Filter interviews by
I applied via Company Website and was interviewed before Jun 2021. There were 4 interview rounds.
Chech the IQ level and some mathmatics.
Reverse engineering is the process of analyzing a product to understand its design and functionality in order to recreate or improve upon it.
Reverse engineering involves disassembling a product to understand how it was designed and functions.
It can be used to create a new product based on an existing one, improve upon an existing design, or understand how a competitor's product works.
Reverse engineering is commonly use...
Defect face on moulding can be caused by various factors such as improper mold design, poor material quality, or incorrect processing parameters.
Check for any issues with the mold design, such as inadequate cooling or improper venting.
Inspect the material quality for any impurities or inconsistencies that could lead to defects.
Review the processing parameters like temperature, pressure, and cycle time to ensure they ar...
I applied via Naukri.com and was interviewed in Jun 2023. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Jun 2022. There were 2 interview rounds.
Samvardhana Motherson Auto Component interview questions for popular designations
I applied via Company Website and was interviewed in May 2022. There was 1 interview round.
posted on 1 Jul 2021
OEE stands for Overall Equipment Efficiency. It is a measure of how effectively a manufacturing operation is utilized.
OEE is calculated by multiplying Availability, Performance, and Quality.
Availability measures the percentage of time that equipment is available for production.
Performance measures the speed at which the equipment operates compared to its designed speed.
Quality measures the percentage of good-quality pr...
Production planning in shopfloor involves creating a detailed plan for manufacturing processes to ensure efficient and timely production.
Production planning involves determining the sequence of operations, resources required, and estimated time for each task.
It includes creating a production schedule, allocating resources, and coordinating with different departments.
The goal is to optimize production, minimize downtime...
Productivity is the measure of efficiency and output in relation to the resources used.
Productivity is a measure of how efficiently resources are used to produce goods or services.
It is the ratio of output to input, indicating how much is produced per unit of input.
Higher productivity means achieving more output with the same or fewer resources.
For example, in manufacturing, productivity can be measured by the number o...
5S is a methodology used to organize and maintain a clean, efficient, and safe work environment.
5S stands for Sort, Set in Order, Shine, Standardize, and Sustain.
Sort involves removing unnecessary items from the workplace.
Set in Order focuses on arranging necessary items in a logical and efficient manner.
Shine involves cleaning and maintaining the workplace.
Standardize establishes guidelines and procedures for maintain...
posted on 31 Aug 2022
I applied via Naukri.com and was interviewed in Jul 2022. There were 3 interview rounds.
I applied via Walk-in
posted on 5 May 2024
I applied via Walk-in and was interviewed before May 2023. There was 1 interview round.
based on 12 interviews
Interview experience
based on 92 reviews
Rating in categories
Senior Engineer
42
salaries
| ₹0 L/yr - ₹0 L/yr |
Quality Engineer
22
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
21
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineer
19
salaries
| ₹0 L/yr - ₹0 L/yr |
Quality Inspector
18
salaries
| ₹0 L/yr - ₹0 L/yr |
Bharat Forge
UNO Minda
Sundaram Clayton
Rane Group