Q101. Shuttering repetation for different type of material.
Q102. what are the intersted subjects
The interested subjects for a Graduate Engineer Trainee may include engineering fundamentals, mathematics, physics, computer science, and specialized subjects related to the trainee's field of interest.
Engineering fundamentals
Mathematics
Physics
Computer science
Specialized subjects related to the trainee's field of interest
Q103. Who many workers required in 1000 square metres ? How you know right angle ?
The number of workers required in 1000 square metres depends on the type of work being done.
The type of work being done determines the number of workers required.
For example, if it's a construction site, the number of workers required will depend on the type of construction work being done.
Similarly, if it's an office space, the number of workers required will depend on the type of work being done and the layout of the space.
To determine the number of workers required, it's i...read more
Q104. What is fire
Fire is a rapid chemical reaction that releases heat, light, and various gases.
Fire is a combustion process that occurs when fuel, oxygen, and heat are present.
It is characterized by the rapid oxidation of a material, resulting in the release of energy in the form of heat and light.
Fire can spread quickly and can be destructive if not controlled.
Examples of fuel sources for fire include wood, paper, gasoline, and natural gas.
Fire produces smoke, which can be toxic and pose a ...read more
Q105. Unit weight of steel ?
The unit weight of steel refers to the weight of a specific volume of steel.
The unit weight of steel is typically measured in pounds per cubic foot or kilograms per cubic meter.
The specific unit weight of steel can vary depending on the type and grade of steel.
For example, the unit weight of mild steel is approximately 490 pounds per cubic foot or 7850 kilograms per cubic meter.
On the other hand, the unit weight of stainless steel is around 500 pounds per cubic foot or 8000 k...read more
Q106. 1) Design of slab 2) Design of Beam
Design of slab and beam involves calculating loads, selecting materials, and determining dimensions.
Calculate loads on the slab and beam
Select appropriate materials for the slab and beam
Determine the dimensions of the slab and beam
Consider factors such as span, deflection, and cracking
Ensure compliance with building codes and regulations
Q107. What is auto level mechine?
An auto level machine is a surveying instrument used to measure height differences and level surfaces.
Auto level machines use a compensator to ensure accurate readings.
They are commonly used in construction, land surveying, and civil engineering.
Examples of auto level machines include Leica NA700 Series and Topcon AT-B Series.
Q108. How to cross verifying your rates
Cross verifying rates involves comparing rates with industry standards and previous project data.
Compare rates with industry standards to ensure competitiveness
Verify rates with previous project data to ensure consistency
Consider factors such as inflation and market trends when cross verifying rates
Use software tools to automate the process and reduce errors
Involve subject matter experts in the cross verification process
Q109. What is the thickness of vdf concrete
The thickness of vdf concrete varies depending on the application and design requirements.
VDF stands for Vacuum Dewatered Flooring
The thickness can range from 50mm to 150mm
The thickness is determined by factors such as load-bearing capacity, durability, and aesthetics
The concrete is compacted using a vacuum pump to remove excess water and increase strength
Q110. How many type of bill?
There are two main types of bills: a bill of exchange and a bill of lading.
Bill of exchange is a written order by one party to another to pay a certain sum of money on a specific date.
Bill of lading is a document issued by a carrier to acknowledge receipt of goods for shipment.
Q111. Explain any 2 sections under Income Tax Act.
Section 80C and Section 234F are two important sections under Income Tax Act.
Section 80C allows taxpayers to claim deductions up to Rs. 1.5 lakh on investments made in specified instruments such as PPF, ELSS, NSC, etc.
Section 234F deals with the late filing of income tax returns and imposes a penalty ranging from Rs. 1,000 to Rs. 10,000 depending on the delay.
Q112. Minimum cement content of different grades as per IS 456
Minimum cement content for different grades as per IS 456.
Minimum cement content for M10 to M45 grade concrete is 220 kg/m3
For M50 and M55 grade concrete, minimum cement content is 240 kg/m3
For M60 and M65 grade concrete, minimum cement content is 260 kg/m3
For M70 and M75 grade concrete, minimum cement content is 280 kg/m3
Q113. Fullfil your target which you got
I consistently meet or exceed my targets by setting clear goals, prioritizing tasks, and regularly monitoring progress.
Setting specific, measurable targets
Creating a detailed action plan
Regularly tracking progress and making adjustments as needed
Q114. Which lime is used for white washing
Quicklime is used for white washing.
Quicklime, also known as calcium oxide, is used for white washing.
It is a white, caustic, alkaline substance that is produced by heating limestone in a kiln.
When water is added to quicklime, it undergoes a chemical reaction to form calcium hydroxide, which is used in white washing.
Q115. What is segregation?
Segregation refers to the separation of different components or materials from a mixture.
Segregation can occur due to differences in size, density, or shape of the components.
Examples of segregation include the separation of oil and water in a mixture, or the separation of different sized particles in a granular material.
Segregation can have negative effects on the quality and consistency of a product, such as in the case of uneven mixing in pharmaceuticals or food products.
P...read more
Q116. What is HIRA? Diff methods of Impact assessment?
Q117. iBOSh full from
I'm sorry, but the question is not clear and seems to be incomplete.
Please provide more context or rephrase the question.
Without proper information, I cannot provide a relevant answer.
Kindly clarify the question so that I can assist you better.
Q118. Manpower vs quantity achieved.
The quantity achieved is dependent on the manpower available.
The more manpower available, the higher the quantity that can be achieved.
Efficient utilization of manpower can lead to higher productivity.
Manpower shortage can result in lower quantity achieved.
Automation and technology can help in achieving higher quantity with less manpower.
Proper planning and coordination are essential to optimize manpower and achieve desired quantity.
Q119. How to grow with next generation
Q120. How to make career in industrial area
Q121. How to grow with people employees
Q122. What is accident
An accident is an unexpected and unintentional event that causes harm or damage.
Accidents can happen in any setting, including workplaces, homes, and on the road.
They can result in physical injuries, property damage, or both.
Accidents can be caused by human error, equipment failure, or environmental factors.
Examples of accidents include slips and falls, car crashes, and machinery malfunctions.
Q123. Circumstances of handing over flat to Clint
The circumstances of handing over the flat to Clint
The flat was handed over to Clint after completing all necessary paperwork
The condition of the flat was documented before handing it over to Clint
Keys and access cards were provided to Clint
Any outstanding payments or dues were settled before the handover
Q124. Initial and final setting time for cement.
Initial setting time is the time taken for the cement to harden to a certain degree, while final setting time is the time taken for the cement to completely harden.
Initial setting time is typically around 30 minutes to 1 hour after adding water to the cement.
Final setting time is usually around 2 to 4 hours after adding water to the cement.
Setting time can vary based on the type of cement and environmental conditions.
Setting time can be tested using Vicat apparatus.
Q125. Material right from sources to reach our store
The material is sourced and delivered to our store through a well-established supply chain.
Establishing strong relationships with reliable suppliers
Ensuring timely procurement and delivery of materials
Implementing effective inventory management systems
Monitoring and optimizing transportation logistics
Maintaining quality control standards
Utilizing technology for efficient tracking and traceability
Collaborating with cross-functional teams for seamless material flow
Q126. What is sequence of planning
The sequence of planning involves defining objectives, identifying resources, creating a schedule, and monitoring progress.
Define project objectives and scope
Identify resources needed for the project
Create a detailed schedule outlining tasks and milestones
Allocate resources effectively to meet project deadlines
Monitor progress and make adjustments as needed
Q127. What is project deliverables
Project deliverables are the tangible outcomes or results that must be produced to complete a project.
They are specific, measurable, and usually time-bound.
Examples include reports, prototypes, software, buildings, or any other tangible product or result.
Deliverables help to define the scope of the project and provide a clear target for the project team.
Q128. What are Labour Out puts
Labour outputs refer to the amount of work completed by a laborer within a specific time frame.
Labour outputs are typically measured in units of work completed, such as square meters of concrete poured or number of bricks laid.
They are influenced by factors such as skill level of the laborer, availability of tools and equipment, and working conditions.
Monitoring and analyzing labour outputs can help in assessing productivity, identifying bottlenecks, and improving project eff...read more
Q129. Key responsibilties of Planning Engineer
Key responsibilities include creating project schedules, monitoring progress, identifying delays, and providing recommendations for improvement.
Creating and maintaining project schedules using software like Primavera P6
Monitoring project progress and identifying potential delays
Analyzing project data to provide recommendations for improvement
Collaborating with project team members to ensure schedule adherence
Preparing reports and presentations for project stakeholders
Q130. What is role plant & machinery
Plant & machinery play a crucial role in the manufacturing process by enabling efficient production and reducing manual labor.
Plant & machinery help in automating the manufacturing process
They increase production efficiency and reduce manual labor
They help in maintaining quality standards and consistency
Regular maintenance and upkeep of plant & machinery is necessary for optimal performance
Examples include conveyor belts, assembly lines, and robotic arms
Q131. How growth the marketing
Marketing growth can be achieved through various strategies such as digital marketing, social media campaigns, partnerships, and targeted advertising.
Utilize digital marketing channels such as SEO, SEM, and email marketing to reach a wider audience
Create engaging social media campaigns to increase brand awareness and attract new customers
Form partnerships with complementary businesses to expand reach and access new markets
Invest in targeted advertising to reach specific demog...read more
Q132. How to oprate the fire alaram system
To operate the fire alarm system, follow these steps: activate the alarm, evacuate the building, and wait for emergency responders.
Activate the fire alarm by pulling the nearest alarm pull station or pressing the alarm button.
Evacuate the building immediately using the nearest exit and do not use elevators.
Wait for emergency responders to arrive and provide them with any relevant information about the situation.
Q133. LMR full from
LMR full from refers to a situation where the Land Mobile Radio system is at maximum capacity.
LMR full from means that the Land Mobile Radio system is unable to accommodate any more users or communications.
This can occur when all available channels or frequencies are in use.
It may result in communication delays or the inability to establish new connections.
LMR full from can impact the effectiveness of emergency response or safety operations.
To address this issue, additional c...read more
Q134. Have you done estimation independently
Yes, I have done estimation independently.
I have experience in creating cost estimates for various projects.
I have worked on proposals where I had to estimate the cost of materials, labor, and equipment.
I have also estimated the time required to complete a project.
I have used various tools and techniques to ensure accuracy in my estimates.
For example, I have used historical data, industry benchmarks, and expert judgment.
I have also reviewed and analyzed project requirements t...read more
Q135. How handle breakdown machinery work.
Breakdown machinery work is handled by identifying the issue, assessing the impact, and taking appropriate action to repair or replace the machinery.
Quickly assess the situation to determine the severity of the breakdown
Identify the root cause of the issue and take appropriate action to repair or replace the machinery
Ensure that all safety protocols are followed during the repair process
Communicate with relevant stakeholders to keep them informed of the situation and any pote...read more
Q136. Productivity rates for different type of works
Productivity rates vary based on the type of work being done.
Productivity rates can be affected by factors such as the complexity of the task, the skill level of the worker, and the tools and equipment being used.
For example, a skilled carpenter may be able to complete a framing job faster than an inexperienced worker.
Similarly, a worker using a power tool may be able to complete a task more quickly than one using a manual tool.
Productivity rates can also be affected by exter...read more
Q137. Mode of measurement as per IS 1200
IS 1200 specifies the mode of measurement for construction works.
IS 1200 is a standard code used in India for measurement of construction works.
It specifies the mode of measurement for various items of work like excavation, concrete, brickwork, etc.
The mode of measurement can be either by volume, weight, area, length, or number.
For example, the mode of measurement for excavation is by volume in cubic meters.
Similarly, the mode of measurement for brickwork is by area in square...read more
Q138. How many type of calipers
There are several types of calipers used in plumbing.
Vernier caliper
Dial caliper
Digital caliper
Inside caliper
Outside caliper
Depth caliper
Q139. Shut down work
Shutting down work is a crucial safety measure to prevent accidents and ensure the well-being of workers.
Shutting down work may be necessary in case of an imminent danger or hazard that cannot be immediately controlled.
It is important to have clear protocols and procedures in place for shutting down work in different scenarios.
Examples of situations that may require work shutdown include gas leaks, chemical spills, structural instability, severe weather conditions, or equipme...read more
Q140. Experience in various aspects of Direct Taxation.
I have extensive experience in various aspects of Direct Taxation.
I have worked on tax planning and compliance for individuals and corporations.
I have experience in filing tax returns, handling tax audits, and resolving tax disputes.
I am familiar with tax laws and regulations, and keep up-to-date with changes in tax codes.
I have also provided tax advice to clients on matters such as mergers and acquisitions, international taxation, and transfer pricing.
For example, I helped a...read more
Q141. What types of HVAC systems
There are several types of HVAC systems, including central, split, packaged, ductless, and geothermal.
Central HVAC systems use ducts to distribute air throughout a building
Split systems have separate indoor and outdoor units
Packaged systems have all components in one unit
Ductless systems use individual units in each room
Geothermal systems use the earth's temperature to heat and cool a building
Q142. What is safety
Safety is the state of being protected from harm or danger.
Safety refers to the measures taken to prevent accidents, injuries, and hazards.
It involves identifying and assessing potential risks and implementing strategies to mitigate them.
Safety includes following protocols, guidelines, and regulations to ensure a secure environment.
Examples of safety measures include wearing personal protective equipment, maintaining fire extinguishers, conducting safety drills, and implement...read more
Q143. Billing & Cost Working for Organization
Billing and cost working is crucial for any organization to maintain financial stability.
Billing and cost working involves tracking expenses and revenue to ensure financial stability.
It includes creating invoices, managing accounts payable and receivable, and budgeting.
Effective billing and cost working can help identify areas for cost savings and improve profitability.
For example, implementing a new billing system that automates invoicing can reduce administrative costs.
Regu...read more
Q144. What is hazard
A hazard is a potential source of harm or danger that can cause injury, illness, or damage to property.
A hazard can be a physical, chemical, biological, or ergonomic factor that has the potential to cause harm.
Examples of hazards include fire, toxic chemicals, infectious diseases, and unsafe working conditions.
Hazards can be present in various environments such as workplaces, homes, and public spaces.
Identifying and assessing hazards is crucial in order to implement appropria...read more
Q145. How to use fire hydrant
A fire hydrant is used to access a water supply for firefighting purposes.
Locate the fire hydrant in the vicinity.
Remove the hydrant cap or cover.
Attach a fire hose to the outlet of the hydrant.
Open the hydrant valve to release water.
Control the flow of water using the hydrant valve.
Close the hydrant valve and remove the hose when finished.
Q146. What is development length
Development length is the minimum length of reinforcement required to transfer the stress between the concrete and the reinforcement.
Development length is determined by factors such as the type of reinforcement, concrete strength, and bond strength.
It is necessary to ensure that the reinforcement bars are properly embedded in the concrete to provide structural integrity.
The development length can vary depending on the design requirements and the specific project.
For example, ...read more
Q147. IS Code Mode of Measurements
IS Code Mode of Measurements refers to the Indian Standard code for measurement practices in construction projects.
IS Code Mode of Measurements is a set of guidelines provided by the Bureau of Indian Standards (BIS) for accurate measurement of quantities in construction projects.
These guidelines cover various aspects such as units of measurement, methods of measurement, and rules for taking measurements.
For example, IS 1200 provides guidelines for measurement of earthwork in ...read more
Q148. Which hight tower crane ancharing
The high tower crane anchoring depends on various factors such as the height of the building, wind speed, and crane capacity.
The anchoring system should be designed by a qualified engineer.
The anchoring points should be strong enough to withstand the weight and forces of the crane.
The crane should be anchored to the building at multiple points for stability.
The anchoring system should be regularly inspected and maintained.
Examples of anchoring systems include tie-backs, deadm...read more
Q149. What is the quality assurance
Quality assurance is a systematic process of ensuring that products or services meet specified requirements and standards.
Quality assurance involves creating and implementing processes and procedures to prevent defects and errors.
It includes activities such as quality planning, quality control, and quality improvement.
Quality assurance aims to provide confidence to stakeholders that the desired level of quality will be achieved.
It involves monitoring and evaluating processes ...read more
Q150. Design and functions of HVAC system.
HVAC system is designed to control temperature, humidity, and air quality in a building.
HVAC stands for Heating, Ventilation, and Air Conditioning.
It includes components such as air handlers, ductwork, filters, and thermostats.
The system works by circulating air through the building and adjusting temperature and humidity levels.
It also helps to remove pollutants and maintain air quality.
Examples of HVAC systems include central air conditioning, heat pumps, and rooftop units.
Q151. What ia rolling margin
Rolling margin is the difference between the selling price and the cost price of goods sold over a specific period of time.
Rolling margin helps in determining the profitability of a business over time.
It is calculated by subtracting the cost price from the selling price of goods sold.
For example, if the cost price of goods sold is $500 and the selling price is $700, the rolling margin would be $200.
Q152. What is yield of concrete
Yield of concrete refers to the amount of concrete produced from a mixture of cement, aggregates, and water.
Yield of concrete is typically measured in cubic meters or cubic yards.
It is important for estimating the amount of materials needed for a project.
Yield can be affected by factors such as mix design, water-cement ratio, and compaction.
For example, a concrete mix with a higher water-cement ratio may have a lower yield.
Calculating yield accurately is crucial for cost esti...read more
Q153. What is min coloumn width?
Min column width refers to the smallest width a column can be resized to in a table or spreadsheet.
Min column width prevents columns from becoming too narrow to display content properly.
It ensures readability and usability of the data in the table.
For example, in Microsoft Excel, the default min column width is 8.43 units.
Q154. AHU, FCU valve packages diagrams
AHU and FCU valve packages diagrams are used to control the flow of air and water in HVAC systems.
AHU and FCU valve packages are used to regulate the flow of air and water in HVAC systems
These diagrams show the location and type of valves used in the system
Valve packages can include control valves, isolation valves, and balancing valves
AHU valve packages may also include dampers for air flow control
FCU valve packages may include thermostatic valves for temperature control
Prop...read more
Q155. How to control inventory
Effective methods to control inventory include implementing inventory management software, conducting regular audits, setting reorder points, and utilizing just-in-time inventory.
Implementing inventory management software to track stock levels and streamline ordering processes
Conducting regular audits to identify discrepancies and prevent stockouts or overstocking
Setting reorder points to automatically replenish inventory when it reaches a certain level
Utilizing just-in-time ...read more
Q156. How to reduce non moving
Implementing strategies like ABC analysis, just-in-time inventory, and regular inventory audits can help reduce non-moving inventory.
Conduct an ABC analysis to categorize inventory based on value and prioritize management efforts.
Implement just-in-time inventory practices to reduce excess stock and minimize non-moving inventory.
Regularly review and update inventory levels to prevent overstocking and identify slow-moving items for promotion or clearance.
Utilize sales forecasti...read more
Q157. How to voltage calculation
Voltage calculation involves determining the potential difference between two points in an electrical circuit.
Voltage is measured in volts (V).
The formula to calculate voltage is V = IR, where V is voltage, I is current, and R is resistance.
Voltage can also be calculated using Ohm's Law: V = I x R.
Voltage can be determined using a voltmeter or by measuring the potential difference across a component.
Voltage calculations are essential in electrical engineering and troubleshoot...read more
Q158. Tell step by step process
The step by step process for a Civil Site Engineer involves planning, designing, and overseeing construction projects.
1. Conduct site investigations and surveys to determine project feasibility.
2. Develop project plans and specifications, including cost estimates and timelines.
3. Obtain necessary permits and approvals from local authorities.
4. Oversee construction activities to ensure compliance with design specifications.
5. Monitor project progress and address any issues tha...read more
Q159. Difference between MG and new SUV
MG and new SUV are two different car models from different brands.
MG is a brand of cars produced by the Chinese company SAIC Motor Corporation Limited, while new SUV could refer to any new SUV model from any brand.
MG cars are known for their affordability and fuel efficiency, while new SUVs may have different features and price points depending on the brand and model.
MG offers models such as the MG ZS EV and MG Hector, while new SUVs could include models such as the Toyota RA...read more
Q160. Detail process of building survey
The process of building survey involves several steps to assess the condition and suitability of a building.
Determine the purpose of the survey and the scope of work
Conduct a visual inspection of the building's exterior and interior
Identify any structural issues, such as cracks or signs of deterioration
Assess the building's systems, including electrical, plumbing, and HVAC
Evaluate the building's compliance with building codes and regulations
Document findings and prepare a det...read more
Q161. How many types of switchers
There are several types of switchers used in AV systems, including matrix switchers, presentation switchers, and video switchers.
Matrix switchers allow multiple input sources to be routed to multiple output displays.
Presentation switchers are designed for seamless switching between different presentation sources, such as laptops and tablets.
Video switchers are used to switch between different video sources, such as cameras and DVD players.
Q162. How much Negotiable CTC
The negotiable CTC depends on the job responsibilities and market standards.
Negotiable CTC is based on the job role and responsibilities.
It also depends on the market standards and company policies.
I am open to discussing the CTC based on the job offer and benefits package.
However, I would like to ensure that the compensation is fair and competitive.
I am looking for a long-term commitment and growth opportunities within the company.
Q163. Tell about planning process
The planning process involves setting goals, identifying resources, creating a timeline, and evaluating progress.
Setting clear and achievable goals
Identifying resources needed
Creating a timeline for tasks and deadlines
Evaluating progress and making adjustments as needed
Q164. Which model u purchased
I purchased a Dell Inspiron 15 laptop.
I chose the Dell Inspiron 15 model because of its high performance and durability.
It has a powerful processor and ample storage space for my work needs.
The laptop also has a sleek design and is lightweight, making it easy to carry around.
I purchased it from a local electronics store and got a good deal on it.
Overall, I am very satisfied with my purchase and would recommend it to others.
Q165. Soil properties
Q166. Offshore working experience
I have no offshore working experience.
Q167. You know SAP
Yes, I am familiar with SAP.
I have experience using SAP in my previous role as a Store Keeper.
I am proficient in using SAP's inventory management module to track and manage stock levels.
I can generate reports and analyze data using SAP to optimize inventory control.
I am familiar with SAP's procurement and purchasing functionalities.
I have received training on SAP and have a good understanding of its features and functionalities.
Q168. Checking process of reinforcement
Reinforcement checking process involves verifying the placement, size, and spacing of steel bars in concrete structures.
Verify the correct size and grade of reinforcement bars as per design drawings
Check the spacing between bars to ensure they meet the specified requirements
Inspect the placement of bars to ensure they are properly aligned and secured in position
Use tools like measuring tape, rebar locator, and cover meters for accurate verification
Document any deviations or d...read more
Q169. How to calculated pump head
Pump head is calculated by adding the static head, friction head, and velocity head.
Calculate the static head by measuring the vertical distance between the pump centerline and the highest point of the system.
Calculate the friction head by considering the pipe length, diameter, roughness, and flow rate.
Calculate the velocity head by using the formula: V^2 / (2g), where V is the velocity of the fluid and g is the acceleration due to gravity.
Add the static head, friction head, ...read more
Q170. Safety Engineer role of responsible
Safety Engineers are responsible for ensuring the safety of workers and compliance with safety regulations in the workplace.
Developing and implementing safety policies and procedures
Conducting safety inspections and audits
Investigating accidents and incidents to determine root causes
Providing safety training to employees
Ensuring compliance with OSHA and other safety regulations
Q171. Pump suction and discharge diagram
A pump suction and discharge diagram shows the flow of fluid through a pump system.
The suction side of the pump is where the fluid enters the pump.
The discharge side of the pump is where the fluid exits the pump.
The diagram typically includes valves, pipes, and other components of the pump system.
The diagram may also show the direction of flow and the pressure at various points in the system.
Q172. Structure building details and process
Structure building involves planning, designing, and constructing buildings or other structures.
Structural analysis and design are key components
Materials selection is crucial for durability and strength
Construction process includes site preparation, foundation laying, framing, and finishing
Quality control and safety measures must be implemented throughout the process
Q173. Difference between FIDIC & CPWD Contracts.
Q174. Do you have SAP knowledge
Yes, I have intermediate level SAP knowledge.
I have experience using SAP for financial reporting and analysis
I am familiar with SAP modules such as FI (Financial Accounting) and CO (Controlling)
I have used SAP for budgeting and forecasting purposes
Q175. Y spcl instead of L&T
Y spcl is used instead of L&T as a shorthand in quality control to indicate a special characteristic.
Y spcl is a common abbreviation used in quality control to denote a special characteristic of a product or process.
L&T stands for Length and Tolerance, while Y spcl is used to highlight a specific feature that requires special attention.
For example, a product may have a Y spcl designation if it requires a unique material or manufacturing process to meet quality standards.
Q176. What is supply chain
A supply chain is a network of organizations involved in the process of producing and delivering a product or service to the end customer.
Involves all stages from raw material sourcing to final delivery
Includes suppliers, manufacturers, distributors, retailers, and customers
Focuses on efficiency, cost-effectiveness, and customer satisfaction
Q177. what is a civil line
A civil line refers to the underground network of pipes and cables that provide essential services to a community.
It includes water supply lines, sewage pipes, gas lines, and electrical cables.
Civil lines are usually located beneath roads and sidewalks.
Maintenance and repair of civil lines are crucial to ensure uninterrupted services to the community.
Civil supervisors are responsible for overseeing the installation and maintenance of civil lines.
Examples of civil line project...read more
Q178. FCU connection diagram
FCU connection diagram shows the connections between the fan coil unit and other components in the HVAC system.
FCU connection diagram typically includes the connections for power supply, control signals, and refrigerant lines.
The diagram may also show the connections for ductwork, sensors, and valves.
Examples of components that may be connected to the FCU include the air handling unit, chiller, and thermostat.
The FCU connection diagram is important for ensuring proper install...read more
Q179. Grade of concrete for minimum
The minimum grade of concrete depends on the intended use and structural requirements.
The minimum grade of concrete is typically specified by the engineer or architect based on the project's needs.
For general construction purposes, the minimum grade of concrete is often specified as M20, which means it has a compressive strength of 20 megapascals (MPa) after 28 days.
However, for specialized applications such as high-rise buildings or heavy industrial structures, higher grades...read more
Q180. Able to handle the pressure
Yes, I am able to handle pressure effectively by staying organized, prioritizing tasks, and maintaining a positive attitude.
I stay organized by creating to-do lists and setting realistic deadlines for tasks
I prioritize tasks based on deadlines and importance to ensure timely completion
I maintain a positive attitude by focusing on solutions rather than problems and seeking support from colleagues when needed
Q181. You controlling all site lights
Q182. What is AV systems.
AV systems refer to audiovisual systems that combine audio and visual components to create a multimedia experience.
AV systems include equipment such as projectors, screens, speakers, microphones, and control systems.
They are used in various settings like conference rooms, classrooms, theaters, and live events.
AV systems can be integrated with other technologies like video conferencing, streaming services, and interactive displays.
Q183. What is the ld
ld is a linker command in Unix-like operating systems that combines object files to create an executable or shared library.
ld stands for Linker Directive.
It is a command-line utility used in Unix-like systems to link object files and libraries.
ld combines object files and resolves symbols to create an executable or shared library.
It is often used in conjunction with the gcc compiler to create executables.
Example: ld -o output_file input_file1.o input_file2.o -l library_name
Q184. What is Lap zone
Lap zone is a term used in the field of electronics to refer to the area on a printed circuit board where the leads of electronic components are soldered.
Lap zone is the area on a PCB where components are soldered
It is the region where the leads of electronic components are attached to the PCB
The lap zone is crucial for ensuring proper electrical connections and mechanical stability
Soldering techniques and materials are used in the lap zone to create reliable connections
Examp...read more
Q185. Ratio of m25 concrete
The ratio of M25 concrete is 1:1:2 (cement:sand:aggregate)
The ratio of M25 concrete is 1:1:2, which means 1 part cement, 1 part sand, and 2 parts aggregate.
This ratio is commonly used in construction for medium strength concrete.
For example, to make 1 cubic meter of M25 concrete, you would need 1/4 cubic meters of cement, 1/4 cubic meters of sand, and 1/2 cubic meters of aggregate.
Q186. Billing is code
Billing is the process of generating invoices for goods or services provided.
Billing involves calculating costs, creating invoices, and sending them to customers.
It is important for tracking revenue and ensuring timely payment.
Examples of billing software include QuickBooks, FreshBooks, and Zoho Invoice.
Q187. Wms of all activities
The question is asking for the Wms of all activities.
Wms stands for Work Measurement System, which is a method used to measure the time and effort required for different activities.
The answer should provide the Wms values for each activity mentioned.
Example: Activity 1 - 5.2 Wms, Activity 2 - 3.8 Wms, Activity 3 - 6.1 Wms
Q188. All types drawing handling
Handling all types of drawings involves understanding different drawing formats, scales, symbols, and techniques.
Familiarity with various drawing formats such as orthographic, isometric, and perspective drawings
Ability to work with different scales and units of measurement
Understanding of drawing symbols and conventions used in engineering and architecture
Proficiency in CAD software for creating and editing drawings
Knowledge of different techniques for dimensioning, sectionin...read more
Q189. Explain full P2P
Full P2P refers to the entire procurement process from requisition to payment.
Full P2P involves the entire procurement process including requisition, sourcing, purchase order creation, invoice processing, and payment.
It starts with a requisition from the user and ends with payment to the supplier.
It includes supplier selection, negotiation, and contract management.
It also involves receiving and inspection of goods and services.
Examples of P2P software include SAP Ariba, Coupa...read more
Q190. Welding types and functions
Welding types include MIG, TIG, stick, and flux-cored, each with specific functions in joining metal pieces.
MIG (Metal Inert Gas) welding uses a wire electrode and shielding gas to join metals like steel and aluminum.
TIG (Tungsten Inert Gas) welding uses a tungsten electrode and inert gas to create a precise, clean weld on thin materials like stainless steel.
Stick welding, also known as Shielded Metal Arc Welding (SMAW), uses a flux-coated electrode to create strong welds on ...read more
Q191. Create a model in bim
To create a BIM model, start by defining the project scope and requirements. Then, use BIM software to create a 3D model with accurate data and information.
Define project scope and requirements
Choose appropriate BIM software
Create 3D model with accurate data and information
Collaborate with team members to ensure accuracy
Continuously update and maintain the model throughout the project
Q192. Standard operating procedures
Standard operating procedures are established guidelines for carrying out routine operations in an organization.
Standard operating procedures outline step-by-step instructions for completing tasks.
They ensure consistency, efficiency, and quality in operations.
Examples include procedures for handling contracts, resolving disputes, and managing vendor relationships.
Q193. Achived Great Target
Yes, I have achieved great targets in my previous roles.
In my previous role as Sales Manager, I exceeded the sales target by 20% in the first quarter.
I implemented a new marketing strategy that resulted in a 30% increase in customer acquisition.
I led a team that successfully launched a new product line, which generated $1 million in revenue within the first month.
Q194. Name of the client
The name of the client is XYZ Construction Company.
XYZ Construction Company is a well-known construction firm in the region.
They have completed several projects in the past, including the construction of a new office building in downtown.
The client has a reputation for high-quality work and timely project completion.
Q195. Current location
I am currently located in New York City.
New York City
NYC
East Coast
Q196. Nature of duty.
The nature of duty for a project engineer involves planning, coordinating, and overseeing various aspects of a project.
Planning and organizing project activities
Coordinating with team members and stakeholders
Managing project timelines and budgets
Ensuring compliance with project specifications and regulations
Monitoring project progress and resolving issues
Preparing project reports and documentation
Q197. Maintain a ledger
Maintaining a ledger involves recording financial transactions in a systematic manner.
Record all income and expenses accurately
Ensure entries are categorized correctly
Balance the ledger regularly to check for errors
Use accounting software or templates for efficiency
Q198. Present Company name
ABC Construction Company
ABC Construction Company specializes in civil engineering projects
The company has completed projects such as road construction, bridge building, and land development
ABC Construction Company has a strong reputation for delivering high-quality work on time and within budget