Bearing capacity of soil can be increased by improving soil compaction, adding reinforcement, or using ground improvement techniques.
Improving soil compaction by using heavy machinery or adding water to the soil
Adding reinforcement such as geotextiles or geogrids to increase soil strength
Using ground improvement techniques such as soil stabilization or deep soil mixing
Replacing weak soil with stronger soil or usin...
Development length is provided to ensure proper bonding between reinforcement and concrete.
Development length is the length of reinforcement bar required to transfer the stress from steel to concrete.
It is provided to ensure that the reinforcement bar is properly bonded with the concrete.
The development length depends on the diameter of the bar, the grade of the steel, and the strength of the concrete.
If the devel...
The amount of steel needed for a 1000sqft slab depends on the thickness of the slab and the spacing of the steel bars.
The thickness of the slab will determine the amount of steel needed.
The spacing of the steel bars will also affect the amount of steel needed.
A typical 4-inch thick slab may require around 100-120 steel bars per 1000sqft.
The size and type of steel bars used will also impact the amount needed.
BOQ stands for Bill of Quantities, which is a document that lists all the materials, labor, and equipment needed for a construction project.
BOQ is a detailed document that helps in estimating the cost of a construction project.
It includes a list of all the materials, equipment, and labor required for the project.
BOQ is prepared by a quantity surveyor or an estimator.
It helps in comparing the actual cost of the pro...
Putty work involves filling gaps and cracks in walls to create a smooth surface for painting or wallpapering.
Clean the surface to be puttied
Apply putty to the gaps and cracks using a putty knife
Smooth out the putty with a wet sponge or sandpaper
Allow the putty to dry completely before painting or wallpapering
Repeat the process if necessary for a smooth finish
Development length is the minimum length of reinforcement required to transfer the stress from steel to concrete.
It is the length of the bar required to be embedded in the concrete to transfer the stress.
It depends on the diameter of the bar, type of concrete, and the bond strength between steel and concrete.
It is calculated using the formula Ld = (φ × fy × As) / (4 × τbd × σst)
For example, for a 20mm diameter bar...
Puff panel is a type of insulated panel made of two metal sheets with a foam core in between.
Puff panels are commonly used in construction for walls, roofs, and ceilings.
They provide excellent insulation and are lightweight, making them easy to install.
Puff panels are also fire-resistant and have good sound insulation properties.
Examples of applications include cold storages, clean rooms, and industrial buildings.
Soil stabilization is the process of improving the engineering properties of soil to increase its strength and durability.
It involves adding materials to the soil to improve its properties
Common materials used for soil stabilization include cement, lime, and fly ash
Soil stabilization is often used in construction projects to improve the stability of the ground
It can also be used to prevent soil erosion and improve...
A cement bag typically measures 20 inches in height, 16 inches in width, and 4 inches in depth.
The dimensions of a cement bag may vary slightly depending on the manufacturer.
The weight of a cement bag is usually 50 kg or 110 lbs.
Cement bags are made of paper or plastic and are designed to be durable and moisture-resistant.
Modular bricks come in various dimensions depending on the manufacturer and intended use.
Modular bricks are typically 3 5/8 inches tall by 2 1/4 inches wide by 7 5/8 inches long.
Other common sizes include 2 1/4 x 3 5/8 x 7 5/8 inches and 2 1/4 x 3 5/8 x 11 5/8 inches.
Some manufacturers may offer custom sizes or shapes for specific projects.
The dimensions of modular bricks are important for determining the amount n...
As a Project Executive Engineer, I managed engineering projects, ensuring timely delivery and adherence to quality standards.
Project Management: Led multiple engineering projects from inception to completion, ensuring they met scope, budget, and timeline requirements.
Team Coordination: Collaborated with cross-functional teams, including architects and contractors, to streamline project execution and resolve issues.
Qual...
I bring a unique blend of technical expertise, leadership skills, and a proven track record in project management to drive success.
Extensive Experience: I have over 10 years of experience in engineering projects, successfully managing teams and delivering projects on time and within budget.
Leadership Skills: I have led cross-functional teams in complex projects, such as the construction of a multi-million dollar infras...
Development length is the minimum length of reinforcement required to transfer the stress from steel to concrete.
It is the length of the bar required to be embedded in the concrete to transfer the stress.
It depends on the diameter of the bar, type of concrete, and the bond strength between steel and concrete.
It is calculated using the formula Ld = (φ × fy × As) / (4 × τbd × σst)
For example, for a 20mm diameter bar in M...
Development length is provided to ensure proper bonding between reinforcement and concrete.
Development length is the length of reinforcement bar required to transfer the stress from steel to concrete.
It is provided to ensure that the reinforcement bar is properly bonded with the concrete.
The development length depends on the diameter of the bar, the grade of the steel, and the strength of the concrete.
If the developmen...
Modular bricks come in various dimensions depending on the manufacturer and intended use.
Modular bricks are typically 3 5/8 inches tall by 2 1/4 inches wide by 7 5/8 inches long.
Other common sizes include 2 1/4 x 3 5/8 x 7 5/8 inches and 2 1/4 x 3 5/8 x 11 5/8 inches.
Some manufacturers may offer custom sizes or shapes for specific projects.
The dimensions of modular bricks are important for determining the amount needed...
A cement bag typically measures 20 inches in height, 16 inches in width, and 4 inches in depth.
The dimensions of a cement bag may vary slightly depending on the manufacturer.
The weight of a cement bag is usually 50 kg or 110 lbs.
Cement bags are made of paper or plastic and are designed to be durable and moisture-resistant.
Soil stabilization is the process of improving the engineering properties of soil to increase its strength and durability.
It involves adding materials to the soil to improve its properties
Common materials used for soil stabilization include cement, lime, and fly ash
Soil stabilization is often used in construction projects to improve the stability of the ground
It can also be used to prevent soil erosion and improve the ...
Bearing capacity of soil can be increased by improving soil compaction, adding reinforcement, or using ground improvement techniques.
Improving soil compaction by using heavy machinery or adding water to the soil
Adding reinforcement such as geotextiles or geogrids to increase soil strength
Using ground improvement techniques such as soil stabilization or deep soil mixing
Replacing weak soil with stronger soil or using pil...
The amount of steel needed for a 1000sqft slab depends on the thickness of the slab and the spacing of the steel bars.
The thickness of the slab will determine the amount of steel needed.
The spacing of the steel bars will also affect the amount of steel needed.
A typical 4-inch thick slab may require around 100-120 steel bars per 1000sqft.
The size and type of steel bars used will also impact the amount needed.
BOQ stands for Bill of Quantities, which is a document that lists all the materials, labor, and equipment needed for a construction project.
BOQ is a detailed document that helps in estimating the cost of a construction project.
It includes a list of all the materials, equipment, and labor required for the project.
BOQ is prepared by a quantity surveyor or an estimator.
It helps in comparing the actual cost of the project ...
Puff panel is a type of insulated panel made of two metal sheets with a foam core in between.
Puff panels are commonly used in construction for walls, roofs, and ceilings.
They provide excellent insulation and are lightweight, making them easy to install.
Puff panels are also fire-resistant and have good sound insulation properties.
Examples of applications include cold storages, clean rooms, and industrial buildings.
Putty work involves filling gaps and cracks in walls to create a smooth surface for painting or wallpapering.
Clean the surface to be puttied
Apply putty to the gaps and cracks using a putty knife
Smooth out the putty with a wet sponge or sandpaper
Allow the putty to dry completely before painting or wallpapering
Repeat the process if necessary for a smooth finish
Top trending discussions
I applied via Referral and was interviewed in Apr 2021. There were 3 interview rounds.
I applied via Company Website and was interviewed in Jan 2021. There were 3 interview rounds.
In five years, I envision myself as a senior analyst, leading projects and mentoring junior team members while driving impactful data-driven decisions.
I aim to develop expertise in advanced analytics tools, such as Python and R, to enhance data modeling capabilities.
I plan to take on leadership roles in projects, guiding teams to deliver actionable insights that align with business goals.
I aspire to mentor junior analy...
To debug a particular program without affecting others, use breakpoints and step through the code.
Set a breakpoint in the program you want to debug
Step through the code using a debugger to identify the issue
Use logging statements to track the flow of the program
Check the call stack to see which functions are being called
Use conditional breakpoints to stop the program at specific points
I applied via Walk-in and was interviewed before Jun 2021. There were 2 interview rounds.
HR told about the company on the first day, how it works, told the rules, showed the management and a lot
I applied via Approached by Company and was interviewed before Jul 2021. There were 3 interview rounds.
I applied via Campus Placement and was interviewed before Feb 2020. There were 4 interview rounds.
If and Switch Case statements are used for conditional branching in programming.
If statements are used for simple conditional branching.
Switch Case statements are used for multiple conditional branching.
If statements are more flexible than Switch Case statements.
Switch Case statements are more efficient than If statements for large number of conditions.
If statements can be nested, but Switch Case statements cannot.
Exam...
Yes, algorithms and pseudocodes are still important in IT Services.
Algorithms are used in various fields of IT such as machine learning, data analysis, and cryptography.
Pseudocodes are used to plan and design algorithms before coding them.
Understanding algorithms and pseudocodes is essential for software engineers to write efficient and optimized code.
Examples of algorithms include sorting algorithms, search algorithms...
Yes, I am comfortable using both CLIs and IDEs for my daily tasks.
I have experience using various CLIs such as Git Bash, Windows Command Prompt, and Terminal on macOS.
I am proficient in using IDEs such as Visual Studio Code, Eclipse, and IntelliJ IDEA.
I understand the benefits and drawbacks of both CLIs and IDEs and can choose the appropriate tool for the task at hand.
I applied via Referral and was interviewed in Dec 2020. There were 4 interview rounds.
based on 2 reviews
Rating in categories
Store Keeper
3
salaries
| ₹2.5 L/yr - ₹2.5 L/yr |
Biomedical Service Engineer
3
salaries
| ₹2.8 L/yr - ₹4.1 L/yr |
TCS
Accenture
Wipro
Cognizant