Filter interviews by
The process for receiving materials involves inspection, documentation, storage, and updating inventory records.
Materials are received at the designated receiving area
Received materials are inspected for quality and quantity
Documentation such as delivery notes and invoices are checked and signed off
Materials are then stored in the appropriate location in the warehouse
Inventory records are updated to reflect the ne...
Inventory refers to the goods and materials a business holds for the purpose of resale or use in production.
Inventory includes raw materials, work-in-progress, and finished goods.
It is an essential part of supply chain management.
Inventory management involves tracking, storing, and replenishing inventory.
Examples of inventory include merchandise in a retail store, spare parts in a manufacturing plant, and office s...
We purchase aggregate from authorized suppliers and vendors who provide high-quality materials at competitive prices.
We purchase aggregate from authorized suppliers and vendors.
We ensure that the materials are of high quality and meet our standards.
We look for competitive prices to ensure cost-effectiveness.
Examples of suppliers include ABC Construction Supplies and XYZ Aggregate Co.
A geotechnical investigation is conducted to assess the soil and rock conditions at a site for construction projects.
Determines the suitability of the site for construction
Identifies potential risks such as landslides, soil liquefaction, or sinkholes
Helps in designing foundations and earthworks
Involves drilling boreholes, taking soil samples, and conducting laboratory tests
Results in a geotechnical report with rec...
Load-bearing capacity in structural engineering refers to the maximum load a structure can support without failing.
Load-bearing capacity is determined by factors such as material strength, design, and support conditions.
Structural engineers calculate load-bearing capacity to ensure safety and prevent structural failure.
Examples of load-bearing elements include columns, beams, and foundations.
Load-bearing capacity ...
My best skill in the construction field is project management.
Strong project planning and scheduling abilities
Effective communication with stakeholders
Proven track record of delivering projects on time and within budget
Matching hole fairness involves ensuring that the dimensions and alignment of holes in mechanical components meet specified standards.
Use precision measuring tools like calipers and micrometers to measure hole dimensions
Check hole alignment using alignment pins or laser alignment tools
Compare measured dimensions and alignment with specified tolerances
Use visual inspection to check for burrs, rough edges, or other ...
Launching a girder at height involves careful planning and execution.
Ensure proper lifting equipment and rigging are used
Conduct a thorough risk assessment and develop a detailed lifting plan
Coordinate with a team of skilled personnel to ensure safe and efficient execution
Use cranes or other lifting devices to hoist the girder to the desired height
Ensure proper alignment and positioning of the girder during the li...
Yes, I am familiar with torquing on HSFG bolts.
Torquing refers to the process of tightening bolts to a specific torque value.
HSFG stands for High Strength Friction Grip, which is a type of bolt used in structural applications.
Torquing on HSFG bolts is important to ensure proper clamping force and prevent loosening.
The torque value for HSFG bolts is typically specified by the manufacturer or engineering standards.
U...
Residual Camber is the amount of curvature that remains in a structural member after it has been manufactured or formed.
Residual Camber is a common term used in the field of structural engineering.
It refers to the amount of curvature that remains in a structural member after it has been manufactured or formed.
It is typically measured as the difference between the actual curvature and the desired or intended curvat...
Shuttering materials are used in construction for creating formwork to support concrete until it sets.
Types include timber, plywood, steel, aluminum, and plastic
Timber is commonly used for small projects and is cost-effective
Plywood is versatile and can be reused multiple times
Steel is durable and suitable for heavy-duty projects
Aluminum is lightweight and corrosion-resistant
Plastic is easy to handle and can be used fo...
Inventory refers to the goods and materials a business holds for the purpose of resale or use in production.
Inventory includes raw materials, work-in-progress, and finished goods.
It is an essential part of supply chain management.
Inventory management involves tracking, storing, and replenishing inventory.
Examples of inventory include merchandise in a retail store, spare parts in a manufacturing plant, and office suppli...
The process for receiving materials involves inspection, documentation, storage, and updating inventory records.
Materials are received at the designated receiving area
Received materials are inspected for quality and quantity
Documentation such as delivery notes and invoices are checked and signed off
Materials are then stored in the appropriate location in the warehouse
Inventory records are updated to reflect the new sto...
Technical questions and aptitude questions
About the railways facility
HSE techniques focus on preventing accidents and promoting a safe work environment, resulting in improved employee well-being and productivity.
Implementing risk assessments to identify potential hazards
Providing safety training to employees on proper procedures and equipment usage
Regularly conducting safety inspections and audits to ensure compliance with regulations
Encouraging employee involvement in safety programs a...
I applied via Walk-in
Load-bearing capacity in structural engineering refers to the maximum load a structure can support without failing.
Load-bearing capacity is determined by factors such as material strength, design, and support conditions.
Structural engineers calculate load-bearing capacity to ensure safety and prevent structural failure.
Examples of load-bearing elements include columns, beams, and foundations.
Load-bearing capacity can b...
A geotechnical investigation is conducted to assess the soil and rock conditions at a site for construction projects.
Determines the suitability of the site for construction
Identifies potential risks such as landslides, soil liquefaction, or sinkholes
Helps in designing foundations and earthworks
Involves drilling boreholes, taking soil samples, and conducting laboratory tests
Results in a geotechnical report with recommen...
ABC & XYZ classification with ERP related questions along with technical sound
I applied via Naukri.com and was interviewed in Apr 2024. There were 2 interview rounds.
Civil engineers work with a variety of materials including concrete, steel, asphalt, and wood.
Common materials used in civil engineering include concrete, steel, asphalt, wood, and aggregates.
Concrete is used for foundations, roads, and structures.
Steel is used for beams, columns, and reinforcement.
Asphalt is used for roads and pavements.
Wood is used for formwork, bridges, and buildings.
Aggregates are used in concrete ...
I applied via Referral
I applied via Referral and was interviewed in Nov 2023. There was 1 interview round.
Aggregates are sourced from local suppliers to reduce transportation costs. Costing is based on market rates and quality of aggregates.
Aggregates are sourced from local suppliers to minimize transportation costs
Costing is determined by market rates and quality of aggregates
Regularly evaluating suppliers for competitive pricing and quality assurance
Negotiating bulk discounts for cost savings
Utilizing technology for effi...
Top trending discussions
Some of the top questions asked at the S P Singla Constructions interview -
The duration of S P Singla Constructions interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 40 interview experiences
Difficulty level
Duration
based on 475 reviews
Rating in categories
Civil Site Engineer
62
salaries
| ₹2.1 L/yr - ₹7 L/yr |
Site Engineer
58
salaries
| ₹2 L/yr - ₹6 L/yr |
Civil Engineer
38
salaries
| ₹2 L/yr - ₹6 L/yr |
Senior Engineer
35
salaries
| ₹4.2 L/yr - ₹13.5 L/yr |
Mechanical Engineer
31
salaries
| ₹2.4 L/yr - ₹6 L/yr |
Nasser S. Al Hajri Corporation
Navayuga Engineering Company
B.L. Kashyap & Sons
L & W Constructions