts are used to secure objects or structures to concrete. They are typically casted by drilling a hole in the concrete and inserting the bolt with epoxy or grout.

    • Anchor bolts are commonly used in construction to secure structures like columns, beams, and equipment to concrete foundations.

    • The process of casting anchor bolts involves drilling a hole in the concrete, inserting the bolt, and then filling the hole ...

  • Answered by AI
  • Q3. How to do alignment of crane beam?
  • Ans. 

    Alignment of crane beam is done by using laser alignment tools and adjusting the bolts and shims.

    • Use laser alignment tools to check the alignment of the crane beam.

    • Adjust the bolts and shims as needed to align the beam properly.

    • Ensure that the crane beam is level and parallel to the ground for optimal performance.

  • Answered by AI
  • Q4. How much part of flashing and trim is used in overlapping?
  • Ans. 

    Flashing and trim are essential components in overlapping to ensure proper waterproofing and protection against elements.

    • Flashing and trim are crucial for preventing water infiltration at joints and intersections.

    • Proper overlapping of flashing and trim is necessary to create a watertight seal.

    • Examples of overlapping include step flashing at roof-wall intersections and counter flashing over base flashing.

    • Incorrect overl

  • Answered by AI
  • Q5. Do you know about SSR roof sheeting?
  • Ans. 

    SSR roof sheeting is a type of metal roofing material commonly used in construction projects.

    • SSR stands for Structural Standing Seam Roofing

    • It is a popular choice for commercial and industrial buildings due to its durability and weather resistance

    • SSR roof sheeting is typically made of materials like steel, aluminum, or copper

    • The standing seams on SSR roof sheeting provide added strength and help prevent leaks

  • Answered by AI
  • Q6. Why do you want to join Smith and why should we hire you?
  • Q7. What is expected CTC?
  • Ans. 

    Expected CTC is negotiable based on the candidate's experience, skills, and the company's budget.

    • Expected CTC depends on the candidate's level of experience and skills.

    • It also depends on the company's budget and industry standards.

    • Candidates can research average salaries for similar roles in the industry to get an idea of the expected CTC.

    • Negotiation skills can also play a role in determining the final CTC offer.

  • Answered by AI
  • Q8. What is your notice period?
  • Q9. Tell me something about your previous company?

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepare and confident.

Project Engineer Interview Questions asked at other Companies

Q1. Triangle Star PatternPrint the following pattern for the given N number of rows. Pattern for N = 4 * ** *** **** Note : There are no spaces between the stars (*). Input format : Integer N (Total no. of rows) Output format : Pattern in N l... read more
View answer (9)
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(5 Questions)

  • Q1. What is work at height
  • Ans. 

    Work at height refers to any activity that takes place above ground level, where there is a risk of falling and causing injury or death.

    • Work at height includes tasks such as working on ladders, scaffolding, roofs, or elevated platforms.

    • It involves activities like construction, maintenance, installation, and repair work.

    • Safety measures like fall protection systems, guardrails, and personal protective equipment (PPE) are...

  • Answered by AI
  • Q2. What will see safety during work at height
  • Ans. 

    Safety during work at height includes proper equipment, training, and risk assessment.

    • Use appropriate fall protection equipment such as harnesses, lanyards, and anchor points.

    • Ensure workers are trained on how to use the equipment correctly and safely.

    • Conduct thorough risk assessments before starting any work at height to identify potential hazards.

    • Implement control measures to minimize risks, such as installing guardra...

  • Answered by AI
  • Q3. What will you do after meeting a new worker at site
  • Q4. What are you thinking about PPE
  • Ans. 

    PPE stands for Personal Protective Equipment and is crucial for ensuring the safety of workers in various industries.

    • PPE includes items such as helmets, gloves, safety glasses, and protective clothing.

    • It is important to assess the specific hazards of a job or workplace to determine the appropriate PPE.

    • Regular inspection, maintenance, and replacement of PPE is necessary to ensure its effectiveness.

    • Training and education...

  • Answered by AI
  • Q5. How will worker send on height
  • Ans. 

    Workers can send on height by using safety harnesses and fall protection equipment.

    • Workers should always wear a safety harness when working at heights.

    • Fall protection equipment such as guardrails, safety nets, and lifelines should be used to prevent falls.

    • Regular inspections and maintenance of equipment should be conducted to ensure their effectiveness.

    • Workers should receive proper training on how to use safety equipme...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - This company is good so every staff is also good including Ashish sir ( regional manager ) and all facilities are good. This company is PEB and company standard is good

Safety Officer Interview Questions asked at other Companies

Q1. If you don't have any safety equipment and documents how to complete the work ?
View answer (17)

Smith Structures interview questions for popular designations

 Assistant Manager

 (1)

 Assistant Project Manager

 (1)

 Head Human Resources

 (1)

 Maintenance Manager

 (1)

 Metal Building Engineer

 (1)

 Project Engineer

 (1)

 Safety Officer

 (1)

I applied via Referral and was interviewed in Aug 2021. There were 2 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Regarding project management
  • Q2. Client handling and people management

Assistant Manager Interview Questions asked at other Companies

Q1. You are Handling cash operations then how you manage operations with sales ?
View answer (86)

I applied via Referral and was interviewed in Jun 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Day light pannel fixing details in SSR sheet
  • Ans. 

    Daylight panel fixing details in SSR sheet

    • SSR sheet is a type of roofing sheet used for industrial and commercial buildings

    • Daylight panels are used to allow natural light into the building

    • Fixing details include the type of fasteners used and the spacing between them

    • Proper installation is important to prevent leaks and ensure structural integrity

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Just go with technical sound and patience.

Assistant Project Manager Interview Questions asked at other Companies

Q1. What are the different phases in new product development?
View answer (1)

Jobs at Smith Structures

View all

I applied via Naukri.com and was interviewed before Jun 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. 1. Career journey 2. Domain expertise 3. Major achievement 4. Any failure in career, how it has been delt by me 5. Example of success in career journey 6. Technical questions related to HR domain, especial...

Interview Preparation Tips

Interview preparation tips for other job seekers - Be specific about your role, and responsibilities..
Prepare yourself with proper examples
Express yourself clearly wherever need and most importantly be a pationate listener

Head Human Resources Interview Questions asked at other Companies

Q1. Will you able to handle other plants and you have to manage chairman and MD residence get together Handle hospitality travel management security services laision canteen management contracts renewal lease agreement stationary percurement an... read more
View answer (1)

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Technical 

(2 Questions)

  • Q1. BOQ Knowledge Material knowledge Operation of a Project. SOP delay and Back up plan Vendor pool
  • Q2. Design Understanding
Round 2 - HR 

(2 Questions)

  • Q1. Current CTC which u geting
  • Ans. 

    My current CTC is $80,000 per year.

    • My current CTC is $80,000 per year.

    • I am currently earning $80,000 annually.

    • My current salary is $80,000 per year.

  • Answered by AI
  • Q2. Expected CTC
Round 3 - HR 

(2 Questions)

  • Q1. Offer and Terms and conditions
  • Q2. Joing date and notice period

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared as your experience
Support your reply with simple examples
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Dec 2024. There were 2 interview rounds.

Round 1 - Technical 

(3 Questions)

  • Q1. What is metal door.
  • Q2. What is fire door
  • Q3. Different between metal door and wooden door.
Round 2 - Assignment 

Shakti hormann and its products.

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Sep 2024. There were 2 interview rounds.

Round 1 - One-on-one 

(4 Questions)

  • Q1. Past Experience
  • Q2. Technical Questions about Finishes
  • Q3. Customer Escalation Scenarios
  • Ans. 

    Handling customer escalation scenarios requires empathy, communication skills, and problem-solving abilities.

    • Listen actively to the customer's concerns and show empathy towards their situation.

    • Communicate clearly and professionally, addressing the issue at hand and offering potential solutions.

    • Try to de-escalate the situation by remaining calm and understanding, even if the customer is upset.

    • If necessary, involve a sup...

  • Answered by AI
  • Q4. Difference between PU and Duco Paint
  • Ans. 

    PU paint is a type of polyurethane paint known for its durability and resistance to chemicals, while Duco paint is a type of nitrocellulose paint known for its high gloss finish.

    • PU paint is more durable and resistant to chemicals compared to Duco paint

    • Duco paint is known for its high gloss finish

    • PU paint is commonly used for industrial applications, while Duco paint is often used for furniture and automotive finishes

  • Answered by AI
Round 2 - One-on-one 

(2 Questions)

  • Q1. Past Experience
  • Q2. Quartz and its properties
  • Ans. 

    Quartz is a mineral composed of silicon and oxygen atoms, known for its hardness and durability.

    • Quartz is a common mineral found in many types of rocks, including granite and sandstone.

    • It has a hardness of 7 on the Mohs scale, making it a durable material for countertops and flooring.

    • Quartz can come in a variety of colors and patterns, making it a versatile option for interior design.

    • It is resistant to stains and scrat...

  • Answered by AI

Smith Structures Interview FAQs

How many rounds are there in Smith Structures interview?
Smith Structures interview process usually has 1-2 rounds. The most common rounds in the Smith Structures interview process are HR, Resume Shortlist and Technical.
How to prepare for Smith Structures interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Smith Structures. The most common topics and skills that interviewers at Smith Structures expect are Compliance, Quality Control Management, Inspection, Monitoring and PEB.
What are the top questions asked in Smith Structures interview?

Some of the top questions asked at the Smith Structures interview -

  1. What do you know about anchor bolt and how is it cast...read more
  2. How much part of flashing and trim is used in overlappi...read more
  3. How to prepare a schedule for building completio...read more

Tell us how to improve this page.

Smith Structures Interview Process

based on 4 interviews

Interview experience

4.5
  
Good
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 407 Interviews
GMR Group Interview Questions
4.1
 • 76 Interviews
GAMMON INDIA Interview Questions
3.9
 • 29 Interviews
Punj Lloyd Interview Questions
4.3
 • 18 Interviews
View all

Smith Structures Reviews and Ratings

based on 60 reviews

4.1/5

Rating in categories

3.9

Skill development

3.8

Work-life balance

3.8

Salary

3.9

Job security

3.9

Company culture

3.7

Promotions

3.6

Work satisfaction

Explore 60 Reviews and Ratings
Design Engineer

Hyderabad / Secunderabad

5-10 Yrs

Not Disclosed

Explore more jobs
Assistant Manager
13 salaries
unlock blur

₹3.7 L/yr - ₹8.3 L/yr

Senior Engineer
13 salaries
unlock blur

₹4.6 L/yr - ₹7.5 L/yr

Design Engineer
11 salaries
unlock blur

₹3.6 L/yr - ₹7 L/yr

Mechanical Engineer
11 salaries
unlock blur

₹2 L/yr - ₹4.8 L/yr

Safety Officer
10 salaries
unlock blur

₹3 L/yr - ₹5.4 L/yr

Explore more salaries
Compare Smith Structures with

Tata Projects

4.2
Compare

Larsen & Toubro Limited

4.0
Compare

Shapoorji Pallonji Group

4.1
Compare

GMR Group

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview