I applied via Company Website and was interviewed in Oct 2021. There were 5 interview rounds.
Material lay at site and delay in consumption refers to the situation where materials are present at the site but are not being used in a timely manner.
This can happen due to various reasons such as lack of proper planning, inefficient communication, or unexpected changes in project timelines.
For example, if a construction project is delayed due to weather conditions, the materials that were delivered to the site may l...
I applied via Company Website and was interviewed before Sep 2022. There were 3 interview rounds.
ACCOUNTING MANAGEMENT
I applied via Walk-in and was interviewed in Apr 2021. There was 1 interview round.
Precast structures are pre-made concrete elements used in construction.
Precast segments are manufactured off-site and transported to the construction site for assembly.
They are commonly used in bridge construction, tunnels, and other large-scale infrastructure projects.
Precast segments can be designed to fit specific project requirements, reducing construction time and costs.
They offer high durability and strength, and...
Segment casting can be done using various methods depending on the material and application.
One method is sand casting, where a mold is created using sand and the molten metal is poured into it.
Another method is investment casting, where a wax pattern is created and coated with ceramic before the metal is poured.
Die casting is a method where molten metal is forced into a mold under high pressure.
Continuous casting is u...
Grade of concrete refers to its strength and durability.
Grade of concrete is denoted by a number followed by 'M' which stands for mix.
The number represents the compressive strength of concrete in megapascals (MPa).
Common grades of concrete include M10, M20, M30, etc.
Higher grade concrete has higher strength and durability.
For example, M20 grade concrete has a compressive strength of 20 MPa.
Design mix of concrete refers to the proportion of materials used in making concrete.
Design mix is determined based on the strength and durability requirements of the concrete.
The mix includes cement, water, aggregates (sand, gravel, crushed stone), and sometimes admixtures.
The proportions of each material are specified in terms of weight or volume.
For example, a common mix for general use is 1:2:3 (cement:sand:gravel)...
Segment casting is a method of casting concrete segments for tunnel lining.
Segments are cast in a factory and transported to the tunnel site.
Segments are then assembled to form a complete tunnel lining.
This method is commonly used in tunnel construction projects.
It allows for faster construction and better quality control.
Examples include the Channel Tunnel and the SMART Tunnel in Malaysia.
S P Singla Constructions interview questions for popular designations
Get interview-ready with Top S P Singla Constructions Interview Questions
I applied via Recruitment Consulltant and was interviewed before May 2022. There were 3 interview rounds.
Aggregate code and soil code
Codeing testing and ms words and any questions solve
I applied via Referral and was interviewed before Nov 2021. There was 1 interview round.
Best quality management policy at site achieved through a comprehensive approach.
Establishing clear quality objectives and targets
Implementing a quality management system
Providing regular training and development opportunities for staff
Conducting regular audits and inspections
Encouraging a culture of continuous improvement
Ensuring compliance with relevant regulations and standards
Top trending discussions
Some of the top questions asked at the S P Singla Constructions interview -
The duration of S P Singla Constructions interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 36 interviews
Interview experience
based on 437 reviews
Rating in categories
Civil Site Engineer
67
salaries
| ₹0 L/yr - ₹0 L/yr |
Site Engineer
62
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Engineer
43
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
36
salaries
| ₹0 L/yr - ₹0 L/yr |
Planning & Billing Engineer
25
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
Punj Lloyd