Upload Button Icon Add office photos

Rungta Mines

Compare button icon Compare button icon Compare

Filter interviews by

Rungta Mines Senior Manager Interview Questions and Answers

Updated 8 Apr 2023

Rungta Mines Senior Manager Interview Experiences

2 interviews found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Aug 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Basics in engineering like gear module, hydrostatic,and hydrodynamic
  • Q2. Ball mill working principle.
  • Ans. 

    Ball mill is a grinding machine used to grind and blend materials for use in mineral processing.

    • The ball mill works on the principle of impact and attrition.

    • The grinding media in the ball mill is usually steel or ceramic balls.

    • The material to be ground is loaded into the cylinder and rotated along with the grinding media.

    • As the cylinder rotates, the grinding media collide with the material, crushing and grinding it.

    • The...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare about basics working,moc of equipment.TQM,
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Apr 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Electrical and instrument (project and maintenance)
  • Q2. Elcetrical and instruments
  • Q3. Field instruments , abb dcs ,logics

Interview Preparation Tips

Topics to prepare for Rungta Mines Senior Manager interview:
  • Electrical Engineering
Interview preparation tips for other job seekers - Time Management Skills for projects and maintenance

Senior Manager Interview Questions Asked at Other Companies

Q1. 1. What you understand the requirement of shuttering material at ... read more
asked in Tata Motors
Q2. Types of pumps and for which process which types of pumps are req ... read more
asked in Tata Motors
Q3. What can you do if Shortage of our parts for customer ??
asked in Flipkart
Q4. - what will you do to double revenue of your organisation
asked in Yes Bank
Q5. Which funds do you recommend for long term Investment in mutual f ... read more

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Aug 2022.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Written 

(3 Questions)

  • Q1. Maths, general knowlege, chemistry
  • Q2. Extractîon of Aluminiun
  • Ans. 

    Extraction of aluminum involves the process of electrolysis of alumina.

    • Aluminum is extracted from its ore, bauxite, through the Bayer process.

    • The extracted alumina is then converted into aluminum through the Hall-Héroult process.

    • Electrolysis is used to separate the aluminum from the oxygen in alumina.

    • The process requires a large amount of electricity and is energy-intensive.

  • Answered by AI
  • Q3. Alumina from bauxite
  • Ans. 

    Alumina is extracted from bauxite through a process called the Bayer process.

    • Alumina is the primary component of aluminum production.

    • The Bayer process involves crushing the bauxite ore, mixing it with sodium hydroxide, and heating it in a pressure vessel.

    • The resulting solution is filtered to remove impurities, leaving behind alumina which is then processed into aluminum.

    • Alumina is used in a variety of industries includ

  • Answered by AI
Round 3 - HR 

(4 Questions)

  • Q1. About experience of quality and metal
  • Q2. About compansation and perks
  • Q3. About previous work experience
  • Q4. About family background

Interview Preparation Tips

Interview preparation tips for other job seekers - Aditya birla group is best organisation to work
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Details about project
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jun 2024. There were 5 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. For Profile test
  • Q2. Role and Responsibility test
Round 2 - Technical 

(2 Questions)

  • Q1. My self introduction
  • Q2. Technical Round
Round 3 - Group Discussion 

Share group profile and Up coming projects.

Round 4 - Assignment 

1400MW Bikaner Rajasthan project commissioning targets Nov. 2025.

Round 5 - HR 

(2 Questions)

  • Q1. Salary Discussion
  • Q2. Final Negotiation

Interview Preparation Tips

Interview preparation tips for other job seekers - Good Culture and Company profile.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Nov 2023. There were 4 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. About current company
  • Q2. About the company and there products
Round 2 - HR 

(3 Questions)

  • Q1. Regarding personal information
  • Q2. Why you want to switch your Job..??
  • Q3. Reason to relocate..??
Round 3 - One-on-one 

(2 Questions)

  • Q1. What are the safety norms and company acts..?
  • Ans. 

    Safety norms and company acts are regulations and guidelines put in place to ensure the safety and well-being of employees in the workplace.

    • Safety norms include wearing personal protective equipment (PPE) such as helmets, gloves, and safety shoes.

    • Company acts may include regular safety training sessions for employees to educate them on potential hazards and how to prevent accidents.

    • Safety norms also cover emergency pro...

  • Answered by AI
  • Q2. Standards and Lean manufacturing
Round 4 - Technical 

(1 Question)

  • Q1. Interview with VP
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Apr 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Questions about Productivity of Excavators 1. What is the optimum output and what the factors affecting it? 2. How can we increase the Productivity? 3. What can be the highest possible output?
  • Q2. What Exemption can be taken from Statutory bodies in an Opencast Mine?
  • Ans. 

    Exemptions from statutory bodies in an opencast mine include environmental clearances, land acquisition permissions, and mining lease approvals.

    • Environmental clearances are required from bodies like the Ministry of Environment, Forest and Climate Change.

    • Land acquisition permissions may be needed from local government bodies or landowners.

    • Mining lease approvals are typically obtained from the relevant state government d...

  • Answered by AI
  • Q3. What precautions do you take as Shift incharge during blasting?
  • Ans. 

    I ensure proper safety measures are in place, including securing the area, using appropriate equipment, and following all regulations.

    • Securing the blasting area to prevent unauthorized access

    • Using appropriate personal protective equipment (PPE) such as helmets, goggles, and ear protection

    • Following all safety regulations and guidelines set by the company and relevant authorities

    • Conducting regular safety inspections and ...

  • Answered by AI
  • Q4. What is your responsibility with MDO?
Round 3 - Technical 

(1 Question)

  • Q1. Just about my Service Experience and Job role so far in different organisations
Round 4 - Discussion with Executive 

(1 Question)

  • Q1. What is your current job assignment? What do you do to justify it?
Round 1 - Technical 

(1 Question)

  • Q1. Quation related siemens plc automation and dc/ ac motors/drives

Interview Preparation Tips

Interview preparation tips for other job seekers - Focus on technical questions and the dc motor maintenance,scheduling the pm
Interview experience
4
Good
Difficulty level
Hard
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Nov 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Explain GTG Operation and load sharing
  • Ans. 

    GTG operation involves multiple generators working together to share the load and ensure continuous power supply.

    • GTG stands for Gas Turbine Generator

    • In GTG operation, multiple generators are synchronized to work together

    • Load sharing ensures that the power demand is distributed evenly among the generators

    • This helps in maintaining a stable power supply and prevents overloading of any single generator

  • Answered by AI

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
Hard
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Mar 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Details of power station design
  • Ans. 

    Power station design involves the planning and construction of facilities that generate electricity.

    • Design includes selection of appropriate technology and equipment

    • Consideration of environmental impact and safety measures

    • Layout and construction of buildings and infrastructure

    • Integration with power grid and transmission systems

    • Examples include thermal power plants, hydroelectric power plants, and wind farms

  • Answered by AI
  • Q2. Efficiency of Power station
  • Ans. 

    Efficiency of a power station is the ratio of output power to input power.

    • Efficiency can be improved by using advanced technologies and equipment.

    • Regular maintenance and cleaning of equipment can also improve efficiency.

    • Efficiency can be affected by factors such as fuel quality, weather conditions, and demand for electricity.

    • For example, a power station using combined cycle technology can achieve an efficiency of up to...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Stick to the basiscs and don't show overconfidence. Details overall knowledge must have to crack the interview

Rungta Mines Interview FAQs

How many rounds are there in Rungta Mines Senior Manager interview?
Rungta Mines interview process usually has 2 rounds. The most common rounds in the Rungta Mines interview process are Resume Shortlist and Technical.
What are the top questions asked in Rungta Mines Senior Manager interview?

Some of the top questions asked at the Rungta Mines Senior Manager interview -

  1. Ball mill working princip...read more
  2. Electrical and instrument (project and maintenan...read more
  3. Basics in engineering like gear module, hydrostatic,and hydrodyna...read more

Tell us how to improve this page.

Rungta Mines Senior Manager Interview Process

based on 2 interviews

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Hindustan Zinc Interview Questions
3.8
 • 43 Interviews
Jindal Power Interview Questions
4.1
 • 29 Interviews
Gravita Interview Questions
4.2
 • 19 Interviews
Toyota Tsusho Interview Questions
4.0
 • 14 Interviews
View all
Rungta Mines Senior Manager Salary
based on 95 salaries
₹9.5 L/yr - ₹22.3 L/yr
26% less than the average Senior Manager Salary in India
View more details

Rungta Mines Senior Manager Reviews and Ratings

based on 15 reviews

4.4/5

Rating in categories

3.8

Skill development

4.4

Work-life balance

4.3

Salary

4.1

Job security

4.0

Company culture

3.9

Promotions

4.2

Work satisfaction

Explore 15 Reviews and Ratings
Junior Manager
347 salaries
unlock blur

₹3 L/yr - ₹9 L/yr

Assistant Manager
343 salaries
unlock blur

₹3.6 L/yr - ₹12 L/yr

Deputy Manager
208 salaries
unlock blur

₹5.7 L/yr - ₹14 L/yr

Manager
121 salaries
unlock blur

₹6.5 L/yr - ₹18 L/yr

Senior Manager
95 salaries
unlock blur

₹9.5 L/yr - ₹22.3 L/yr

Explore more salaries
Compare Rungta Mines with

Hindalco Industries

4.2
Compare

Hindustan Zinc

3.8
Compare

Vedanta Resources

3.7
Compare

Carborundum Universal Limited

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview