I applied via Approached by Company and was interviewed in Jul 2024. There were 2 interview rounds.
Creating a schedule for building completions involves identifying key milestones, setting realistic timelines, allocating resources efficiently, and regularly monitoring progress.
Identify key milestones such as foundation completion, structural framing, and interior finishing.
Set realistic timelines for each milestone based on factors like project scope, budget, and available resources.
Allocate resources efficiently by...
Erection procedure refers to the process of assembling and installing metal building components on site.
Site preparation including clearing and leveling the ground
Assembling structural components like columns, beams, and trusses
Using cranes or other equipment to lift and position components into place
Securing components together with bolts or welding
Checking alignment and making adjustments as needed
Completing finishin...
Start erection at the corner of the building where the largest column is located.
Begin by setting up the largest column at the corner of the building.
Ensure the column is plumb and secure before moving on to the next section.
Continue erecting the building in a sequential manner, following the building plans.
Use appropriate equipment and safety measures throughout the erection process.
To prepare a schedule, start by identifying project tasks, estimating durations, sequencing tasks, assigning resources, and monitoring progress.
Identify all project tasks and break them down into smaller, manageable components.
Estimate the duration of each task based on historical data, expert judgment, or industry standards.
Sequence the tasks in the order they need to be completed, considering dependencies and constra...
I applied via Referral and was interviewed before Jun 2023. There was 1 interview round.
Anchor bolts are used to secure objects or structures to concrete. They are typically casted by drilling a hole in the concrete and inserting the bolt with epoxy or grout.
Anchor bolts are commonly used in construction to secure structures like columns, beams, and equipment to concrete foundations.
The process of casting anchor bolts involves drilling a hole in the concrete, inserting the bolt, and then filling the hole ...
Alignment of crane beam is done by using laser alignment tools and adjusting the bolts and shims.
Use laser alignment tools to check the alignment of the crane beam.
Adjust the bolts and shims as needed to align the beam properly.
Ensure that the crane beam is level and parallel to the ground for optimal performance.
Flashing and trim are essential components in overlapping to ensure proper waterproofing and protection against elements.
Flashing and trim are crucial for preventing water infiltration at joints and intersections.
Proper overlapping of flashing and trim is necessary to create a watertight seal.
Examples of overlapping include step flashing at roof-wall intersections and counter flashing over base flashing.
Incorrect overl
SSR roof sheeting is a type of metal roofing material commonly used in construction projects.
SSR stands for Structural Standing Seam Roofing
It is a popular choice for commercial and industrial buildings due to its durability and weather resistance
SSR roof sheeting is typically made of materials like steel, aluminum, or copper
The standing seams on SSR roof sheeting provide added strength and help prevent leaks
Expected CTC is negotiable based on the candidate's experience, skills, and the company's budget.
Expected CTC depends on the candidate's level of experience and skills.
It also depends on the company's budget and industry standards.
Candidates can research average salaries for similar roles in the industry to get an idea of the expected CTC.
Negotiation skills can also play a role in determining the final CTC offer.
Work at height refers to any activity that takes place above ground level, where there is a risk of falling and causing injury or death.
Work at height includes tasks such as working on ladders, scaffolding, roofs, or elevated platforms.
It involves activities like construction, maintenance, installation, and repair work.
Safety measures like fall protection systems, guardrails, and personal protective equipment (PPE) are...
Safety during work at height includes proper equipment, training, and risk assessment.
Use appropriate fall protection equipment such as harnesses, lanyards, and anchor points.
Ensure workers are trained on how to use the equipment correctly and safely.
Conduct thorough risk assessments before starting any work at height to identify potential hazards.
Implement control measures to minimize risks, such as installing guardra...
PPE stands for Personal Protective Equipment and is crucial for ensuring the safety of workers in various industries.
PPE includes items such as helmets, gloves, safety glasses, and protective clothing.
It is important to assess the specific hazards of a job or workplace to determine the appropriate PPE.
Regular inspection, maintenance, and replacement of PPE is necessary to ensure its effectiveness.
Training and education...
Workers can send on height by using safety harnesses and fall protection equipment.
Workers should always wear a safety harness when working at heights.
Fall protection equipment such as guardrails, safety nets, and lifelines should be used to prevent falls.
Regular inspections and maintenance of equipment should be conducted to ensure their effectiveness.
Workers should receive proper training on how to use safety equipme...
Smith Structures interview questions for popular designations
I applied via Referral and was interviewed in Aug 2021. There were 2 interview rounds.
I applied via Referral and was interviewed in Jun 2021. There was 1 interview round.
Daylight panel fixing details in SSR sheet
SSR sheet is a type of roofing sheet used for industrial and commercial buildings
Daylight panels are used to allow natural light into the building
Fixing details include the type of fasteners used and the spacing between them
Proper installation is important to prevent leaks and ensure structural integrity
I applied via Naukri.com and was interviewed before Jun 2021. There were 2 interview rounds.
Top trending discussions
I applied via Referral and was interviewed in Jun 2024. There was 1 interview round.
Tackling situations involves staying calm, analyzing the problem, creating a plan, and communicating effectively.
Stay calm and composed to think clearly
Analyze the situation to understand the root cause
Create a plan of action with clear steps
Communicate effectively with team members and stakeholders
Adapt and adjust the plan as needed
To control team and labor, effective communication, clear expectations, proper training, motivation, and regular feedback are essential.
Establish clear goals and expectations for the team
Provide proper training and resources to the team members
Communicate effectively with the team to ensure everyone is on the same page
Motivate the team through recognition, rewards, and incentives
Provide regular feedback and address any...
posted on 27 Feb 2024
I applied via Company Website and was interviewed in Jan 2024. There were 2 interview rounds.
ETC stands for Estimate to Complete. It is used in project management to forecast the total cost needed to complete a project.
ETC is an important metric used in project control to predict the remaining cost needed to complete a project.
It helps project managers in making informed decisions about resource allocation and budget management.
ETC is calculated by subtracting the actual cost incurred from the original budgete...
Total float is the amount of time a schedule activity can be delayed without delaying the project completion date, while free float is the amount of time a schedule activity can be delayed without delaying the early start of any successor activity.
Total float is associated with the project completion date, while free float is associated with individual activities.
Total float considers all dependencies and constraints i...
based on 4 interviews
Interview experience
based on 61 reviews
Rating in categories
Senior Engineer
14
salaries
| ₹4.6 L/yr - ₹7.5 L/yr |
Assistant Manager
13
salaries
| ₹3.7 L/yr - ₹8.3 L/yr |
Design Engineer
11
salaries
| ₹3.6 L/yr - ₹7 L/yr |
Mechanical Engineer
11
salaries
| ₹2 L/yr - ₹4.8 L/yr |
Safety Officer
10
salaries
| ₹3 L/yr - ₹5.4 L/yr |
Tata Projects
Larsen & Toubro Limited
Shapoorji Pallonji Group
GMR Group