Upload Button Icon Add office photos

Filter interviews by

Siddhika Coatings Project Executive Interview Questions and Answers

Updated 28 Nov 2021

Siddhika Coatings Project Executive Interview Experiences

1 interview found

I applied via Recruitment Consultant and was interviewed in Oct 2021. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. Why you want to work with us
  • Q2. Wh should we hire you

Interview Preparation Tips

Interview preparation tips for other job seekers - Please be precise and only reply to what was asked

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Base practices in ASPICE
  • Q2. Scope management and schedule
Interview experience
3
Average
Difficulty level
Easy
Process Duration
-
Result
Not Selected
Round 1 - Technical 

(3 Questions)

  • Q1. Shuttering oil coverage
  • Q2. Cost to complition of project getting delay .how to make profite to company
  • Ans. 

    To mitigate the cost impact of project delays, focus on improving efficiency, reducing waste, and optimizing resources.

    • Identify the root causes of the delays and address them promptly.

    • Implement project management tools and techniques to streamline processes and improve productivity.

    • Optimize resource allocation to ensure maximum utilization and minimize idle time.

    • Negotiate with suppliers and vendors for better pricing o...

  • Answered by AI
  • Q3. How much ur carpent area and buildup area
  • Ans. 

    The carpet area is the area within the walls of the apartment that can be carpeted, while the built-up area includes the carpet area plus the thickness of the walls.

    • Carpet area is the actual area where you can lay a carpet.

    • Built-up area includes the carpet area plus the thickness of the walls.

    • Carpet area is usually around 70-80% of the built-up area.

    • For example, if the built-up area is 1000 square feet, the carpet area

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - U have to prepare as much as possible
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
-

I applied via Walk-in and was interviewed in Aug 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. HydroTest of DI and HDPE pipe
  • Ans. 

    Hydrostatic testing is a common method used to test the integrity of DI and HDPE pipes by pressurizing them with water.

    • Hydrostatic testing involves filling the pipe with water and pressurizing it to a specified level to check for leaks or weaknesses.

    • DI (Ductile Iron) pipes are typically tested at 1.5 times their working pressure, while HDPE (High-Density Polyethylene) pipes are tested at 1.25 times their working pressu...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Bhai Vegetarian food allowed hai no nonveg food allowed. Aur Daru cigrette nahi pite to company tumhare baap ki samjho .
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. How to calculated pump head
  • Ans. 

    Pump head is calculated by adding the static head, friction head, and velocity head.

    • Calculate the static head by measuring the vertical distance between the pump centerline and the highest point of the system.

    • Calculate the friction head by considering the pipe length, diameter, roughness, and flow rate.

    • Calculate the velocity head by using the formula: V^2 / (2g), where V is the velocity of the fluid and g is the accele...

  • Answered by AI
  • Q2. How to oprate the fire alaram system
  • Ans. 

    To operate the fire alarm system, follow these steps: activate the alarm, evacuate the building, and wait for emergency responders.

    • Activate the fire alarm by pulling the nearest alarm pull station or pressing the alarm button.

    • Evacuate the building immediately using the nearest exit and do not use elevators.

    • Wait for emergency responders to arrive and provide them with any relevant information about the situation.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - If existing staff learn to junior company growth will not held up
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in May 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Post Project related
  • Q2. Present project description
  • Ans. 

    The project involves managing the development of a new mobile application for a retail company.

    • Coordinating with the development team to ensure timely delivery of the app

    • Creating and managing project timelines and milestones

    • Collaborating with stakeholders to gather requirements and feedback

    • Monitoring and controlling project budget and resources

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be right always
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Not Selected

I applied via Walk-in and was interviewed in Jan 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Technical Questions about Subject
  • Q2. Discussion about Experience and Number of projects done in past..
Round 2 - HR 

(1 Question)

  • Q1. Discussion about salary.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Jan 2024.

Round 1 - Technical 

(2 Questions)

  • Q1. What is the pressure rating for steam pipes?
  • Q2. What did you do in your project? And asked in depth questions including construction and mechanical engineering
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Technical 

(2 Questions)

  • Q1. Billing Site work
  • Q2. Billing and Site work
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Work related for technical questions
  • Q2. Growth the achievement

Tell us how to improve this page.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 715 Interviews
Tata Projects Interview Questions
4.2
 • 413 Interviews
KEC International Interview Questions
4.1
 • 289 Interviews
Tata Technologies Interview Questions
3.6
 • 252 Interviews
TCE Interview Questions
3.8
 • 244 Interviews
View all
Site Engineer
7 salaries
unlock blur

₹3 L/yr - ₹3.8 L/yr

Senior Executive Operations
5 salaries
unlock blur

₹2.6 L/yr - ₹3.5 L/yr

Operations Executive
5 salaries
unlock blur

₹2.2 L/yr - ₹3.2 L/yr

CS Compliance Officer
4 salaries
unlock blur

₹3.6 L/yr - ₹4.6 L/yr

Assistant Business Operations Manager
4 salaries
unlock blur

₹6.3 L/yr - ₹10 L/yr

Explore more salaries
Compare Siddhika Coatings with

Larsen & Toubro Limited

4.0
Compare

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Megha Engineering & Infrastructures

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview