HSE Manager Interview Questions & Answers

user image Anonymous

posted on 21 Sep 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. HSE techniques and benefits
  • Ans. 

    HSE techniques focus on preventing accidents and promoting a safe work environment, resulting in improved employee well-being and productivity.

    • Implementing risk assessments to identify potential hazards

    • Providing safety training to employees on proper procedures and equipment usage

    • Regularly conducting safety inspections and audits to ensure compliance with regulations

    • Encouraging employee involvement in safety programs a...

  • Answered by AI
  • Q2. Safety policy and codal provision

Interview Preparation Tips

Interview preparation tips for other job seekers - 1. Strong mission and values
2. Positive company culture
3. Innovative and dynamic work environment
4. Opportunities for growth and development
5. Competitive compensation and benefits
6. Good work-life balance
7. Diversity, equity, and inclusion
8. Strong leadership and management
9. Collaborative and supportive team
10. Flexibility and adaptability

Interview questions from similar companies

Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Project details
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Apr 2023. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. How about your previous company experience?
  • Q2. I was tell about my roles and what type of work I have done.

Interview Preparation Tips

Interview preparation tips for other job seekers - Very easy interview questions I had faced.

I applied via Company Website and was interviewed before Apr 2020. There were 3 interview rounds.

Interview Questionnaire 

12 Questions

  • Q1. 1. Make a layout of combined cycle power plant with different structures and components.
  • Ans. 

    Layout of combined cycle power plant with different structures and components.

    • Combined cycle power plant consists of gas turbine, heat recovery steam generator, and steam turbine.

    • Gas turbine generates electricity by burning natural gas or oil.

    • Heat recovery steam generator recovers waste heat from gas turbine exhaust and generates steam.

    • Steam turbine generates additional electricity using the steam produced by heat reco...

  • Answered by AI
  • Q2. 2 How you design machine foundation for Gas turbine. which are the different types of machine foundations.
  • Ans. 

    Designing machine foundation for gas turbine involves several factors and types of foundations.

    • Factors to consider include soil type, turbine size and weight, seismic activity, and environmental conditions.

    • Types of foundations include block, pile, and raft foundations.

    • Block foundations are suitable for smaller turbines on stable soil.

    • Pile foundations are used for larger turbines or unstable soil.

    • Raft foundations are us...

  • Answered by AI
  • Q3. 3. How you do ductile detailing for beam , column and foundation . which are the IS code you use for ductile detailing.
  • Ans. 

    Ductile detailing for beam, column, and foundation involves following IS codes and ensuring proper reinforcement placement.

    • For beams, IS 13920 is followed and reinforcement is placed at the bottom of the beam.

    • For columns, IS 13920 and IS 456 are followed and reinforcement is placed in a spiral pattern.

    • For foundations, IS 13920 and IS 2911 are followed and reinforcement is placed in a specific pattern based on the type ...

  • Answered by AI
  • Q4. 4.what are the different type of pile foundation and how you design them .
  • Ans. 

    Pile foundations are used to transfer loads from structures to soil. Different types include driven piles, bored piles, and screw piles.

    • Driven piles are installed by hammering or vibrating them into the ground.

    • Bored piles are created by drilling a hole and then filling it with concrete and steel reinforcement.

    • Screw piles are twisted into the ground using a hydraulic motor.

    • Design considerations include soil type, load c...

  • Answered by AI
  • Q5. 5. How you design shear wall and how you detail it .
  • Ans. 

    Shear walls are designed to resist lateral forces. Detailing includes reinforcement placement and anchorage.

    • Design shear walls based on the building code requirements and structural analysis.

    • Select appropriate materials and thickness for the shear wall.

    • Detail the reinforcement placement and anchorage to ensure proper load transfer.

    • Provide adequate boundary elements and openings for ducts and pipes.

    • Consider seismic and ...

  • Answered by AI
  • Q6. 6. which are the different software you are using for structural analysis.
  • Ans. 

    I have experience with various software for structural analysis.

    • STAAD.Pro

    • SAP2000

    • ETABS

    • ANSYS

    • AutoCAD Structural Detailing

  • Answered by AI
  • Q7. 7. How you model raft foundation or shear wall in finet element method.
  • Ans. 

    To model raft foundation or shear wall in finite element method, one needs to follow certain steps.

    • First, create a 3D model of the foundation or wall using a CAD software.

    • Next, import the model into a finite element analysis software.

    • Define the material properties and boundary conditions.

    • Mesh the model to create finite elements.

    • Solve the model to obtain the stresses and displacements.

    • Finally, analyze the results and ma...

  • Answered by AI
  • Q8. 8. How you design water retaining structures. which is the IS code you use for water retaining structures. and what is the crack width for water retaining structures.
  • Ans. 

    Water retaining structures are designed as per IS code and crack width is limited to ensure safety.

    • Design of water retaining structures involves determining the loads, selecting materials, and ensuring stability.

    • IS 3370 is the code used for design of water retaining structures in India.

    • The crack width for water retaining structures is limited to 0.2 mm to ensure safety and prevent leakage.

    • Various types of water retaini...

  • Answered by AI
  • Q9. 9. Have you worked with international codes like American and British codes .
  • Ans. 

    Yes, I have worked with both American and British codes.

    • I have experience working with the International Building Code (IBC) which is based on American codes.

    • I have also worked with British Standards (BS) such as BS 5950 for structural steel design.

    • I am familiar with the differences between the two codes and can adapt accordingly.

  • Answered by AI
  • Q10. 10. What are the different load combination for RCC and Steal structures .
  • Ans. 

    Different load combinations for RCC and Steel structures.

    • Load combinations for RCC structures include dead load, live load, wind load, earthquake load, and temperature load.

    • Load combinations for Steel structures include dead load, live load, wind load, earthquake load, temperature load, and snow load.

    • Load combinations are determined based on the design codes and standards applicable to the project.

    • The load combinations...

  • Answered by AI
  • Q11. 11. Do you have exposure of site inspection and can you make progress and quality report .
  • Ans. 

    Yes, I have extensive experience in site inspections and creating progress and quality reports.

    • I have conducted site inspections for various projects in my previous roles.

    • I am proficient in creating detailed progress and quality reports based on my observations during site inspections.

    • I have also implemented corrective actions based on the findings of my inspections to ensure project success.

    • For example, in my previous...

  • Answered by AI
  • Q12. 12. Draw a bending moment and shear fonce diagram for portal frame with lateral force and UDL .
  • Ans. 

    To draw a bending moment and shear force diagram for a portal frame with lateral force and UDL.

    • Calculate the reactions at the supports

    • Determine the shear force and bending moment at each section

    • Plot the shear force and bending moment diagrams

    • Identify the maximum shear force and bending moment

    • Consider the sign conventions for shear force and bending moment

    • Use appropriate software or tools for accurate results

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - you should be perfect in design aspect and fundamentals, different codes and state of art software which you using.

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Jan 2025.

Round 1 - Technical 

(4 Questions)

  • Q1. What is the hydraulic gradient line?
  • Ans. 

    The hydraulic gradient line is a line representing the total head of water at various points along a flow path in a hydraulic system.

    • It is a graphical representation of the total head of water in a hydraulic system.

    • It shows the energy level of water at different points along a flow path.

    • The slope of the hydraulic gradient line indicates the direction and rate of flow of water.

    • It is used in analyzing flow patterns and d...

  • Answered by AI
  • Q2. What are the methods for managing floods?
  • Ans. 

    Methods for managing floods include structural measures, non-structural measures, and preparedness planning.

    • Structural measures include building dams, levees, and flood walls to control water flow.

    • Non-structural measures involve land-use planning, zoning regulations, and wetland preservation to reduce flood risk.

    • Preparedness planning includes early warning systems, evacuation plans, and community education on flood saf...

  • Answered by AI
  • Q3. What is prestress concrete?
  • Ans. 

    Prestressed concrete is a type of concrete that has been compressed prior to being subjected to loads.

    • Prestressed concrete is created by introducing internal stresses in the concrete before it is subjected to external loads.

    • This compression helps to counteract the tensile stresses that the concrete will experience during use.

    • Prestressed concrete is commonly used in bridges, parking structures, and high-rise buildings.

    • E...

  • Answered by AI
  • Q4. What is Flood Wall?
  • Ans. 

    A flood wall is a structure designed to prevent flooding by holding back water.

    • Flood walls are typically made of concrete, steel, or other strong materials.

    • They are commonly used along rivers, coastlines, and other areas prone to flooding.

    • Flood walls can vary in height and design depending on the level of protection needed.

    • Examples of flood walls include the Thames Barrier in London and the flood walls along the Missis

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Maintain a positive attitude and demonstrate a willingness to learn.
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Related to cad and design

Interview Preparation Tips

Interview preparation tips for other job seekers - Need to be flexible in ur approach.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Group Discussion 

Questions on resource management

Round 2 - Case Study 

Senarios about work and attitue

Interview Preparation Tips

Interview preparation tips for other job seekers - be yourself

I applied via Approached by Company and was interviewed in Sep 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(5 Questions)

  • Q1. What is your name please
  • Q2. My name is Maddi SYAMASUNDARARAO
  • Q3. Pilling department concrete
  • Q4. Man power dipartment
  • Q5. Any work I can handle

Interview Preparation Tips

Topics to prepare for Navayuga Engineering Company Supervisor interview:
  • Pailling
Interview preparation tips for other job seekers - I whant to thes job kindly and we are all ready working

I applied via Campus Placement and was interviewed in Aug 2021. There were 3 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Civil basic concepts
  • Q2. What isM20,What are the types of steel,Harbour topics etc
  • Ans. 

    M20 is a grade of concrete used in construction. Steel types include mild steel, high tensile steel, and stainless steel. Harbour topics may include dredging, breakwaters, and port design.

    • M20 is a mix of concrete with a compressive strength of 20 MPa

    • Mild steel is commonly used in construction for reinforcement

    • High tensile steel has a higher strength and is used in structures with greater stress

    • Stainless steel is corros...

  • Answered by AI
Round 2 - Technical 

(1 Question)

  • Q1. Types of steel & design codes of construction materials,
  • Ans. 

    Various types of steel and design codes are used in construction materials.

    • Common types of steel include carbon steel, stainless steel, and alloy steel.

    • Design codes for construction materials include ACI, AISC, ASCE, and ASTM.

    • ACI (American Concrete Institute) provides codes for concrete design.

    • AISC (American Institute of Steel Construction) provides codes for steel design.

    • ASCE (American Society of Civil Engineers) prov...

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. Why should we hire you?

Interview Preparation Tips

Topics to prepare for Navayuga Engineering Company Site Engineer interview:
  • Concrete technology
  • Types of machines used in site
  • Strength of materials
Interview preparation tips for other job seekers - We are all well known about our stream basic concepts & Right or wrong be frank open your tongue to answer the interviewer qns
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Feb 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. What is refrigeration cycle? Commissioning stages of Data center?
  • Ans. 

    The refrigeration cycle is a process that removes heat from a space and transfers it to the external environment.

    • The refrigeration cycle consists of four main components: compressor, condenser, expansion valve, and evaporator.

    • The compressor compresses the refrigerant gas, raising its temperature and pressure.

    • The high-pressure refrigerant then flows to the condenser, where it releases heat to the surroundings and conden...

  • Answered by AI
  • Q2. What is chilled water system? Types of ac system?
  • Ans. 

    A chilled water system is a cooling system that uses chilled water to remove heat from a building or process.

    • Chilled water systems use water as a cooling medium.

    • They typically consist of a chiller, chilled water pumps, and a distribution system.

    • Chilled water is circulated through coils or heat exchangers to cool air or equipment.

    • Chilled water systems are commonly used in large commercial buildings, data centers, and in...

  • Answered by AI
  • Q3. Types of pumps? Types of compressor
  • Ans. 

    Types of pumps include centrifugal pumps, reciprocating pumps, and rotary pumps.

    • Centrifugal pumps use centrifugal force to move fluid through a system.

    • Reciprocating pumps use a piston or diaphragm to create pressure and move fluid.

    • Rotary pumps use rotating mechanisms to transfer fluid.

    • Other types of pumps include gear pumps, peristaltic pumps, and vane pumps.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident about yourself.
Study the jd
Introduce yourself in a good way
Dont use extra pause during explanation.
Should be well dressed
Use the language in whic you are comfortable

Skills evaluated in this interview

S P Singla Constructions Interview FAQs

How many rounds are there in S P Singla Constructions HSE Manager interview?
S P Singla Constructions interview process usually has 1 rounds. The most common rounds in the S P Singla Constructions interview process are Technical.
What are the top questions asked in S P Singla Constructions HSE Manager interview?

Some of the top questions asked at the S P Singla Constructions HSE Manager interview -

  1. HSE techniques and benef...read more
  2. Safety policy and codal provis...read more

Tell us how to improve this page.

S P Singla Constructions HSE Manager Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

S P Singla Constructions HSE Manager Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

3.0

Skill development

3.0

Work-life balance

2.0

Salary

3.0

Job security

3.0

Company culture

3.0

Promotions

2.0

Work satisfaction

Explore 1 Review and Rating
Civil Site Engineer
67 salaries
unlock blur

₹2.1 L/yr - ₹7 L/yr

Site Engineer
64 salaries
unlock blur

₹2 L/yr - ₹6 L/yr

Civil Engineer
41 salaries
unlock blur

₹2 L/yr - ₹6 L/yr

Senior Engineer
36 salaries
unlock blur

₹3.4 L/yr - ₹13.5 L/yr

Assistant Manager
25 salaries
unlock blur

₹5 L/yr - ₹13.5 L/yr

Explore more salaries
Compare S P Singla Constructions with

Sterling & Wilson

4.1
Compare

Nasser S. Al Hajri Corporation

3.6
Compare

Navayuga Engineering Company

3.9
Compare

B.L. Kashyap & Sons

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview