Filter interviews by
Bearing capacity of soil can be increased by improving soil compaction, adding reinforcement, or using ground improvement techniques.
Improving soil compaction by using heavy machinery or adding water to the soil
Adding reinforcement such as geotextiles or geogrids to increase soil strength
Using ground improvement techniques such as soil stabilization or deep soil mixing
Replacing weak soil with stronger soil or usin...
Development length is provided to ensure proper bonding between reinforcement and concrete.
Development length is the length of reinforcement bar required to transfer the stress from steel to concrete.
It is provided to ensure that the reinforcement bar is properly bonded with the concrete.
The development length depends on the diameter of the bar, the grade of the steel, and the strength of the concrete.
If the devel...
The amount of steel needed for a 1000sqft slab depends on the thickness of the slab and the spacing of the steel bars.
The thickness of the slab will determine the amount of steel needed.
The spacing of the steel bars will also affect the amount of steel needed.
A typical 4-inch thick slab may require around 100-120 steel bars per 1000sqft.
The size and type of steel bars used will also impact the amount needed.
BOQ stands for Bill of Quantities, which is a document that lists all the materials, labor, and equipment needed for a construction project.
BOQ is a detailed document that helps in estimating the cost of a construction project.
It includes a list of all the materials, equipment, and labor required for the project.
BOQ is prepared by a quantity surveyor or an estimator.
It helps in comparing the actual cost of the pro...
Putty work involves filling gaps and cracks in walls to create a smooth surface for painting or wallpapering.
Clean the surface to be puttied
Apply putty to the gaps and cracks using a putty knife
Smooth out the putty with a wet sponge or sandpaper
Allow the putty to dry completely before painting or wallpapering
Repeat the process if necessary for a smooth finish
Development length is the minimum length of reinforcement required to transfer the stress from steel to concrete.
It is the length of the bar required to be embedded in the concrete to transfer the stress.
It depends on the diameter of the bar, type of concrete, and the bond strength between steel and concrete.
It is calculated using the formula Ld = (φ × fy × As) / (4 × τbd × σst)
For example, for a 20mm diameter bar...
Puff panel is a type of insulated panel made of two metal sheets with a foam core in between.
Puff panels are commonly used in construction for walls, roofs, and ceilings.
They provide excellent insulation and are lightweight, making them easy to install.
Puff panels are also fire-resistant and have good sound insulation properties.
Examples of applications include cold storages, clean rooms, and industrial buildings.
Soil stabilization is the process of improving the engineering properties of soil to increase its strength and durability.
It involves adding materials to the soil to improve its properties
Common materials used for soil stabilization include cement, lime, and fly ash
Soil stabilization is often used in construction projects to improve the stability of the ground
It can also be used to prevent soil erosion and improve...
A cement bag typically measures 20 inches in height, 16 inches in width, and 4 inches in depth.
The dimensions of a cement bag may vary slightly depending on the manufacturer.
The weight of a cement bag is usually 50 kg or 110 lbs.
Cement bags are made of paper or plastic and are designed to be durable and moisture-resistant.
Modular bricks come in various dimensions depending on the manufacturer and intended use.
Modular bricks are typically 3 5/8 inches tall by 2 1/4 inches wide by 7 5/8 inches long.
Other common sizes include 2 1/4 x 3 5/8 x 7 5/8 inches and 2 1/4 x 3 5/8 x 11 5/8 inches.
Some manufacturers may offer custom sizes or shapes for specific projects.
The dimensions of modular bricks are important for determining the amount n...
As a Project Executive Engineer, I managed engineering projects, ensuring timely delivery and adherence to quality standards.
Project Management: Led multiple engineering projects from inception to completion, ensuring they met scope, budget, and timeline requirements.
Team Coordination: Collaborated with cross-functional teams, including architects and contractors, to streamline project execution and resolve issues.
Qual...
I bring a unique blend of technical expertise, leadership skills, and a proven track record in project management to drive success.
Extensive Experience: I have over 10 years of experience in engineering projects, successfully managing teams and delivering projects on time and within budget.
Leadership Skills: I have led cross-functional teams in complex projects, such as the construction of a multi-million dollar infras...
Development length is the minimum length of reinforcement required to transfer the stress from steel to concrete.
It is the length of the bar required to be embedded in the concrete to transfer the stress.
It depends on the diameter of the bar, type of concrete, and the bond strength between steel and concrete.
It is calculated using the formula Ld = (φ × fy × As) / (4 × τbd × σst)
For example, for a 20mm diameter bar in M...
Development length is provided to ensure proper bonding between reinforcement and concrete.
Development length is the length of reinforcement bar required to transfer the stress from steel to concrete.
It is provided to ensure that the reinforcement bar is properly bonded with the concrete.
The development length depends on the diameter of the bar, the grade of the steel, and the strength of the concrete.
If the developmen...
Modular bricks come in various dimensions depending on the manufacturer and intended use.
Modular bricks are typically 3 5/8 inches tall by 2 1/4 inches wide by 7 5/8 inches long.
Other common sizes include 2 1/4 x 3 5/8 x 7 5/8 inches and 2 1/4 x 3 5/8 x 11 5/8 inches.
Some manufacturers may offer custom sizes or shapes for specific projects.
The dimensions of modular bricks are important for determining the amount needed...
A cement bag typically measures 20 inches in height, 16 inches in width, and 4 inches in depth.
The dimensions of a cement bag may vary slightly depending on the manufacturer.
The weight of a cement bag is usually 50 kg or 110 lbs.
Cement bags are made of paper or plastic and are designed to be durable and moisture-resistant.
Soil stabilization is the process of improving the engineering properties of soil to increase its strength and durability.
It involves adding materials to the soil to improve its properties
Common materials used for soil stabilization include cement, lime, and fly ash
Soil stabilization is often used in construction projects to improve the stability of the ground
It can also be used to prevent soil erosion and improve the ...
Bearing capacity of soil can be increased by improving soil compaction, adding reinforcement, or using ground improvement techniques.
Improving soil compaction by using heavy machinery or adding water to the soil
Adding reinforcement such as geotextiles or geogrids to increase soil strength
Using ground improvement techniques such as soil stabilization or deep soil mixing
Replacing weak soil with stronger soil or using pil...
The amount of steel needed for a 1000sqft slab depends on the thickness of the slab and the spacing of the steel bars.
The thickness of the slab will determine the amount of steel needed.
The spacing of the steel bars will also affect the amount of steel needed.
A typical 4-inch thick slab may require around 100-120 steel bars per 1000sqft.
The size and type of steel bars used will also impact the amount needed.
BOQ stands for Bill of Quantities, which is a document that lists all the materials, labor, and equipment needed for a construction project.
BOQ is a detailed document that helps in estimating the cost of a construction project.
It includes a list of all the materials, equipment, and labor required for the project.
BOQ is prepared by a quantity surveyor or an estimator.
It helps in comparing the actual cost of the project ...
Puff panel is a type of insulated panel made of two metal sheets with a foam core in between.
Puff panels are commonly used in construction for walls, roofs, and ceilings.
They provide excellent insulation and are lightweight, making them easy to install.
Puff panels are also fire-resistant and have good sound insulation properties.
Examples of applications include cold storages, clean rooms, and industrial buildings.
Putty work involves filling gaps and cracks in walls to create a smooth surface for painting or wallpapering.
Clean the surface to be puttied
Apply putty to the gaps and cracks using a putty knife
Smooth out the putty with a wet sponge or sandpaper
Allow the putty to dry completely before painting or wallpapering
Repeat the process if necessary for a smooth finish
Top trending discussions
I applied via Company Website and was interviewed before Jun 2021. There were 2 interview rounds.
First round was coding as well as aptitude done together went well I guess focusing on codes helps a lot.
I applied via Naukri.com
I expect Amazon to foster innovation, provide growth opportunities, and maintain a customer-centric culture.
Opportunities for professional development, such as training programs and mentorship.
A collaborative work environment that encourages teamwork and idea sharing.
Access to cutting-edge technology and resources to drive innovation.
A strong focus on customer satisfaction, ensuring that every decision prioritizes the ...
I applied via Recruitment Consulltant and was interviewed before Jul 2021. There was 1 interview round.
Experienced professional with a strong educational background and clear career ambitions, eager to contribute to the company's success.
I have over 5 years of experience in project management, leading teams to successfully deliver complex projects on time.
I hold a Master's degree in Business Administration from XYZ University, where I specialized in strategic management.
My family has always emphasized the importance of ...
I applied via Naukri.com and was interviewed before Feb 2020. There were 3 interview rounds.
Workflow, trigger, reports, roles, profiles, permission set, and sharing rules are all important features in Salesforce.
Workflow is a series of automated steps that can be used to streamline business processes.
Triggers are used to execute code before or after a record is inserted, updated, or deleted.
Reports are used to display data in a visual format, such as a table or chart.
Roles are used to define the hierarchy of ...
I appeared for an interview before Jul 2020.
Yes, Infosys is listed on the Indian stock exchanges as well as on the NYSE.
Infosys is listed on the Bombay Stock Exchange (BSE) and National Stock Exchange of India (NSE)
It is also listed on the New York Stock Exchange (NYSE)
Infosys has a market capitalization of over $80 billion as of 2021
Interview questions for an Associate position cover various aspects like motivation, skills, and handling pressure.
1) Tmaus: This could refer to a specific term or acronym; clarify its meaning during the interview.
2) Leaving previous job: Focus on seeking new challenges or growth opportunities, not negative experiences.
3) Technical skills: Highlight relevant skills like data analysis, programming languages, or software...
I applied via Job Fair and was interviewed before Feb 2021. There were 2 interview rounds.
based on 2 reviews
Rating in categories
Store Keeper
3
salaries
| ₹2.5 L/yr - ₹2.5 L/yr |
Biomedical Service Engineer
3
salaries
| ₹2.8 L/yr - ₹4.1 L/yr |
TCS
Accenture
Wipro
Cognizant