I applied via Recruitment Consulltant and was interviewed before Oct 2022. There were 3 interview rounds.
I applied via Walk-in and was interviewed in Apr 2022. There was 1 interview round.
The lapping zone in beams, columns, and slabs is the area where reinforcement bars overlap to ensure structural integrity.
Lapping zone is typically located at the ends of beams, columns, and slabs.
It is necessary to provide sufficient overlap of reinforcement bars to transfer loads effectively.
The length of the lapping zone depends on the design requirements and the diameter of the reinforcement bars.
Lapping helps in m...
The load capacity of a 1.5m MS probe depends on various factors and cannot be determined without additional information.
The load capacity of a 1.5m MS probe depends on its diameter, material composition, and design.
The soil conditions and type of foundation also play a significant role in determining the load capacity.
Without specific details about the probe and the project requirements, it is not possible to provide a...
The unit weight of cement mortar varies depending on the mix ratio and the density of the materials used.
The unit weight of cement mortar is typically between 2200 to 2500 kilograms per cubic meter (kg/m³).
The unit weight can be calculated by multiplying the density of cement mortar by the volume of the material.
The density of cement mortar is influenced by the proportions of cement, sand, and water in the mix.
Differen...
Online aptitude test will conduct
I applied via Company Website and was interviewed before May 2023. There was 1 interview round.
Initial setting time is the time taken for the cement to harden to a certain degree, while final setting time is the time taken for the cement to completely harden.
Initial setting time is typically around 30 minutes to 1 hour after adding water to the cement.
Final setting time is usually around 2 to 4 hours after adding water to the cement.
Setting time can vary based on the type of cement and environmental conditions.
S
Bleeding is the process of air escaping from fresh concrete mix and rising to the surface.
Bleeding occurs when water in the concrete mix rises to the surface due to settlement of solid particles.
It can lead to surface defects if not properly managed.
Bleeding can be reduced by using proper mix design and techniques like vibration or adding admixtures.
Excessive bleeding can weaken the surface of the concrete.
Examples: Wa...
Shapoorji Pallonji Group interview questions for popular designations
I applied via Recruitment Consulltant and was interviewed before Mar 2022. There were 2 interview rounds.
Basics of electrical include understanding circuits, components, and power sources. Foundations of production and maintenance work involve safety, planning, and troubleshooting.
Basics of electrical include understanding circuits, components, and power sources
Foundations of production work involve safety, planning, and quality control
Foundations of maintenance work involve safety, planning, and troubleshooting
Examples o...
Get interview-ready with Top Shapoorji Pallonji Group Interview Questions
I applied via Approached by Company and was interviewed before Apr 2022. There were 3 interview rounds.
20 question of Apti and 30 questions of Technical, timing 1 hr
I applied via Company Website and was interviewed in Nov 2022. There were 4 interview rounds.
Please find abilities olof the person
Round 2 please find all experience of the person
I applied via Recruitment Consulltant and was interviewed in Mar 2022. There was 1 interview round.
I applied via Walk-in and was interviewed before Feb 2023. There were 2 interview rounds.
Emergency preparedness is a well-known concept in protecting workers' safety and health. Putting together a comprehensive emergency action plan involves conducting a hazard assessment to determine what, if any, physical or chemical hazards inside or from outside the workplaces could cause an emergency.
Make sure electrical equipment is properly connected, grounded and in good working order. Extension cords may not be used as permanent wiring and should be removed after temporary use for an activity or event.
FIRE FIGHTING SYSTEMS · a large store of water in tanks, either underground or on top of the building, called fire storage tanks · a specialised pumping system, ...
I applied via Naukri.com and was interviewed in Feb 2022. There were 2 interview rounds.
Yes, I have done estimation independently.
I have experience in creating cost estimates for various projects.
I have worked on proposals where I had to estimate the cost of materials, labor, and equipment.
I have also estimated the time required to complete a project.
I have used various tools and techniques to ensure accuracy in my estimates.
For example, I have used historical data, industry benchmarks, and expert judgmen...
Cross verifying rates involves comparing rates with industry standards and previous project data.
Compare rates with industry standards to ensure competitiveness
Verify rates with previous project data to ensure consistency
Consider factors such as inflation and market trends when cross verifying rates
Use software tools to automate the process and reduce errors
Involve subject matter experts in the cross verification proce
Some of the top questions asked at the Shapoorji Pallonji Group interview -
The duration of Shapoorji Pallonji Group interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 314 interviews
Interview experience
based on 4.7k reviews
Rating in categories
Deputy Manager
621
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
429
salaries
| ₹0 L/yr - ₹0 L/yr |
Construction Engineer
291
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Site Engineer
228
salaries
| ₹0 L/yr - ₹0 L/yr |
Safety Officer
225
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata Group
Reliance Industries
Adani Group
Mahindra & Mahindra