i
SHYAM METALICS AND ENERGY
Filter interviews by
I was interviewed before Jan 2024.
The STOP button in a Siemens PLC is used to immediately halt the operation of the PLC.
The STOP button is a safety feature that allows operators to quickly stop the PLC in case of emergencies or malfunctions.
Pressing the STOP button will halt the execution of the program and prevent any further outputs from the PLC.
The STOP button is typically connected to a dedicated input on the PLC to ensure immediate response.
Transformer's rated capacity is expressed in kVA and is based on the maximum amount of power it can handle.
Transformer's rated capacity is expressed in kilovolt-amperes (kVA).
The reason for expressing rated capacity in kVA is to account for both the voltage and current handling capabilities of the transformer.
kVA takes into consideration the power factor of the load, ensuring that the transformer can handle the maximum...
Types of PLC include modular, compact, rack-mounted, and distributed control system.
Modular PLC: Consists of separate modules for CPU, I/O, and communication.
Compact PLC: All components are housed in a single unit, suitable for small-scale applications.
Rack-mounted PLC: Components are mounted on a rack, allowing for easy expansion and customization.
Distributed Control System (DCS): PLCs are spread out across a network,
Redundancy in PLCs refers to having backup components or systems in place to ensure continuous operation in case of failure.
Redundancy in PLCs involves having duplicate components or systems that can take over in case of a failure in the primary system.
Examples of redundancy in PLCs include having backup power supplies, redundant CPUs, and duplicate I/O modules.
Redundancy can help prevent downtime and ensure continuous...
Maintaining a safe loading dock involves regular inspections, proper training for employees, clear communication, and implementing safety protocols.
Regularly inspect loading dock equipment for wear and tear
Provide proper training for employees on safe loading and unloading procedures
Ensure clear communication between truck drivers, warehouse staff, and management
Implement safety protocols such as using wheel chocks, do
Top trending discussions
I was interviewed before Nov 2016.
Yes, I am willing to work at any location for the Senior Engineer position.
I am open to relocating for the right opportunity
I have experience working in different locations
I am flexible and adaptable to new environments
I have a proven track record of staying calm and focused in challenging situations, allowing me to problem-solve effectively.
I have experience working in high-pressure environments and have successfully delivered projects on time despite obstacles.
I am adaptable and can quickly assess a situation to determine the best course of action.
I have strong problem-solving skills and can think creatively to find solutions in ad
I applied via Naukri.com and was interviewed before Mar 2023. There were 2 interview rounds.
Online Aptitude test with GK, quant and domain knowledge
A transformer functions by transferring electrical energy between two or more circuits through electromagnetic induction.
Transformers consist of two coils of wire, known as the primary and secondary coils.
When an alternating current flows through the primary coil, it creates a changing magnetic field.
This changing magnetic field induces a voltage in the secondary coil, transferring electrical energy between the two cir...
I applied via Company Website and was interviewed in Mar 2024. There was 1 interview round.
Common way of demolition is through controlled implosion.
Controlled implosion is a method where explosives are strategically placed to bring down a structure in a controlled manner.
Another common method is mechanical demolition using equipment like wrecking balls, excavators, or bulldozers.
Selective demolition involves dismantling specific parts of a structure while leaving the rest intact.
Deconstruction is a sustainab...
Vibration time of concrete is the duration for which concrete is vibrated to remove air bubbles and ensure proper compaction.
Vibration time varies based on factors like mix design, slump, size of pour, and type of vibrator used.
Typically, vibration time ranges from 10-30 seconds per foot of concrete thickness.
Over-vibration can lead to segregation of aggregates, while under-vibration can result in honeycombing.
Proper v...
posted on 18 May 2020
I applied via Naukri.com and was interviewed in Nov 2019. There were 3 interview rounds.
Control valve calibration involves adjusting the valve to ensure it operates within specified parameters.
Determine the valve's operating range and desired set points
Use a calibration bench or in-line calibration equipment to adjust the valve's position and response time
Verify the valve's performance using a flow meter or pressure gauge
Document the calibration process and results for future reference
I applied via Naukri.com and was interviewed in Mar 2021. There were 4 interview rounds.
To tackle vibrations in axial fans, proper balancing, alignment, and maintenance are essential.
Perform dynamic balancing of the fan blades to minimize vibrations.
Ensure proper alignment of the fan with the motor and the surrounding structure.
Regularly inspect and maintain the fan components to prevent wear and tear.
Use vibration analysis techniques to identify and address any potential issues.
Consider installing vibrat...
We follow a permit system based on the project requirements and local regulations.
Our permit system ensures compliance with safety standards and legal requirements.
We obtain permits for activities such as construction, electrical work, and hazardous material handling.
The specific permit requirements vary depending on the nature of the project and the location.
We work closely with regulatory authorities to ensure timely...
I applied via Company Website and was interviewed in Oct 2022. There were 2 interview rounds.
I applied via Referral and was interviewed before May 2023. There was 1 interview round.
I applied via LinkedIn and was interviewed in Apr 2024. There were 2 interview rounds.
My current salary is $8,000 per month.
My current salary is $8,000 per month
I am currently earning $8,000 monthly
My monthly salary is $8,000
I was interviewed in Apr 2024.
Some of the top questions asked at the SHYAM METALICS AND ENERGY Project Engineer interview -
based on 1 interview
Interview experience
based on 4 reviews
Rating in categories
Engineer
205
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineer
190
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
163
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
160
salaries
| ₹0 L/yr - ₹0 L/yr |
Mechanical Engineer
71
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata Steel
JSW Steel
Steel Authority Of India
Jindal Steel and Power