Upload Button Icon Add office photos

Filter interviews by

Shapoorji Pallonji Group Interview Questions, Process, and Tips

Updated 6 Mar 2025

Top Shapoorji Pallonji Group Interview Questions and Answers

View all 209 questions

Shapoorji Pallonji Group Interview Experiences

Popular Designations

330 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
No response

I was interviewed in Sep 2024.

Round 1 - Group Discussion 

Shapoorji Pallonji Dualis Sector 46 Gurgaon is luxury project

Round 2 - Group Discussion 

Shapoorji Pallonji Sector 46 New Launch offers luxury apartments with world-class amenities. check details

Round 3 - Assignment 

Shapoorji Pallonji Dualis Sector 46 is more than just a residential project; it’s a gateway to a better way of living. Here’s why this development is creating waves in Gurgaon:

Interview Preparation Tips

Interview preparation tips for other job seekers - Situated in Sector 46 Gurgaon, Shapoorji Pallonji Dualis enjoys a prime location that offers easy access to major business hubs, educational institutions, healthcare facilities, and entertainment zones. Whether you work in Cyber City or frequently visit Delhi, the connectivity from this location is unmatched.
-----

Sales Officer Interview Questions asked at other Companies

Q1. Amit What is Cross sale tell me The Types of Cross sales
View answer (29)
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Ratio of m25 concrete
  • Ans. 

    The ratio of M25 concrete is 1:1:2 (cement:sand:aggregate)

    • The ratio of M25 concrete is 1:1:2, which means 1 part cement, 1 part sand, and 2 parts aggregate.

    • This ratio is commonly used in construction for medium strength concrete.

    • For example, to make 1 cubic meter of M25 concrete, you would need 1/4 cubic meters of cement, 1/4 cubic meters of sand, and 1/2 cubic meters of aggregate.

  • Answered by AI
  • Q2. Per cum brick qty.
Round 2 - Technical 

(2 Questions)

  • Q1. What is your responsibility previous company name
  • Ans. 

    As an Assistant Engineer - Civil at my previous company, my responsibilities included assisting senior engineers in project planning, design, and construction.

    • Assisted senior engineers in project planning and design

    • Participated in site visits and inspections

    • Prepared project reports and documentation

    • Collaborated with team members and contractors

    • Ensured compliance with safety regulations and quality standards

  • Answered by AI
  • Q2. What is your responsibility previous company site Role.
  • Ans. 

    Managed site operations, coordinated with contractors, ensured compliance with safety regulations.

    • Managed day-to-day site operations

    • Coordinated with contractors for timely completion of projects

    • Ensured compliance with safety regulations and quality standards

    • Prepared progress reports and communicated with stakeholders

    • Implemented cost-saving measures without compromising quality

  • Answered by AI
Round 3 - One-on-one 

(1 Question)

  • Q1. Name of the client
  • Ans. 

    The name of the client is XYZ Construction Company.

    • XYZ Construction Company is a well-known construction firm in the region.

    • They have completed several projects in the past, including the construction of a new office building in downtown.

    • The client has a reputation for high-quality work and timely project completion.

  • Answered by AI

Assistant Engineer - Civil Interview Questions asked at other Companies

Q1. If the cubes are failed then what will you do ?
View answer (7)
Shapoorji Pallonji Group Interview Questions and Answers for Freshers
illustration image
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Apr 2024. There was 1 interview round.

Round 1 - Technical 

(22 Questions)

  • Q1. Service and brekdown
  • Q2. Oil, service and P D A
  • Q3. Excavator and hydrulic
  • Q4. Service and maintenance
  • Q5. How guide for customer, and how problems solved
  • Ans. 

    I guide customers through troubleshooting steps and work with them to solve technical problems efficiently.

    • Listen to the customer's issue and ask clarifying questions to understand the problem

    • Provide clear instructions and guidance on troubleshooting steps

    • Demonstrate patience and empathy while working with the customer

    • Offer alternative solutions if initial troubleshooting steps do not resolve the issue

    • Follow up with th...

  • Answered by AI
  • Q6. Communication skills
  • Q7. And teamwork is most important
  • Q8. I lerned more more experience
  • Q9. How growth the marketing
  • Ans. 

    Marketing growth can be achieved through various strategies such as digital marketing, social media campaigns, partnerships, and targeted advertising.

    • Utilize digital marketing channels such as SEO, SEM, and email marketing to reach a wider audience

    • Create engaging social media campaigns to increase brand awareness and attract new customers

    • Form partnerships with complementary businesses to expand reach and access new mar...

  • Answered by AI
  • Q10. I have more improve for my self
  • Q11. Create a more new things
  • Q12. All or equalitys
  • Q13. Going on good things
  • Q14. Good relationship or stuffs and customer
  • Q15. I lerned the more knowledge
  • Q16. Target the goals
  • Q17. Displane the work and
  • Q18. Efforts for work
  • Q19. Managing the all problms
  • Q20. Work is my passion
  • Q21. All employees my family
  • Q22. This is my passion and profession

Interview Preparation Tips

Interview preparation tips for other job seekers - Hydrulic pump, track motor,swing motor,speedmeter dumping controls,

Service Engineer Interview Questions asked at other Companies

Q1. What are the compulsory policy excess in four wheeler private vehicles?
View answer (12)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com

Round 1 - Aptitude Test 

Very typical aptitude test complete on timely.

Round 2 - Technical 

(2 Questions)

  • Q1. Hazard Identification Risk Assessments
  • Q2. Safety Act & Rules

Interview Preparation Tips

Interview preparation tips for other job seekers - To attend interview keep calm and focus interviewers questions

Senior HSE Officer Interview Questions asked at other Companies

Q1. How many meters minimum distance to allowed mechanical excavation to use near the underground electrical cable
View answer (1)

Shapoorji Pallonji Group interview questions for popular designations

 Graduate Engineer Trainee (Get)

 (16)

 Senior Engineer

 (10)

 Deputy Manager

 (9)

 Billing Engineer

 (7)

 Electrical Engineer

 (6)

 Senior Civil Engineer

 (6)

 Civil Engineer

 (6)

 Construction Engineer

 (6)

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is the responsibility of document controller?
  • Ans. 

    Document controllers are responsible for managing and organizing company documents.

    • Maintaining and updating documents in an organized manner

    • Ensuring all documents are properly classified and stored

    • Controlling the distribution of documents to the relevant parties

    • Tracking revisions and updates to documents

    • Ensuring compliance with document management policies and procedures

  • Answered by AI
  • Q2. How many type of bill?
  • Ans. 

    There are two main types of bills: a bill of exchange and a bill of lading.

    • Bill of exchange is a written order by one party to another to pay a certain sum of money on a specific date.

    • Bill of lading is a document issued by a carrier to acknowledge receipt of goods for shipment.

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Shapoorji Pallonji Group Document Controller interview:
  • EDMS
  • SAP
  • ACONEX

Document Controller Interview Questions asked at other Companies

Q1. How many Engineering Documents will be process if you handle EPC project?
View answer (4)

Get interview-ready with Top Shapoorji Pallonji Group Interview Questions

Interview Questions & Answers

user image Anonymous

posted on 14 Jan 2025

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Concrete how much tipe, what is your quality Finishing work block,, gypsum,bond, election pipe.any more
  • Ans. 

    My experience includes working with various types of concrete, ensuring high quality finishing work on blocks, gypsum, bond, and electrical pipes.

    • I have experience working with different types of concrete mixes, such as ready-mix and site-mix.

    • I prioritize quality finishing work on various materials like blocks, gypsum, bond, and electrical pipes.

    • I am familiar with techniques for ensuring proper bonding and sealing of m...

  • Answered by AI

Jobs at Shapoorji Pallonji Group

View all
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(3 Questions)

  • Q1. Senior architectural draughtsman
  • Q2. All types drawing handling
  • Ans. 

    Handling all types of drawings involves understanding different drawing formats, scales, symbols, and techniques.

    • Familiarity with various drawing formats such as orthographic, isometric, and perspective drawings

    • Ability to work with different scales and units of measurement

    • Understanding of drawing symbols and conventions used in engineering and architecture

    • Proficiency in CAD software for creating and editing drawings

    • Kno...

  • Answered by AI
  • Q3. Archicad cad 3D model

Interview Preparation Tips

Interview preparation tips for other job seekers - I am working architectural draughtsman
India uae Saudi Arabia Libya also work big project please if any opening please kindly inform

Senior Draughtsman Interview Questions asked at other Companies

Q1. Draw beam BBS with sufficient lapping zone and sufficient bar length as site required
View answer (1)

Electrician Interview Questions & Answers

user image Anonymous

posted on 1 May 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website

Round 1 - Aptitude Test 

Electrician test and all questions

Round 2 - Technical 

(3 Questions)

  • Q1. 2 way wairing And all electrical work
  • Q2. 2 way and light and wairing and Earth and all
  • Q3. Electrical all questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Electrician maintenance

Electrician Interview Questions asked at other Companies

Q1. 1. How much current takes a 5hp motor ?, 2. Draw a STAR DELTA and DOL starter control wireing. 3. How to connect star connection, and DELTA connectin. 4. What is the kw of 30hp motor ?, 5. Can you connect a temperature controller ?, 6. What... read more
View answer (5)
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Python question for data cleaning
  • Q2. Sql question on data manipulation

Data Scientist Interview Questions asked at other Companies

Q1. for a data with 1000 samples and 700 dimensions, how would you find a line that best fits the data, to be able to extrapolate? this is not a supervised ML problem, there's no target. and how would you do it, if you want to treat this as a s... read more
View answer (5)
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. How to calculated pump head
  • Ans. 

    Pump head is calculated by adding the static head, friction head, and velocity head.

    • Calculate the static head by measuring the vertical distance between the pump centerline and the highest point of the system.

    • Calculate the friction head by considering the pipe length, diameter, roughness, and flow rate.

    • Calculate the velocity head by using the formula: V^2 / (2g), where V is the velocity of the fluid and g is the accele...

  • Answered by AI
  • Q2. How to oprate the fire alaram system
  • Ans. 

    To operate the fire alarm system, follow these steps: activate the alarm, evacuate the building, and wait for emergency responders.

    • Activate the fire alarm by pulling the nearest alarm pull station or pressing the alarm button.

    • Evacuate the building immediately using the nearest exit and do not use elevators.

    • Wait for emergency responders to arrive and provide them with any relevant information about the situation.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - If existing staff learn to junior company growth will not held up

Project Engineer Interview Questions asked at other Companies

Q1. Triangle Star Pattern Task Your task is to print a triangle pattern using stars (*) for a given integer N, which represents the number of rows. Input: Integer N (Total number of rows) Output: The triangle pattern printed over N lines Exampl... read more
View answer (11)
Contribute & help others!
anonymous
You can choose to be anonymous

Shapoorji Pallonji Group Interview FAQs

How many rounds are there in Shapoorji Pallonji Group interview?
Shapoorji Pallonji Group interview process usually has 2-3 rounds. The most common rounds in the Shapoorji Pallonji Group interview process are Technical, Resume Shortlist and HR.
How to prepare for Shapoorji Pallonji Group interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Shapoorji Pallonji Group. The most common topics and skills that interviewers at Shapoorji Pallonji Group expect are Project Management, High Rise Building, Planning, MEP and Execution.
What are the top questions asked in Shapoorji Pallonji Group interview?

Some of the top questions asked at the Shapoorji Pallonji Group interview -

  1. What is Escalation and what is the significance of this? What is the formula to...read more
  2. What are the different types of concre...read more
  3. What is ATS, transformer maintenance procedure, protection of transformer, main...read more
How long is the Shapoorji Pallonji Group interview process?

The duration of Shapoorji Pallonji Group interview process can vary, but typically it takes about less than 2 weeks to complete.

Recently Viewed

PHOTOS

InsuranceDekho

3 office photos

LIST OF COMPANIES

Credit Bajaar

Overview

INTERVIEWS

Mahindra Finance

No Interviews

COMPANY BENEFITS

Bosch Global Software Technologies

No Benefits

INTERVIEWS

Birla Group

No Interviews

DESIGNATION

DESIGNATION

Tell us how to improve this page.

Shapoorji Pallonji Group Interview Process

based on 314 interviews

Interview experience

4.3
  
Good
View more

Interview Questions from Similar Companies

Tata Group Interview Questions
4.2
 • 358 Interviews
Adani Group Interview Questions
3.9
 • 187 Interviews
Piramal Group Interview Questions
3.9
 • 62 Interviews
Essar Group Interview Questions
3.7
 • 28 Interviews
Birla Group Interview Questions
4.2
 • 11 Interviews
View all

Shapoorji Pallonji Group Reviews and Ratings

based on 4.7k reviews

4.1/5

Rating in categories

3.9

Skill development

4.0

Work-life balance

3.7

Salary

4.2

Job security

3.9

Company culture

3.4

Promotions

3.9

Work satisfaction

Explore 4.7k Reviews and Ratings
Engineer/Senior Engineer - Formwork

Navi Mumbai,

Mumbai

8-13 Yrs

₹ 5.13-11 LPA

Safety Officer/Safety Engineer

Bangalore / Bengaluru

5-10 Yrs

Not Disclosed

Quantity Surveyor Required at Chennai

Chennai

3-8 Yrs

₹ 3-6.5 LPA

Explore more jobs
Deputy Manager
603 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
427 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Construction Engineer
292 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Site Engineer
228 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Supervisor
223 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Shapoorji Pallonji Group with

Tata Group

4.2
Compare

Reliance Industries

4.0
Compare

Adani Group

3.9
Compare

Mahindra & Mahindra

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview
Rate your experience using AmbitionBox
Terrible
Terrible
Poor
Poor
Average
Average
Good
Good
Excellent
Excellent