I applied via Referral and was interviewed in Apr 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Generally all questions were technically inclined towards practical experience. One with good knowledge in site can easily clear the interview.
  • Q2. How do we analysis the section of a drawing.
  • Ans. 

    Section of a drawing can be analyzed by understanding the symbols, dimensions, and annotations used in it.

    • Identify the scale of the drawing

    • Understand the symbols used for different elements

    • Check the dimensions and annotations for accuracy

    • Compare the section with other related drawings

    • Consult with the design team for clarification

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Petty good and formal about 20mins, where I've been tested on my technical, intellectual and characteristic ideas.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is cement and sand
  • Ans. 

    Cement is a binding material used in construction to hold together bricks, stones, and other materials. Sand is a fine aggregate used in concrete mixes.

    • Cement is a powdery substance made from limestone and clay, which when mixed with water forms a paste that hardens to bind materials together.

    • Sand is a granular material composed of finely divided rock and mineral particles, commonly used as a fine aggregate in concrete...

  • Answered by AI
  • Q2. What is aggregate and sand
  • Ans. 

    Aggregate and sand are materials commonly used in construction for creating concrete and mortar.

    • Aggregate is a mixture of sand, gravel, crushed stone, or other materials used in construction.

    • Sand is a granular material composed of finely divided rock and mineral particles.

    • Aggregate is used in concrete to provide bulk and strength, while sand is used in mortar for bonding materials together.

    • Examples of aggregate include...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
-

I applied via Walk-in and was interviewed in Mar 2023. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. Qty of cement in M25 grade concrete
  • Ans. 

    The quantity of cement in M25 grade concrete is 350 kg/m³.

    • M25 grade concrete has a mix proportion of 1:1:2 (cement:sand:aggregate).

    • The total volume of concrete is taken as 1 m³.

    • Therefore, the quantity of cement required for 1 m³ of M25 grade concrete is 350 kg.

    • This is calculated by multiplying the volume of concrete by the proportion of cement in the mix.

  • Answered by AI
  • Q2. Exact weight of different dia of steel
  • Ans. 

    The weight of steel varies with its diameter.

    • The weight of steel can be calculated using the formula: weight = volume x density

    • The density of steel is approximately 7850 kg/m³

    • The volume of steel can be calculated using the formula: volume = pi x (diameter/2)² x length

    • For example, a 10mm diameter steel rod with a length of 1 meter would weigh approximately 0.393 kg

  • Answered by AI
  • Q3. Process of waterproofing
  • Ans. 

    Waterproofing is the process of making a structure or object resistant to water penetration.

    • Identify the areas that need waterproofing such as roofs, walls, and foundations.

    • Clean and prepare the surface to be waterproofed.

    • Apply a waterproofing membrane or coating such as bituminous, acrylic, or polyurethane.

    • Ensure proper drainage and slope to prevent water accumulation.

    • Test the waterproofing system for leaks and make n...

  • Answered by AI
  • Q4. Conversion of brass to Cum
  • Ans. 

    Conversion of brass to Cum

    • Brass is an alloy of copper and zinc, while Cum is not a known substance

    • It is not possible to convert brass to Cum

    • Perhaps the question is referring to a different substance or material

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Worst management. My interview was scheduled on Friday but on Wednesday they email me to come on Thursday. When I reached the mentioned location in email , i was given another location which was 2-3 km away. However when I reached the venue, interview time was 11 Am but it started at 1. Pm . After interview Hr called and told me that you are selected for so and so position but there will be no hike on your current salary, and you have to come for second round . After 15 days they replied me that you are not selected.
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed before Jun 2023.

Round 1 - HR 

(1 Question)

  • Q1. Experience in this industry
  • Ans. 

    I have over 10 years of experience in the civil engineering industry, working on various projects including infrastructure development and construction management.

    • Managed multiple large-scale infrastructure projects from conception to completion

    • Extensive experience in construction management and ensuring projects are completed on time and within budget

    • Strong knowledge of industry regulations and standards

    • Collaborated w...

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. RCC work, block work,
  • Q2. Finishing , plumbing
Round 3 - One-on-one 

(1 Question)

  • Q1. Salary negotiation (cheapest salary)

Interview Preparation Tips

Interview preparation tips for other job seekers - Just need to show off not work
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Jul 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Just construction activities
Round 3 - HR 

(1 Question)

  • Q1. Just Salary negotiations
Round 4 - Behavioral 

(1 Question)

  • Q1. Position and Salary Finalisation

Interview Preparation Tips

Topics to prepare for Ashar group Site Engineer interview:
  • Construction Activity
  • finishing
  • Billing
  • Site Supervision
Interview preparation tips for other job seekers - Just be confident and prompt
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jul 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Bbs Billing Estimation Purchase

Interview Preparation Tips

Interview preparation tips for other job seekers - Bbs
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. 1.Waterproofing process 2.Tiling process 3. External plaster work process

Interview Preparation Tips

Interview preparation tips for other job seekers - Preparation for basic knowledge of construction work

I applied via Walk-in and was interviewed in Jun 2021. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. About your self
  • Q2. My experience as an engineer
  • Q3. How to execute work on site
  • Ans. 

    Execution of work on site involves planning, coordination, and management of resources to ensure timely completion of the project.

    • Develop a detailed project plan and schedule

    • Allocate resources effectively and efficiently

    • Ensure safety measures are in place

    • Regularly monitor and report progress

    • Address any issues or challenges that arise

    • Maintain good communication with stakeholders

    • Ensure quality control and adherence to sp...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - BE polite. And humble and be in confidence

Silpa Projects & Infrastructure Interview FAQs

What are the top questions asked in Silpa Projects & Infrastructure Civil Site Engineer interview for experienced candidates?

Some of the top questions asked at the Silpa Projects & Infrastructure Civil Site Engineer interview for experienced candidates -

  1. How do we analysis the section of a drawin...read more
  2. Generally all questions were technically inclined towards practical experience....read more

Tell us how to improve this page.

People are getting interviews through

based on 1 Silpa Projects & Infrastructure interview
Referral
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.
Silpa Projects & Infrastructure Civil Site Engineer Salary
based on 5 salaries
₹1.2 L/yr - ₹2.4 L/yr
42% less than the average Civil Site Engineer Salary in India
View more details
Civil Site Engineer
5 salaries
unlock blur

₹1.2 L/yr - ₹2.4 L/yr

Quantity Surveyor
5 salaries
unlock blur

₹1.8 L/yr - ₹3.5 L/yr

HR Manager
4 salaries
unlock blur

₹3 L/yr - ₹3 L/yr

General Manager Finance
4 salaries
unlock blur

₹15 L/yr - ₹21.8 L/yr

Accountant
3 salaries
unlock blur

₹1.8 L/yr - ₹2.5 L/yr

Explore more salaries
Compare Silpa Projects & Infrastructure with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.3
Compare

GMR Group

4.1
Compare

Hindustan Construction Company

4.2
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview