Upload Button Icon Add office photos

Filter interviews by

S J Developers Trainee Site Engineer Interview Questions and Answers

Updated 5 Sep 2022

S J Developers Trainee Site Engineer Interview Experiences

1 interview found

I applied via Walk-in and was interviewed in Mar 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Mix designs for concrete
  • Ans. 

    Mix designs for concrete involve determining the proportions of various ingredients to achieve desired properties.

    • Mix designs are based on the required strength, workability, and durability of the concrete.

    • Ingredients include cement, water, aggregates, and admixtures.

    • The American Concrete Institute provides guidelines for mix designs.

    • Examples of mix designs include 1:2:3 (cement:sand:gravel) and 1:1.5:3 (cement:sand:gr

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. Which cement is preferred for sea shore area
  • Ans. 

    Cement with low heat of hydration and high sulfate resistance is preferred for sea shore area.

    • Cement with low C3A content is preferred as it reduces the risk of sulfate attack.

    • Cement with low heat of hydration is preferred as it reduces the risk of thermal cracking.

    • Blended cement with fly ash or slag can also be used as they have better resistance to sulfate attack.

    • Examples of such cement are Portland Pozzolana Cement

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Learn basics of civil engineering in structural surveying

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Explain mivan slab cycle
  • Ans. 

    Mivan slab cycle is a construction technique using aluminum formwork for casting slabs in a repetitive cycle.

    • Mivan slab cycle involves setting up aluminum formwork panels for casting slabs.

    • The cycle includes fixing reinforcement, pouring concrete, curing, and then dismantling the formwork for reuse.

    • This method is efficient, cost-effective, and results in high-quality finishes.

    • Mivan slab cycle reduces construction time ...

  • Answered by AI
  • Q2. What will you ensure before concreting
  • Ans. 

    Before concreting, ensure proper formwork, reinforcement placement, concrete mix design, and weather conditions.

    • Check formwork for proper alignment and stability

    • Ensure reinforcement bars are correctly placed as per design

    • Verify concrete mix design meets project specifications

    • Monitor weather conditions to prevent issues like rain or extreme temperatures affecting the concrete

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. Expected salary if selected
  • Ans. 

    My expected salary is based on my qualifications, experience, and the industry standards.

    • I am looking for a competitive salary that reflects my skills and experience in the civil engineering field.

    • I have researched the average salary range for Civil Site Engineers in this region and industry.

    • I am open to negotiation based on the overall compensation package offered by the company.

    • I am looking for a salary that aligns w...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Apr 2024. There were 3 interview rounds.

Round 1 - Aptitude Test 

Conduct the offline test

Round 2 - Technical 

(8 Questions)

  • Q1. Density of steel, cement, concrete, sand, aggregates.
  • Ans. 

    Density of common construction materials

    • Steel: 7850 kg/m^3

    • Cement: 1440 kg/m^3

    • Concrete: 2400 kg/m^3

    • Sand: 1600-1700 kg/m^3

    • Aggregates: 1500-1750 kg/m^3

  • Answered by AI
  • Q2. How to find triangle concrete quantity.
  • Ans. 

    Triangle concrete quantity can be found using the formula: 1/2 * base * height * thickness.

    • Calculate the area of the triangle using the formula: 1/2 * base * height.

    • Multiply the area by the thickness to get the concrete quantity.

    • For example, if the base of the triangle is 5 meters, height is 8 meters, and thickness is 0.2 meters, the concrete quantity would be: 1/2 * 5 * 8 * 0.2 = 4 cubic meters.

  • Answered by AI
  • Q3. How to find circular column concrete quantity.
  • Ans. 

    Circular column concrete quantity can be found using the formula: Volume = πr^2h

    • Calculate the area of the circular column using the formula A = πr^2

    • Measure the height of the column

    • Multiply the area by the height to get the volume of concrete needed

    • Consider any additional factors such as wastage or reinforcement bars

  • Answered by AI
  • Q4. As a site engineer what is your roles and responsibilities.
  • Q5. What is slump test why we do.
  • Ans. 

    Slump test is a method to measure the consistency of concrete before it sets.

    • Slump test is used to determine the workability of fresh concrete.

    • It involves filling a cone-shaped mold with concrete, then lifting the mold to see how much the concrete slumps or settles.

    • The amount of slump indicates the consistency of the concrete - a higher slump means a more workable mix.

    • Slump test helps in ensuring that the concrete mix ...

  • Answered by AI
  • Q6. Compressive strength of concrete after 14 & 28 days and also persentage of strength.
  • Ans. 

    Compressive strength of concrete is typically measured after 14 and 28 days to assess its strength development.

    • Compressive strength of concrete is usually measured in pounds per square inch (psi) or megapascals (MPa).

    • After 14 days, the average compressive strength of concrete is around 60-75% of its ultimate strength.

    • After 28 days, the concrete typically reaches about 90-95% of its ultimate strength.

    • The percentage of s...

  • Answered by AI
  • Q7. Mix ratios of concrete
  • Ans. 

    Mix ratios of concrete refer to the proportions of cement, sand, and aggregate used in a concrete mix.

    • Mix ratios are typically expressed as a ratio of cement:sand:aggregate, such as 1:2:4.

    • The mix ratio will vary depending on the strength and durability requirements of the concrete.

    • Common mix ratios include 1:2:3 for low strength concrete and 1:1.5:3 for high strength concrete.

    • Water is also added to the mix to achieve t

  • Answered by AI
  • Q8. Building IS Codes
Round 3 - HR 

(2 Questions)

  • Q1. Family background, Expected salary, present salary, Notice period.
  • Q2. Why you choose shoba.

Interview Preparation Tips

Interview preparation tips for other job seekers - Trust your self. And be prepare.
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. What is using this toilet room in waterproofing
  • Ans. 

    Waterproofing in a toilet room is essential to prevent water damage and maintain structural integrity.

    • Waterproofing materials such as membranes, sealants, and coatings are used to protect surfaces from water penetration.

    • Proper installation of waterproofing systems is crucial to ensure long-term effectiveness.

    • Regular maintenance and inspections are necessary to identify and address any issues with waterproofing.

    • Examples...

  • Answered by AI
  • Q2. Why are out- let points through a core cutting work
  • Q3. How much 1meter lenth how much kg
  • Ans. 

    The weight of 1 meter length depends on the material being measured.

    • The weight of 1 meter length can vary depending on the material, such as steel, aluminum, wood, etc.

    • To calculate the weight, you need to know the density of the material.

    • For example, the weight of 1 meter length of steel would be different from 1 meter length of wood.

  • Answered by AI
  • Q4. 1m^3 how many bricks
  • Ans. 

    The number of bricks in 1m^3 depends on the size of the bricks being used.

    • The number of bricks in 1m^3 will vary based on the size of the bricks.

    • Calculate the volume of a single brick and then divide 1m^3 by that volume to get the number of bricks.

    • For example, if a brick is 0.2m x 0.1m x 0.05m, its volume would be 0.001m^3. Therefore, 1m^3 would contain 1000 bricks.

  • Answered by AI
  • Q5. Why are applying for ventilation

Interview Preparation Tips

Interview preparation tips for other job seekers - Simple methods & share as per drawing and hard working
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Referral and was interviewed in Jun 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Mep engeneering
  • Q2. Plumbing drawing

Interview Preparation Tips

Interview preparation tips for other job seekers - One by one round
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Abt work Experience?
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Normal question about your experience and profile
Round 3 - HR 

(1 Question)

  • Q1. After hr interview they forward to you for technical round

Interview Preparation Tips

Interview preparation tips for other job seekers - Knightfrank is a good company but they will provide multiple locations for work.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Sep 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Tell me about yourself Cement density Brick size Concrete grade
  • Ans. 

    I am a Site Engineer with expertise in cement density, brick size, and concrete grade.

    • I have extensive knowledge of different types of cement and their densities.

    • I am familiar with various brick sizes and their applications in construction.

    • I have experience working with different concrete grades for different structural requirements.

    • I can provide recommendations on the appropriate cement density, brick size, and concre

  • Answered by AI
  • Q2. Soil density Concrete lap joint Slab Cover
Round 3 - HR 

(3 Questions)

  • Q1. Tell me about yourself
  • Ans. 

    I am a dedicated and experienced Site Engineer with a strong background in construction and project management.

    • Bachelor's degree in Civil Engineering

    • 5 years of experience in managing construction projects

    • Proficient in using construction software and tools

    • Strong problem-solving and decision-making skills

    • Excellent communication and leadership abilities

    • Completed successful projects such as building a commercial complex an

  • Answered by AI
  • Q2. Tell me about your family background
  • Ans. 

    My family background is diverse and has influenced my values and work ethic.

    • My parents are both engineers, which inspired me to pursue a career in engineering.

    • I come from a close-knit family that values education and hard work.

    • My grandparents were farmers, teaching me the importance of perseverance and adaptability.

    • I have a sibling who is a doctor, which has given me insights into the medical field.

    • My family has always...

  • Answered by AI
  • Q3. Education qualification

Interview Preparation Tips

Interview preparation tips for other job seekers - Dress well, confident , answer the questions confidently, don't nervous.

Site Engineer Interview Questions & Answers

JLL user image Prathmesh Kalan

posted on 9 Feb 2022

Round 1 - Aptitude Test 

Aptitude test like mathematics question ,reasoning & our department like mechanical engineer

Round 2 - Technical 

(2 Questions)

  • Q1. Tell me about ur self What should we hire you
  • Q2. Job timing location & salary fix
Round 3 - HR 

(3 Questions)

  • Q1. What are your salary expectations?
  • Q2. Joining letter ,job timing
  • Q3. Salary f
Interview experience
4
Good
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Apr 2023. There were 2 interview rounds.

Round 1 - Technical 

(4 Questions)

  • Q1. Actually practically be strong about ur knowledge.
  • Q2. What is done in previous company. ?
  • Q3. How to deal or solve the site situation.
  • Ans. 

    To solve site situations, it is important to assess the problem, communicate effectively with team members, implement a solution, and monitor progress.

    • Assess the situation by identifying the root cause of the problem

    • Communicate effectively with team members to gather input and feedback

    • Implement a solution by creating an action plan and assigning tasks

    • Monitor progress by regularly checking in on the situation and adjust

  • Answered by AI
  • Q4. What is safety and de snagging.
  • Ans. 

    Safety and de-snagging are important aspects of ensuring a safe and efficient work environment on construction sites.

    • Safety involves implementing measures to prevent accidents and injuries on site.

    • De-snagging refers to the process of removing obstacles or hazards that could potentially cause harm to workers.

    • Examples of safety measures include providing proper training, enforcing the use of personal protective equipment...

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. Company induction and salary structure.

Interview Preparation Tips

Topics to prepare for Lodha Group Senior Site Supervisor interview:
  • RCC and Finishing
Interview preparation tips for other job seekers - What you know about ur knowledge share it clearly to infront of interviewer.

S J Developers Interview FAQs

How many rounds are there in S J Developers Trainee Site Engineer interview?
S J Developers interview process usually has 3 rounds. The most common rounds in the S J Developers interview process are Technical, HR and Resume Shortlist.
What are the top questions asked in S J Developers Trainee Site Engineer interview?

Some of the top questions asked at the S J Developers Trainee Site Engineer interview -

  1. Which cement is preferred for sea shore a...read more
  2. Mix designs for concr...read more

Tell us how to improve this page.

People are getting interviews through

based on 1 S J Developers interview
WalkIn
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.

Interview Questions from Similar Companies

JLL Interview Questions
4.1
 • 334 Interviews
CBRE Interview Questions
4.2
 • 251 Interviews
NoBroker Interview Questions
3.1
 • 222 Interviews
Square Yards Interview Questions
4.1
 • 194 Interviews
Sobha Interview Questions
3.9
 • 122 Interviews
Lodha Group Interview Questions
4.0
 • 122 Interviews
DLF Interview Questions
4.0
 • 71 Interviews
View all
Civil Engineer
4 salaries
unlock blur

₹2.5 L/yr - ₹2.5 L/yr

Diploma Civil Engineer
3 salaries
unlock blur

₹2.4 L/yr - ₹2.4 L/yr

Explore more salaries
Compare S J Developers with

JLL

4.1
Compare

CBRE

4.2
Compare

Square Yards

4.1
Compare

NoBroker

3.1
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview