i
Shri Bhagwati Machines
Filter interviews by
I applied via Walk-in and was interviewed in Jul 2024. There were 2 interview rounds.
Gravity is a force that attracts objects with mass towards each other.
Gravity is a natural phenomenon that causes objects with mass to be attracted to each other.
It is responsible for keeping planets in orbit around the sun.
The strength of gravity depends on the mass of the objects and the distance between them.
Latent heat is the heat energy absorbed or released during a phase change without a change in temperature.
Latent heat is the energy absorbed or released when a substance changes from one state to another, such as from solid to liquid or liquid to gas.
It is called 'latent' because it is hidden or concealed within the substance and does not cause a change in temperature.
Examples include the heat absorbed when ice melts i...
Team green field projects refer to new projects that are started from scratch without any prior constraints or limitations.
Team green field projects involve starting a project with a clean slate, without any existing infrastructure or limitations.
These projects allow for creativity and innovation as there are no pre-existing guidelines to follow.
Examples of team green field projects include developing a new product lin...
Journal bearings use a sliding motion between surfaces, while rolling-element bearings use rolling elements to reduce friction.
Journal bearings have a simpler design with a smooth surface for the shaft to rotate on.
Rolling-element bearings have balls or rollers that roll between inner and outer races to reduce friction and support the load.
Journal bearings are typically used in applications with lower speeds and loads,...
Reading engineering drawings involves understanding symbols, dimensions, and annotations to interpret the design.
Understand the different types of lines and symbols used in the drawing
Pay attention to dimensions, tolerances, and annotations to ensure accurate interpretation
Familiarize yourself with common drawing conventions and standards such as ASME Y14.5
Use a scale ruler to measure dimensions accurately
Refer to the ...
Compressor is a mechanical device that increases the pressure of a gas by reducing its volume.
Compressors can be classified into positive displacement compressors (reciprocating, rotary) and dynamic compressors (centrifugal, axial).
Positive displacement compressors work by trapping a volume of gas and then reducing its volume to increase pressure.
Dynamic compressors work by imparting velocity to the gas and then conver...
Troubleshooting process involves identifying the issue, gathering information, testing components, and making necessary repairs.
Identify the issue by observing symptoms and conducting tests
Gather information such as maintenance history and service manuals
Test components to pinpoint the root cause of the problem
Make necessary repairs or replacements based on findings
Document the troubleshooting process for future refere
I applied via Naukri.com and was interviewed in Feb 2024. There were 3 interview rounds.
Experienced project manager with a background in engineering and a proven track record of successfully leading teams to deliver projects on time and within budget.
Over 5 years of project management experience
Strong leadership and communication skills
Proficient in project management tools such as Microsoft Project
Managed a team of engineers to successfully complete a major infrastructure project
I have a strong background in project management with proven leadership skills and a track record of successful project delivery.
Extensive experience in project management
Strong leadership skills
Proven track record of successful project delivery
Excellent communication and organizational skills
My area of expertise is project management, specifically in the field of construction.
Extensive experience in creating project plans and schedules
Strong leadership skills to effectively manage project teams
Knowledge of construction industry standards and regulations
Ability to effectively communicate with stakeholders and clients
Proven track record of delivering projects on time and within budget
Cost management in inline manufacturing involves optimizing processes, reducing waste, and negotiating with suppliers.
Implementing lean manufacturing principles to reduce waste and improve efficiency
Negotiating with suppliers to get the best prices for materials and components
Regularly monitoring and analyzing costs to identify areas for improvement
Utilizing cost estimation tools and software to accurately predict expe...
Yes, ERP (Enterprise Resource Planning) model is a system used to manage and integrate the important parts of a business.
ERP model helps in streamlining processes and improving efficiency.
It integrates various functions like finance, HR, inventory, and customer relationship management.
Examples of ERP systems include SAP, Oracle, and Microsoft Dynamics.
Yes, I am willing to relocate for the right opportunity.
I am open to relocating for career growth and new experiences.
I have relocated in the past for job opportunities and have found it to be a positive experience.
I understand the importance of being flexible and adaptable in the workplace, including being open to relocation.
Yes, I am comfortable with flexible work hours.
I am adaptable and can easily adjust my schedule to accommodate flexible work hours.
I understand the importance of work-life balance and am willing to work outside traditional hours if needed.
I have previous experience working in environments with flexible work hours, such as remote teams or project-based work.
Shri Bhagwati Machines interview questions for popular designations
My favorite subject is mathematics because I enjoy solving complex problems and using logic to find solutions.
I love working with numbers and equations
I find joy in solving challenging math problems
I appreciate the logical reasoning involved in mathematics
I enjoy learning new mathematical concepts and applying them in real-life situations
I applied via Company Website and was interviewed before Aug 2023. There were 2 interview rounds.
7QC is a quality control tool used to identify and solve problems in a systematic way.
7QC stands for 7 Quality Control tools
These tools are used to analyze data and identify root causes of quality issues
Examples include Pareto charts, cause-and-effect diagrams, and control charts
Kaizen is a Japanese business philosophy of continuous improvement involving all employees.
Kaizen focuses on making small, incremental changes to processes to improve efficiency and quality.
It involves all employees at every level of the organization in identifying and implementing improvements.
Kaizen promotes a culture of continuous learning and innovation.
Examples of kaizen include implementing a new workflow to redu...
N6 is a designation used in the aerospace industry to refer to a specific type of fastener.
N6 typically refers to a specific size or type of fastener used in aerospace engineering.
It could also refer to a specific material or coating used in fasteners.
Examples of N6 fasteners include N6-32 screws or N6 washers.
8D is a problem-solving methodology used in quality management to identify, correct, and prevent recurring problems.
8D stands for Eight Disciplines and is a structured problem-solving process.
It involves identifying the problem, forming a team, implementing temporary and permanent corrective actions, and preventing recurrence.
Examples of tools used in 8D include fishbone diagrams, 5 Whys analysis, and control plans.
The...
I applied via Naukri.com and was interviewed before Dec 2021. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed in Dec 2020. There were 3 interview rounds.
I applied via Indeed and was interviewed before May 2021. There were 2 interview rounds.
Cnc programming
Top trending discussions
Interview experience
based on 134 reviews
Rating in categories
Design Engineer
11
salaries
| ₹2.3 L/yr - ₹5.2 L/yr |
Senior Engineer
8
salaries
| ₹4.5 L/yr - ₹8.2 L/yr |
Sales & Service Engineer
7
salaries
| ₹3.3 L/yr - ₹5.6 L/yr |
Production Engineer
7
salaries
| ₹4 L/yr - ₹5 L/yr |
Assistant Manager
6
salaries
| ₹6 L/yr - ₹7.8 L/yr |
Bosch
Godrej & Boyce Manufacturing
TCS
Larsen & Toubro Limited